Change to the Inspection Plan 1/1/08 - 12/31/08
ML073540355
Person / Time
Site: Palisades  Entergy icon.png
Issue date: 12/19/2007
From: Christine Lipa
Reactor Projects Region 3 Branch 4
To: Schwarz C
Entergy Operations
References
Download: ML073540355 (5)


Text

December 19, 2007 Mr. Christopher J. Schwarz Site Vice President Entergy Nuclear Operations Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530

SUBJECT:

CHANGE TO THE INSPECTION PLAN - PALISADES NUCLEAR PLANT

Dear Mr. Schwarz:

As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.

The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Christine Lipa, Chief Projects Branch 4 Division of Reactor Projects Docket No. 50-255;72-007 License No. DPR-20

Enclosure:

As Stated cc w/encl:

M. Kansler, President and Chief Executive Officer/Chief Nuclear Officer J. Herron, Senior Vice President Senior Vice President, Engineering and Technical Services M. Balduzzi, Senior Vice President and Chief Operating Officer, RegionalOperations, NE O. Limpias, Vice President, Engineering J. Ventosa, General Manager, Engineering J. DeRoy, Vice President, Operations SupportDirector, NSA J. McCann, Director, Nuclear Safety & Licensing E. Harkness, Director of Oversight General Manager, Plant Operations C. Faison, Manager, Licensing L. Lahti, Manager, Licensing W. Dennis, Assistant General Counsel W. DiProfio W. Russell G. Randolph Supervisor, Covert Township Office of the Governor State Liaison Officer, State of Michigan Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division Michigan Office of the Attorney General

Please contact me at 630-829-9619 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Christine Lipa, Chief Projects Branch 4 Division of Reactor Projects Docket No. 50-255;72-007 License No. DPR-20

Enclosure:

As Stated cc w/encl:

M. Kansler, President and Chief Executive Officer/Chief Nuclear Officer J. Herron, Senior Vice President Senior Vice President, Engineering and Technical Services M. Balduzzi, Senior Vice President and Chief Operating Officer, RegionalOperations, NE O. Limpias, Vice President, Engineering J. Ventosa, General Manager, Engineering J. DeRoy, Vice President, Operations SupportDirector, NSA J. McCann, Director, Nuclear Safety & Licensing E. Harkness, Director of Oversight General Manager, Plant Operations C. Faison, Manager, Licensing L. Lahti, Manager, Licensing W. Dennis, Assistant General Counsel W. DiProfio W. Russell G. Randolph Supervisor, Covert Township Office of the Governor State Liaison Officer, State of Michigan Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division Michigan Office of the Attorney General DOCUMENT NAME:G:\\BRANCH TSS\\ALL MOC\\MIDCYCLE 2006 TO 2007\\ROP REALIGNMENT LETTER\\PALISADES.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME CLipa:cms DATE 12/19/07 OFFICIAL RECORD COPY

Letter to C. Schwarz from C. Lipa dated December 19, 2007

SUBJECT:

CHANGE TO THE INSPECTION PLAN - PALISADES NUCLEAR PLANT DISTRIBUTION:

MLC TEB RidsNrrDirsIrib MAS KGO JKH3 JBG JAE CAA1 DRPIII DRSIII PLB1 TXN

Palisades Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 01/14/2008 01/18/2008 7112102 IP ALARA Planning and Controls 2

BI OL

- BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 02/04/2008 02/08/2008 7111111B IP Licensed Operator Requalification Program 3

BI PI&R

- BIENNIAL PI&R INSPECTION Baseline Inspections 03/31/2008 04/18/2008 71152B IP Identification and Resolution of Problems 1

ISFSI

- ISFSI INSPECTION Other Routine 03/01/2008 03/30/2008 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 05/19/2008 05/23/2008 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 05/19/2008 05/23/2008 71151-BI01 IP Reactor Coolant System Activity Baseline Inspections 05/19/2008 05/23/2008 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 05/19/2008 05/23/2008 71151-PR01 IP RETS/ODCM Radiological Effluent 1

2515/172

- TI 2515/172 RCS WELD INSPECTION Generic Safety Inspec 05/19/2008 06/07/2008 2515/172 IP Reactor Coolant System Dissimiliar Metal Butt Welds 3

BI EP

- EP EXERCISE INSPECTION / PI VERIFICATION EP Baseline Inspectio 09/15/2008 09/19/2008 7111401 IP Exercise Evaluation Baseline Inspections 09/15/2008 09/19/2008 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 09/15/2008 09/19/2008 71151-EP02 IP ERO Drill Participation Baseline Inspections 09/15/2008 09/19/2008 71151-EP03 IP Alert & Notification System 3

OL EXAM

- INITIAL LIC OP EXAM PREP PALISADES 2008 Not Applicable 09/29/2008 10/03/2008 W90188 PALISADES - INITIAL EXAM - SEPT/OCT 2008 3

OL EXAM

- INITIAL LIC OP EXAM PALISADES 2008 Not Applicable 10/20/2008 10/31/2008 W90188 PALISADES - INITIAL EXAM - SEPT/OCT 2008 5

BI ENG

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 11/03/2008 12/05/2008 7111121 IP Component Design Bases Inspection 1

BI RP

- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 12/08/2008 12/12/2008 7112101 IP Access Control to Radiologically Significant Areas