Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000397/1998021 + (11:03:22, 8 January 2025)
- ML17284A801 + (11:03:23, 8 January 2025)
- ML17284A799 + (11:03:24, 8 January 2025)
- ML17284A798 + (11:03:25, 8 January 2025)
- ML17284A797 + (11:03:25, 8 January 2025)
- GO2-98-181, Forwards Rev 28 & Proposed Rev 29 to Operational QA Program Description, WPPSS-QA-004.Rev 28 Has Minor Change to Section 1.3.3.1.1 to Restructure Quality Svcs Group.Proposed Rev 29 Modifies Sections 1,2,4,6,12,15,18 & App I,Ii & III + (11:03:26, 8 January 2025)
- ML17284A794 + (11:03:28, 8 January 2025)
- ML17284A791 + (11:03:29, 8 January 2025)
- ML17284A792 + (11:03:29, 8 January 2025)
- IR 05000397/1998020 + (11:04:46, 8 January 2025)
- ML17284A789 + (11:04:48, 8 January 2025)
- ML17284A787 + (11:04:49, 8 January 2025)
- TAC:MA3577 + (11:04:50, 8 January 2025)
- ML17284A786 + (11:04:51, 8 January 2025)
- GO2-98-098, Forwards Emergency Preparedness Exercise Objective & Limitations for WNP-2 Exercise to Be Conducted on 980916,IAW 10CFR50.47(b)(14) + (11:04:52, 8 January 2025)
- ML17284A784 + (11:04:54, 8 January 2025)
- GO2-98-174, Monthly Operating Rept for Sept 1998 for WNP-2.With + (11:04:55, 8 January 2025)
- ML17284A781 + (11:04:57, 8 January 2025)
- ML17284A780 + (11:04:58, 8 January 2025)
- TAC:MA2508 + (11:04:58, 8 January 2025)
- GO2-98-171, Forwards Response to NRC 980730 RAI Re GL 96-06 Relative to Waterhammer & two-phase Flow in Containment Air Cooler Water Sys + (11:04:59, 8 January 2025)
- GO2-98-172, Informs That Util Implemented Severe Accident Mgt Program with Issuance of Revised EOPs & Severe Accident Guidelines (Sags) on 980715,per Commitment in 950328 ltr.WNP-2 Eop/Sag Differences to BWROG Epg/Sag Noted in Encl App a + (11:05:01, 8 January 2025)
- GO2-98-170, Informs NRC of Change to Commitment Made in Response to Violation Noted in Insp Rept 50-397/98-10 Re Reviews of Outage Exposure Goals.Spring Refueling Outage Rescheduled for Sept 1999.Dose Goals Review Will Be Conducted by 990331 + (11:05:03, 8 January 2025)
- IR 05000397/1998019 + (11:05:06, 8 January 2025)
- ML17284A774 + (11:05:07, 8 January 2025)
- ML17284A772 + (11:05:08, 8 January 2025)
- IR 05000397/1998011 + (11:05:20, 8 January 2025)
- GO2-98-166, Monthly Operating Rept for Aug 1998 for WNP-2.With + (11:05:22, 8 January 2025)
- ML17284A769 + (11:05:22, 8 January 2025)
- ML17284A767 + (11:05:24, 8 January 2025)
- ML17284A766 + (11:05:25, 8 January 2025)
- ML17284A764 + (11:05:26, 8 January 2025)
- ML17284A763 + (11:05:27, 8 January 2025)
- ML17284A762 + (11:05:28, 8 January 2025)
- ML17284A761 + (11:05:29, 8 January 2025)
- ML17284A759 + (11:05:30, 8 January 2025)
- ML17284A760 + (11:05:30, 8 January 2025)
- ML17284A758 + (11:05:31, 8 January 2025)
- 05000397/LER-1998-014, :on 980807,completion of TS 3.8.1.F Required Shutdown Due to Inoperability of EDG-2 Was Noted.Caused by Degraded Voltage Regulator for DG-2.Replaced Voltage Regulator & Associated Scrs.With + (11:05:34, 8 January 2025)
- 05000397/LER-1998-013, :on 980805,ESF Actuations Were Noted Due to Deenergization of Vital Electrical Bus SM-8.Caused by Inadequate Direction in Troubleshooting Plan.Will Conduct Training for Engineering Personnel.With + (11:05:36, 8 January 2025)
- 05000397/LER-1998-015, :on 980808,discovered Reactor Coolant Pressure Boundary Leak During Shutdown Conditions.Caused by Leakage from Socket Weld (Fwb 63) on Elbow Connection.Failed Piping Connection Was Replaced.With + (11:05:38, 8 January 2025)
- GO2-98-162, Requests Withdrawal of 980805 Proposed TS Amend,Modifying SR 3.8.4.7 to Allow Performance Discharge Test of SR 3.8.4.8 to Be Performed in Lieu of Battery Svc Test + (11:05:39, 8 January 2025)
- ML17284A753 + (11:05:40, 8 January 2025)
- ML17284A752 + (11:05:41, 8 January 2025)
- ML17284A750 + (11:05:42, 8 January 2025)
- GO2-98-163, Forwards WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998, Per Section XI of ASME Boiler & Pressure Vessel Code Article IWA-6240 + (11:05:43, 8 January 2025)
- ML17284A749 + (11:05:43, 8 January 2025)
- ML17284A746 + (11:05:46, 8 January 2025)
- ML17284A744 + (11:05:46, 8 January 2025)
- GO2-98-155, Informs That WNP-2,1998 Emergency Exercise Scenario Has Been Revised to Address Concerns Raised by Both FEMA & Nrc. Revised Section 6 of Scenario Manual,Encl.W/O Encl + (11:05:47, 8 January 2025)
- TAC:MA0063 + (11:05:48, 8 January 2025)