Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9810070168'OC.DATE:
98/09/30
NOTARIZED: NO
DOCKET
~
~
~
~
~
~
~
FACIL:50-397 WPPSS Nuclear Project,
Unit 2, Washington Public
Powe
05000397
AUTH.NAME
AUTHOR AFFILIATION
PICK, G.A.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.,
Washington Public Power Supply System
SUBJECT: Forwards insp rept 50-397/98-19
on 980719-0829
Ec notice of
violation.
DISTRIBUTION CODE: IEOIF
COPIES
RECEIVED: LTR I ENCL
J
SIZE: 5 +Ik
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
C
A
RECIPIENT
ID CODE/NAME
PD4-2
COPIES
LTTR ENCL
1
1
RECIPIENT
ID CODE/NAME
POSLUSNY
C
COPIES
LTTR ENCL
1
1
INTERNAL: ACRS
ILE ENT
NRR DR%ÃfP CB
NUDOCS-ABSTRACT
OGC/HDS3
EXTERNAL: LITCO BRYCE,J H
NRC PDR
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HOHB,
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
NOAC
NUDOCS, FULLTEXT
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D
OAOED IFROM
ELECTRONIC PILE
NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION
LIST.'R
REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROi
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
<p,S fitg~
Wp
0+
Cy
gc,
Cl
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION IV
611 RYAN PLAZAORIVE. SUITE 400
ARLINGTON.TEXAS 76011.6064
EA 98-462
September 30, 1998
Mr. J. V. Parrish {MailDrop 1023)
Chief Executive Officer
Washington. Public Power Supply System
P.O. Box 968
Richland, Washington
99352%968
SuBJECT: NRC INSPECTION REPORT 50-397/98-19 AND NOTICE OF VIOLATION
Dear Mr. Parrish:
From July 19 through August 29, 1998, an inspection was conducted at your Washington
Nuclear Project-2 reactor facility. The enclosed report presents the scope and results of that
inspection.
During the inspection period, the conduct of licensed activities at your facilitywas highlighted by
material condition deficiencies associated with the emergency diesel generators.
Your staff
effectively identified the root causes of those deficiencies and took appropriate corrective
actions to resolve them. However, in the process of investigating the root causes, several
performance weaknesses
were identified. A cited violation against 10 CFR 50.59 was identified
when, in the process of testing the Division II emergency diesel generator, your staff approved
a test procedure that should have required a change to Technical Specifications.
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violation are described in detail in the enclosed re'port. The NRC has
concluded that information regarding the reasons for the violation, and the corrective actions
taken and planned to correct the violation to prevent recurrence, is already adequately
addressed
on the docket in the enclosed report. Therefore, you are not required to respond to
this letter unless the description therein does not accurately reflect your corrective actions or
your positicn.
In that case, or if you choose to respond, you should followthe instructions
specified in the enclosed Notice.
9810070i68
980930
ADOCK 05000397
Washington Public Power Supply System
-2-
Should you have any questions concerning this inspection, we willbe pleased to discuss them
with you.
Sincerely,
Docket No.:
50-397
License No.:
Enclosures:
1.
2.
NRC Inspection Report
50-397/98-19
cc w/enclosures:
Chairman
Energy Facility Site Evaluation Council
P.O. Box 43172
Olympia, Washington
98504-3172
Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. D. W. Coleman (Mail Drop PE20)
Manager, Regulatory Affairs
Washington Public Power Supply System
P.O. Box 968
Richland; Washington
99352-0968
G. A. ',
cting Chief
Project Branch E
Division of Reactor Projects
Washington Public Power Supply System
-3-
Mr. Albert E. Mouncer (Mail Drop 396)
Chief Counsel
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing
~
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Perry D. Robinson, Esq.
Winston 8 Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
0
Washington Public Power Supply System
-4-
SEP 30
l998
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
G.Michael Vasquez, Acting EO
W. L. Brown, RC
J. Lieberman, OE (MS: 7-H5)
OE:EA File (MS: 7-H5)
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:tt WN2tWN819RP.SAB
To receive co
of document, indicate in box: "C" = Co
without enclosures
"E" = Co
with enclosures "N" = No co
RIV:SRI:DRP/E
SABo nton
9/24/98
RI:DRP/E
JES
ets
9/24/98
BC:DRP/E
GAPick
.
9/9~/98
OFFICIAL RECORD COPY
Washington Public Power Supply System
-4-
SEP 30
l998
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot.(FXT)
bcc to DCD (IE01)
bcc distrib. by RIV
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
G.Michael Vasquez, Acting EO
W. L. Brown, RC
J. Lieberman, OE (MS: 7-H5)
OE:EA File (MS: 7-H5)
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:QWN25WN819RP.SAB
To receive co
of document, indicate In box: "C" = Co
without enclosures
"E ~ Co
with enclosures
N" ~ No co
RIV:SRI:DRP/E
SABo nton
9/24/98
RI:DRP/E
JES
ets
9/24/98
BC:DRP/E
6APick
9/5~/98
OFFICIALRECORD COPY