~Pjt MCfff~-
~o
+
nO es O+
V/i+
yO sP**e+
UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYANPLAZA DRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 NOV 8 1995 NEHORANDUN fOR:
J.. E. Dyer, Director, Division of Reactor Projects FROM:
H. J.
Wang, Chief, Reactor Projects Branch R
SUBJECT:
WNP-2 OVERSIGHT PANEL NEETING MINUTES - November 2, 1995 The WNP-2 Oversight Panel convened by conference call on November 2, 1995.
The topics discussed included the'ollowing:
The next proposed meetings with the licensee were:
(1)
December 12, approx.
9:00 noon (at the Arlington Texas Office) with a pre-meeting in the afternoon of December ll (2)
February 15, 20, or 26 (at the WNP-2 site)
[H. Wong to coordinate these dates with the licensee]
Proposed agenda topics for the next Panel meeting with the licensee should be provided to H.
Wong by monday, November 6 with transmit'tal to J.
Dyer by November 8 to support the December meeting.
Recommendations for inspections at WNP-2 were:
Radiation protection:
upcoming downpowers to perform control rod drive system component replacement work
[R. Barr to provide K. Brockman with possible time frames in November and December to maximize opportunities to observe work activities]
Operations:
expand T. NcKernon's operator licensing examination site visit to include control room observations and/or auxiliary operator observations Naintenance:
self and independent verification activities Use of F. Brush (Callaway resident inspector) at WNP-2 Use of J. Clifford during site visit the week of 12/4 engineering and/or operations issues K. Brockman will be at WNP-2 on ll/30 for operator license presentations (should consider possible inspection/review activities)
Should consider the use of inspectors which have been to WNP-2 for reinspection efforts (i.e.,
W. Johnson, F. Ringwald, W. Walker) 9809140360 980904 PDR ADOCK 05000397 P
/
r
~
~
W
Followup of the NC 40500 (Corrective Actions) inspection performed by the P. Koltay team should include an assessment of the current status of corrective actions.
[K. Brockman to coordinate this inspection followup]
Augmented operations inspections should occur in the February/Narch time frame to review pre-outage activities The Oversight Panel meeting with the licensee in February 1996 should include discussion of outage activities and planning
[H. Wong to coordinate this topic with the licensee]
J. Clifford's background summary is viewed as an excellent starting point for review of the areas of licensee weakness/inspection focus.
Comments on the summary should be submitted to H.
Wong.
[H. Wong to develop the summary into a suitable document for inspector use in preparation for WNP-2 inspections]
CC:
J. Callan S. Collins Oversight Panel Nembers-J.
Dyer K. Perkins K. Brockman W. Bateman J. Clifford H.
Wong R. Barr B. Henderson N.I Hammond C. Hackney D. Kunihiro