Change to 930823 TS Change Request 90-13-0,revising Requirements for Holding SRO Licenses for Certain Plant Mgt Positions to Only Require Superintendent - Operations or Assistant Superintendent - Operations to Hold SRO License
ML20072B917
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 08/04/1994
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20072B918 List:
References
NUDOCS 9408160300
Download: ML20072B917 (3)


Text

Station Support Departmtnt

'8

.g' 25=

kjf55 PECO ENERGY = "~ c -

Nudear Group Headquarters 9M Cheste rbrook floulevard Wayne. PA D087 5691 August 4,1994 Docket Nos. 50-352 50-353 License Nos. NPF-39 l NPF-85 U. S. Nuclear Regulatory Commissior; Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2 Technical Specifications Change Request No. 90-13-0 Revised Technical Specifications Pages Gentlemen:

By letter dated April 23,1993, PECO Energy Company submitted Technical Specifications Change Request No. 90-13-0, in accordance with 10CFR 50.90, requesting an amendment to the Technical Specifications (TS) (i.e., Appendix A) of Operating License Nos. NPF-39 and NPF-85. Subsequently, by letter dated October 8,1993, the Nuclear Regulatory Commission (NRC) issued Amendment No. 63 to Facility Operating License No. NPF-39 and Amendment No. 28 to Facility Operating License No. 85 for Limerick Generating Station, Units 1 and 2, respectively. These Amendments, which involved changes to the requirements for holding Senior Reactor Operator (SRO) Licenses for certain Plant Management positions, were a modified version of the changes originally requested by PECO Energy. The NRC's Safety Evaluation Report which supported the Amendments stated that the proposed change to relax the off-shift SRO license holder requirement to allow either the Plant Manager or Superintendent - Operations or Assistant Superintendent - Operations to hold an SRO License was being further evaluated by the Human Factors Assessment Branch.

The purpose of this letter is to change the original TS change request such that only the Superintendent - Operations or the Assistant Superintendent -

Operations are required to hold an SRO license. The proposed replacement l pages for the Limerick, Units 1 and 2, TS are contained in Attachment 1. This information is being submitted under affirmation, and the required affidavit is enclosed. We request that, if approved, these changes become effective by l September 9,1994, in order to support planned organizational changes. l M8"22888R M888ssa o} W AM/kcqHad pa/M//NyW7'i @ I

Page 2 If you have any questions, please do not hesitate to contact us. ,

Very truly yours, S J' f ch5 lNa G. A. Hunger, Jr.,

Director - Licensing Section DPH/clw Attachments Enclosure cc: T. T. Martin, Administrator, Region I, USNRC - w/ attachments N. S. Perry, USNRC Senior Resident inspector, LGS - w/ attachments R. R. Janati, Director, PA Bureau of Radiological Protection - w/ attachments 1

i i

l l

COMMONWEALTH OF PENNSYLVANIA  :

ss.

COUNTY OF CHESTER W. H. Smith, Ill, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy Company; the Applicant herein; that he has read the foregoing information providing revised Technical Specifications pages in support of Technical Specifications Change Request No. 90-13-0 submitted to modify the requirement for individuals filling certain plant management positions to hold a Senior Reactor Operator License, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, Information and belief.

h, L/

Vice President Subscribed and sworn to before me this day of- 4 1994.

h ~ 4h' %/ /

Notary Public Eta AS tN vyPdic w!2s"#d"JL%s