Forwards Insp Rept 50-397/98-20 on 980824-0917 & Notice of Violation Re Failure to Include Reactor Bldg Floor Drain cross-connect Valves within Maint Monitoring Program
ML17284A787
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/16/1998
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17284A788 List:
References
50-397-98-20, EA-98-452, EA-98-480, NUDOCS 9810220280
Download: ML17284A787 (8)


See also: IR 05000397/1998020

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

~

~

~

CCESSION NBR:9810220280

DOC.DATE: 98/10/16

NOTARIZED: NO

DOCKET ¹

FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe

05000397

AUTH.NAME

AUTHOR AFFILIATION

GWYNN,T.P.

Region

4 (Post

820201)

l

RECIP . NAME

RECIPIENT AFFILIATION

PARRISH,J.V.

Washington Public Power Supply System

SUBJECT:

Forwards insp rept 50-397/98-20

on 980824-0917

&, notice of

violation.

DISTRIBUTION CODE:

XE01F

COPIES

RECEIVED:LTR

t

ENCL Q

SIZE:

TITLE: General

(50 Dkt) -Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NAME

PD4-2

PD

INTERNAL: ACRS

AEOD TTC

NRR DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3

EXTERNAL: LITCO BRYCE,J H

NRC PDR

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

POSLUSNY,C

AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN4

PILE

01

NOAC

NUDOCS PULLTEXT

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1',

1

1

1

R

Y

D

MADEDN03I

BlBCTaonic aLE

E

N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS,.

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPXES

REQUIRED: LTTR

19

ENCL

19

~p,s Sag(

Cg

0

't y*y4

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE. SUITE 400

ARLINGTON,TEXAS 76011 6064

OCT

l 6 l998

EA 98-452

EA 98-480

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

SUBJECT: NRC AITFOLLOWUP INSPECTION REPORT 50-397/98-20 AND NOTICE OF

VIOLATION

Dear Mr. Parrish:

From August 24 through September

17, 1998, a followup inspection was conducted at your

Washington Nuclear Project-2 reactor facilityto review the facts surrounding the June 17 fire

protection system rupture and internal flooding event.

The enclosed report presents the. scope

and results of that inspection.

In summary, we found that your staff, as an organization, responded well to the challenges of

the event demonstrating effective teamwork with a focus on safety.

Notwithstanding those

successes,

the event itself represented

a culmination of several organizational performance

issues.

These included:

(1) weak implementation of the corrective action process for the fire

protection program, (2) a maintenance program for the floor drain system that did not reflect the

importance of its design function, and (3) a lack of sensitivity for the impact of hot work on the

fire protection system.

Three violations of NRC requirements were identified. The first violation

involved the failure to include the reactor building floor drain cross-connect valves within your

maintenance monitoring program (EA 98-452). The second violation resulted from the failure to

take prompt corrective actions for identified inadequacies

in the controls for hot work. The third

violation related to inadequate compensatory measures for a fire protection system impairment.

The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding these violations are described in detail in the enclosed report.

Please note that you

are required to respond to this letter and should followthe instructions specified in the enclosed

Notice when preparing your response.

The NRC will use your re.ponse,

in part, to determine

whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

In addition, one apparent violation (EA 98-480) was identified and is being considered for

escalated enforcement in accordance with the "General Statement of Policy and Procedure for

NRC Enforcement Actions" (Enforcement Policy), NUREG-1600, Revision 1. The violation

involved the inadequate design of the fire protection water supply system such that the system

can generate destructive forces upon response to a fire detection signal. The failure of the fire

protection water supply system pressure boundary and the resultant inability of the system to

suppress a potential fire was inconsistent with the requirements of 10 CFR Part 50, Appendix A,

98i0220280 98iOi6

PDR

ADOCK 05000397

9

PDR

e

Washington Public Power Supply System

-2-

General Design Criterion 3, "Fire Protection."

The circumstances surrounding this apparent

violation, the significance of the issue, and the need for lasting and effective corrective actions

were discussed with members of your staff at public meetings in the NRC Region IV offices on

July 2 and at your WNP-2 facilityon July 8. The regulatory characterization of the issue was

further discussed during the inspection exit meeting on September

17. As a result, it may not

be necessary to conduct a predecisional enforcement conference

in order to enable the NRC to

make an enforcement decision.

Before the NRC makes its enforcement decision, we are providing you an opportunity to either

(1) respond to the apparent violation addressed

in this inspection report within 30 days of the

date of this letter or (2) request a predecisional enforcement conference.

If a conference is

held, it willbe open for public observation.

The NRC willalso issue a press release to

announce the conference.

Please contact Greg Pick at (817) 860-8270 within 7 days of the

date of this letter to notify the NRC of your intended response.

lf you elect to respond to the apparent violation, your response should be clearly marked as a

"Response to An Apparent Violation in Inspection Report No. 50-397/98-20" and should include:

(1) the reason for the apparent violation, or, if contested, the basis for disputing the apparent

violation, (2) the corrective steps that have been taken and the results achieved, (3) the

corrective steps that willbe taken to avoid further violations, and (4) the date when full

compliance willbe achieved.

Your response should be submitted under oath or affirmation and

may reference or include previous docketed correspondence,'if

the correspondence

adequately

addresses

the required response.

Ifan adequate response

is not received within the time

specified or an extension of time has not been granted by the NRC, the NRC willproceed with

its enforcement decision or schedule a predecisional enforcement conference.

In addition, please be advised that the characterization of the apparent violation described in

the enclosed inspection report may change as a result of further NRC review. You will be

advised by separate correspondence

of the results of our deliberations on this matter.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its

enclosure(s), and your response (if you choose to provide one) willbe placed in the NRC Public

Document Room (PDR). To the extent possible, your response should not include any personal

privacy, proprietary, or safeguards

information so that it can be placed in the PDR without

redaction.

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

Sine

Thomas P. Gwy n, Dir

or

Division of React

r P

j

ts

Docket No.:

50-397

License No.:

NPF-21

Washington Public Power Supply System

-3-

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-397/98-20

cc w/enclosures:

Chairman

Energy Facility Site Evaluation Council

P.O. Box 43172

Olympia, Washington

98504-31 72

Mr. Rodney L. W'ebring (Mail Drop PE08)

Vice President, Operations Support/PIO

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. D. W. Coleman (Mail Drop PE20)

Manager, Regulatory Affairs

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Mr. Paul Inserra (Mail Drop PE20)

Man" ~cr, Licensing

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

Perry D. Robinson, Esq.

Winston 8 Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

I

Washington Public Power Supply System

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

'-Mail

report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Director, ACES

Resident Inspector

DRS-PSB

.

MIS System

RIV File

OE:EA File

DOCUMENT NAME: R:i WN2tWN820RP.WPD

To receive co

of document, Indicate In box: "C" ~ Co

without enclosures

"E" = Co

with enclosures "N" = No co

RIV:RI

JS

ets*

10/14/98

C:DRP/E

GPick

10/14/98

PE/DRP/E

GJohnston*

10/1 4/98

D/DRP

PG

nn

10/1 6/98

MB:DRS

CPaulk

10/14/98

SRI:DRP/E

SBo nton*

10/14/98

D'ACES

GMVas uez

10/14/98

reviously Concurre

  • p

d

OFFICIALRECORD COPY

Washington Public Power Supply System

-4-

E-Mail report to T. Frye (TJF)"

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)-

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/E)

Senior Project Inspector (DRP/E)

Branch Chief (DRP/TSS)

Director, ACES

Resident Inspector

DRS-PSB

MIS System

RIV File

OE:EA File

DOCUMENT NAME: RA WN2<WN820RP.WPD

To receive co

of document. indicate In box:

C" ~ Co

without enclosures

"E" ~

with enclosures "N = No co

RIV:RI

JS

ets

10/1 4/98

C:DRP/E

GPick

10/14/98

PE/DRP/E

GJohnston

10/14/98

D/DRP

PG

nn

10/16/98

MB:DRS

CPaulk

10/1 4/98

SRI:DRP/E

SBo nton

10/14/98

D:ACES

GMVas uez

10/14/98

Previousl

Concurred

y