ML17284A801

From kanterella
Jump to navigation Jump to search
Corrected Cover Page Forwarding Insp Rept 50-397/98-21 on 980830-1010.No Violations Noted.Conduct of Licensed Activities at Washington Nuclear Project-2 Characterized by Strong Safety Focus on Plant Operations
ML17284A801
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 10/27/1998
From: Greg Pick
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17284A800 List:
References
50-397-98-21, EA-98-203, NUDOCS 9811160117
Download: ML17284A801 (1)


See also: IR 05000397/1998021

Text

~g8

(4

)f*

RECy

~o

nO

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZADRIVE, SUITE 400

ARLINGTON,TEXAS 760114064

OCT 27

i998

EA 98-203

Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer

Washington Public Power Supply System

P.O. Box 968

Richland, Washington

99352-0968

SUBJECT:

NRC INSPECTION REPORT 50-397/98-21

Dear Mr. Parrish:

From August 30 through October 10, 1998, an inspection was conducted at. your Washington

Nuclear Project-2 reactor facility'. The enclosed report presents the scope'and

results of that

inspection.

During the inspection period, the conduct of licensed activities at Washington Nuclear Project-2

was characterized by a strong safety focus on plant operations supported by very good human

performance.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure willbe placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we willbe pleased to discuss them

with you.

G. A. 'c,

cting Chief

Project

ra ch E

Division of Reactor Projects

Docket No.:

50-397

License No.:

NPF-21

Enclosure:

NRC Inspection. Report

50-397/98-21

98iii60ii7 98i i05

PDR

ADOCK 05000397

8

PDR