Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18017A231 + (Change of Reactor Administrator Update)
- CPSES-200401067, Change of Regulatory Affairs Point of Contact + (Change of Regulatory Affairs Point of Contact)
- ML100060116 + (Change of Response Date Regarding Request for Additional Information for Generic Letter 2004-02 Potential Impact of Debris Blockage During Design-Basis Accidents at Pressurized)
- ML16097A280 + (Change of Safety Project Manager for the Grand Gulf License Renewal Application Review)
- ML050450187 + (Change of Sc for Grand Gulf, Effective Immediately Mr. Allen Howe Is Section Chief for PDIV-1)
- ML042580161 + (Change of Sc to R. Gramm from S. Dembek)
- ML042570542 + (Change of Sc to R.Gramm from S.Dembek)
- ML13298A091 + (Change of Schedule Letter for Environmental and Safety Review of Seabrook License Renewal Application)
- ML100470679 + (Change of Scope for Triennial Fire Protection Baseline Inspection While in Transition to 10 CFR Part 50.48(C) Is in Progress (NRC Inspection Report No. 05000261/2010007))
- ML051320210 + (Change of Section Chief - Effective 05/15/05 Mr. David Terao Is Section Chief for PDIV-1)
- ML051320184 + (Change of Section Chief Effective 05/15/2005 - Mr. D. Terao Will Be Section Chief for PDIV-1)
- ML050590362 + (Change of Section Chief for ANO, Units 1 and 2 - - Effective Immediately Mr. A. Howe Is Section Chief for PDIV-1)
- ML051320208 + (Change of Section Chief for PDIV-1-Effective 5/15/05 Mr. D.Terao Will Be Section Chief for PDIV-1)
- ML051320207 + (Change of Section Chief, Effective 05/15/05 Mr.D.Terao Will Be Section Chief for PDIV-1)
- ML022800448 + (Change of Street and Mailing Address for Lisa F. Vaughn)
- 05000280/FIN-2016004-01 + (Change of Surveillance Frequency Caused the Charging Service Water Header to Become Biologically Fouled)
- ML062050219 + (Change of U.S. (NRC) Branch Chief an Office of (NRR) Points of Contact for Nuclear Energy Institute (NEI) and Topic of Interest)
- ML13029A741 + (Change of U.S. Nuclear Regulatory Commission (NRC) Branch Chief for TSTF Activities and Topics of Interest)
- ML062270451 + (Change of U.S. Nuclear Regulatory Commission (NRC) Branch Chief the Boiling Water Reactors Owners Group (BWROG) Activities and Topics of Interest)
- RC-17-0049, Change of the Commitment Date of DRIB/105A&B Door Submittal + (Change of the Commitment Date of DRIB/105A&B Door Submittal)
- RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal + (Change of the Commitment Date of DRIB/105A&B Door Submittal)
- L-2014-185, Change of the Milestone 8 Completion Date + (Change of the Milestone 8 Completion Date)
- TSTF-093 + (Change the Frequency of Pressurizer Heater Testing from 92 Days to 18 Months)
- ML20072B917 + (Change to 930823 TS Change Request 90-13-0,revising Requirements for Holding SRO Licenses for Certain Plant Mgt Positions to Only Require Superintendent - Operations or Assistant Superintendent - Operations to Hold SRO License)
- CNL-13-115, Change to Commitment Date Response to NRC Request for Additional Information Related to Integrated Plan in Response to Commission Order EA-12-051 + (Change to Commitment Date Response to NRC Request for Additional Information Related to Integrated Plan in Response to Commission Order EA-12-051)
- ML031770234 + (Change to Commitment Date for Response to Request for Additional Information - Amendment Application Pressure-Temperature Limit Curves (TAC No.MB6687 & MB6703))
- LR-N04-0510, Change to Commitment Inservice Leak and Hydrostatic Testing + (Change to Commitment Inservice Leak and Hydrostatic Testing)
- ML043360337 + (Change to Commitment Inservice Leak and Hydrostatic Testing)
- LR-N02-0400, Change to Commitment Regarding 4166 Volt Switchgear Room Suppression + (Change to Commitment Regarding 4166 Volt Switchgear Room Suppression)
- LR-N02-0374, Change to Commitment Regarding Cable Raceway Fire Wrap Resolution Plan + (Change to Commitment Regarding Cable Raceway Fire Wrap Resolution Plan)
- U-604525, Change to Commitment Schedule to Implement Nuclear Energy Institute (NEI) Initiative on Open Phase Condition + (Change to Commitment Schedule to Implement Nuclear Energy Institute (NEI) Initiative on Open Phase Condition)
- U-604541, Change to Commitment Schedule to Implement Nuclear Energy Institute (NEI) Initiative on Open Phase Condition + (Change to Commitment Schedule to Implement Nuclear Energy Institute (NEI) Initiative on Open Phase Condition)
- ML13304A524 + (Change to Commitment for License Renewal (TAC ME8961 & ME8962))
- LR-N02-0084, Change to Commitments Re Cable Raceway Fire Wrap Resolution Plan & 4160 Volt Switchgear Room Suppression for Salem Generating Station Unit Nos. 1 & 2 + (Change to Commitments Re Cable Raceway Fire Wrap Resolution Plan & 4160 Volt Switchgear Room Suppression for Salem Generating Station Unit Nos. 1 & 2)
- L-91-018, Change to Commitments Regarding Carbon Dioxide Suppression System + (Change to Commitments Regarding Carbon Dioxide Suppression System)
- ML101670162 + (Change to Commitments for Shift Technical Advisor Program)
- ML101170163 + (Change to Commitments for Shift Technical Advisor Program)
- ML023240231 + (Change to Correspondence Addressee and Service List Update)
- ML110270108 + (Change to Developmental Technical Specification (TS) Section 3.1.8, Rod Position Indication)
- ML102850520 + (Change to Developmental Technical Specification (TS) Sections 3.6.11, Ice Bed, and 3.1.8, Rod Position Indication)
- TSTF-106 + (Change to Diesel Fuel Oil Testing Program)
- GO2-07-174, Change to Distribution List + (Change to Distribution List)
- 05000361/FIN-2003003-03 + (Change to EAL C3 resulting in decrease in effectiveness of EP in violation of 10 CFR 50.54(q))
- ML23118A075 + (Change to Education Requirement for Cold License Training for Direct SRO Candidates)
- ML111300431 + (Change to Emergency Action Level Scheme)
- ML100080231 + (Change to Emergency Action Level Scheme Based on NEI-99-01, Revision 5)
- ML042570125 + (Change to Emergency Action Levels)
- HNP-02-104, Change to Emergency Plan Implementing Procedures, Plant Operational Manual, Volume 2, Part 5, PEP-270, Revision 8, PEP-310, Revision 13 and PEP-342, Revision 2 + (Change to Emergency Plan Implementing Procedures, Plant Operational Manual, Volume 2, Part 5, PEP-270, Revision 8, PEP-310, Revision 13 and PEP-342, Revision 2)
- NOC-AE-16003416, Change to Emergency Plan Implementing Procedure, Revision 9 to 0PGP03-ZA-0106, Emergency Medical Response Plan + (Change to Emergency Plan Implementing Procedure, Revision 9 to 0PGP03-ZA-0106, Emergency Medical Response Plan)
- ML16300A151 + (Change to Emergency Plan Implementing Procedure, Revision 9 to 0PGP03-ZA-0106, Emergency Medical Response Plan)
- ML022310377 + (Change to Emergency Plan Implementing Procedures, Plant Operational Manual, Volume 2, Part 5, PEP-230, PEP-240 and PEP-260)
- HNP-02-152, Change to Emergency Plan Implementing Procedures, Rev. 10 to PEP-250 and Rev. 3 to PEP-342 + (Change to Emergency Plan Implementing Procedures, Rev. 10 to PEP-250 and Rev. 3 to PEP-342)