ML17284A759

From kanterella
Jump to navigation Jump to search
Summary of 960307 Oversight Panel Meeting with Util Re Schedule of Several Panel Members & Radiation Protection
ML17284A759
Person / Time
Site: Columbia 
Issue date: 03/13/1996
From: Wong H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dyer J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML17284A751 List:
References
NUDOCS 9809150338
Download: ML17284A759 (3)


Text

~ggll > Ece

'~p p

f g

p

~O sp**<<+

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYANPLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011.6064 NR l 3 l996 MEMORANDUM FROM:

SUBJECT:

FOR:

J.

E. Dyer, Director, Division of Reactor Projects H. J.

Wang, Chief, Reactor Projects Branch B

WNP-2 OVERSIGHT PANEL NEETING MINUTES - March 7, 1996 The WNP-2 Oversight Panel convened by conference call on Narch 7, 1996.

The topics discussed included the following:

A change to the next proposed meeting with the licensee was.

discussed.

The schedule of several panel

members, the Regulatory Information Conference in Washington, DC, and the start of the licensee's refueling outage precludes a meeting in April.

With the Regional Administrator's approval, the April meeting with the licensee has been postponed until Nay.

Since the'plant's refueling outage will be in progress in Iiay and to minimize the impact on the licensee, the meeting is proposed to be conducted at the site.

The proposed meeting date is during the week of Nay 13.

Any site visit coordination with Region IV senior management (J. Callan/S. Collins) and NRR senior management (R. Zimmerman) would be done separately from the Oversight Panel meeting.

would.,:::be"."ari"::.:'..'acceptablejdat An internal Oversight Panel meeting would be conducted in April.

[H. Mong to coordinate the April meeting date.]

Comments. on licensee performance The WNP-2 Oversight Panel reviewed the proposed assessment for the SPPR.

Operations some improvement Radiation Protection - some improvement Engineering - seen as the weakest area with little noticeable, improvement Maintenance only resident inspection efforts thus far with some indications of program weaknesses Inspection resource comments Operations and engineering resident inspection efforts will provide an overview of these

areas, with additional support from

'gI809l 50338 980904 PDR ADOCK 050003'BI7 P

PDR

0 l

~ ~

2 c~

a ~

  • operator licensing examiners during the week of'a'rch>05 and an engineering, team inspection planned for July 1996 maintenance there will be good resident inspector opportunities for maintenance observations during the current economic dispatch period; additional resources are recommended during the refueling outage Plant Support - an RP inspection is planned during the refueling outage and the timing of a post-outage RP inspection will be discussed with DRS (B. Hurray)

[Mong/Barr to develop an inspection plan to focus on maintenance activities during the outage for discussion with regional management]

[Mong to discuss with'RS the scheduling of RP inspections to maximize observations during the outage.]

CC:

J. Callan S. Collins Oversight Panel Nembers-J.

Dyer K. Perkins K. Brockman W.

Bateman J. Clifford H.

Wong,'.'arr B. Henderson H.

Hammond C. Hackney D. Kunihiro