George A. Lippard Vice President, Nuclear Operations 803.345.4810 A SCANA COMPANY June 18,2018 RC-18-0074 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Dear Sir / Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 CHANGE OF THE COMMITMENT DATE OF DRIB/105A&B DOOR SUBMITTAL
References:
- 1. George A. Lippard (SCE&G) to NRC Document Control Desk, "Reply to a Notice of Violation" dated December 20, 2016, (RC-16-0173)
[ML16355A277]
- 2. George A. Lippard (SCE&G) to NRC Document Control Desk, "Change of the Commitment Date of DRIB/105A&B Door Submittal" dated November 28, 2017, (RC-17-0161) [ML17333A966]
South Carolina Electric & Gas Company (SCE&G), acting for itself and as an agent for South Carolina Public Service Authority (Santee Cooper), is providing notification of an intended change to a commitment date. Specifically, SCE&G identified in Reference 1 that a License Amendment Request (LAR) identifying DRIB/105A&B as doors that have been evaluated for variances from NFPA 80 requirements would be submitted. In Reference 2, SCE&G committed that the submittal would be made by June 30, 2018.
SCE&G has identified the need for additional time to complete its preparation of the LAR submittal. SCE&G will submit the LAR by August 31, 2018. An updated commitment is attached to this letter.
V. C. Summer Nuclear Station
- P. 0. Box 88 - Jenkinsville, South Carolina
- 29065
- F (803) 941-9776
- www.sceg.com
Document Control Desk CR-16-05919 & CR-18-02427 RC-18-0074 Page 2 of 2 Should you have any questions on this letter or attached commitment, please contact Mr. Bruce L. Thompson at (803) 931-5042.
Very Truly Yours, George A. Lippard JRB/GAL/jmg
Attachment:
Updated Commitment c:
J. E. Addison W. K. Kissam J. B. Archie J. H. Hamilton C. Haney S. A. Williams L. W. Harris P. Ledbetter K. M. Sutton NRC Resident Inspector NSRC RTS (CR-16-05919 CR-18-02427)
File (813.20)
PRSF (RC-18-0074)
G. J. Lindamood W. M. Cherry
Document Control Desk Attachment CR-16-05919 & CR-18-02427 RC-18-0074 Page 1 of 1 VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)
DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 ATTACHMENT UPDATED COMMITMENT Commitment Due Date/Event VCSNS will submit a LAR to: (1) update the Fire Probabilistic Risk Assessment (Table W') to correct modeling errors; (2) address de-scoped plant modifications; (3) identify DRIB/105A&B as doors that have been evaluated for variances from NFPA 80 requirements; and (4) revise documentation impacted by the changes.
August 31, 2018