Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17285A918 + (10:51:01, 8 January 2025)
- ML17285A916 + (10:51:02, 8 January 2025)
- GO2-89-227, Responds to NRC Re Violations Noted in Insp Rept 50-397/89-24.Corrective Actions:During 891206 Emergency Drill,Changes Implemented to Address Issue of Announcements to Personnel & Root Causes Analysis Performed + (10:51:06, 8 January 2025)
- IR 05000397/1989036 + (10:51:08, 8 January 2025)
- ML17285A910 + (10:51:09, 8 January 2025)
- ML17285A909 + (10:51:10, 8 January 2025)
- ML17285A907 + (10:51:11, 8 January 2025)
- ML17285A904 + (10:51:12, 8 January 2025)
- ML17285A905 + (10:51:12, 8 January 2025)
- GO2-89-218, Responds to Questions Raised at 891120 Enforcement Conference Re Timeliness of Util Limitorque Walkdowns & Lack of Cement in Com Ed Testing of Okonite Splices,Per Insp Rept 50-397/89-28 + (10:51:13, 8 January 2025)
- GO2-89-223, Advises That Util Commenced plant-specific Effort to Develop Improved Tech Spec Program,Utilizing Stds Developed by BWR Owners Group,In Response to NRC Interim Policy Statement on Tech Spec Improvements (NEDC-31681) + (10:51:17, 8 January 2025)
- IR 05000397/1989032 + (10:51:19, 8 January 2025)
- ML17285A895 + (10:51:20, 8 January 2025)
- IR 05000397/1989024 + (10:51:24, 8 January 2025)
- ML17285A893 + (10:51:26, 8 January 2025)
- GO2-89-224, Responds to Generic Ltr 89-15, Emergency Response Data Sys. Util Volunteers to Participate in Planning & Scheduling for Implementation of Sys Link to Plant + (10:51:27, 8 January 2025)
- ML17285A891 + (10:51:27, 8 January 2025)
- GO2-89-225, Provides Addl Info Re Low Pressure Turbine Changeout/Insp Schedule,Including Critical Crack Size as Calculated by Westinghouse + (10:51:29, 8 January 2025)
- 05000397/LER-1989-010, :on 890501,power Lost to Reactor Protection Sys 120-volt Instrument Bus a Twice,Causing ESF Actuations. Caused by Metal Nameplate Falling Into Power Supply Circuitry.Nameplates Removed from Panels + (10:51:31, 8 January 2025)
- GO2-89-217, Forwards Rev 0 to 89162-TR001, Commercial Grade Dedication Project, in Response to NRC Request for Addl Info Re Spare Parts Commercial Dedication Program Resulting from 891120 Mgt Meeting on Insp Rept 50-397/89-21 + (10:51:32, 8 January 2025)
- ML17285A887 + (10:51:32, 8 January 2025)
- TAC:74333 + (10:51:40, 8 January 2025)
- ML17285A884 + (10:51:41, 8 January 2025)
- ML17285A883 + (10:51:41, 8 January 2025)
- ML17285A881 + (10:51:42, 8 January 2025)
- ML17285A880 + (10:51:43, 8 January 2025)
- GO2-89-215, Forwards Response to Generic Ltr 89-21, Request for Info Re Status of Implementation of USI Requirements + (10:51:44, 8 January 2025)
- ML17285A878 + (10:51:44, 8 January 2025)
- ML17285A876 + (10:51:46, 8 January 2025)
- ML17285A874 + (10:51:46, 8 January 2025)
- GO2-89-214, Application for Amend to License NPF-21,amending Tech Spec 4.3.6-1, Source Range Monitor/Intermediate Range Monitor (Srm/Irm) Detector Not-Full-In Functional Test Such That Required Weekly Channel Test Surveillance Met as Stated + (10:51:47, 8 January 2025)
- 05000397/LER-1989-042, :on 891106,pressure Switch,Which Provides Input to Logic Calibr,Outside Tech Spec Limits.Caused by Inadequate Procedures W/Ambiguous Instructions.Surveillance Procedures Revised + (10:51:49, 8 January 2025)
- 05000397/LER-1989-041, :on 891103,determined That Motor for Valve Operator Associated W/Rhr Sys Valve Does Not Provide Sufficient Starting Torque at Degraded Voltage Conditions. Cause Indeterminate + (10:51:51, 8 January 2025)
- ML17285A868 + (10:51:52, 8 January 2025)
- TAC:72828 + (10:51:52, 8 January 2025)
- GO2-89-219, Provides Guarantee of Payment of Deferred Premiums Per 10CFR140.21.Util Obtains Revenue from Unit 2 by Selling Capability of Plant to Bpa.Opinion of BPA Re Obligation to Pay Satisfies Requirements of 10CFR140.21(f) + (10:51:53, 8 January 2025)
- ML17285A866 + (10:51:53, 8 January 2025)
- GO2-89-216, Discusses 891109 Telcon Re Unreviewed Safety Question Re Standby Gas Treatment Sys.Engineering Analyses Ongoing to Determine Suitable Modeling Techniques & Assumptions That Will Be Used to Establish Revised Design Basis + (10:51:55, 8 January 2025)
- ML17285A863 + (10:51:56, 8 January 2025)
- IR 05000397/1989027 + (10:51:59, 8 January 2025)
- ML17285A858 + (10:52:00, 8 January 2025)
- GO2-89-210, Informs of Util Intent to Defer Spring 1990 Low Pressure Turbine Changeout/Insp Schedule.Start of 1991 Outage Planned for 910415,representing Operation for 55.8% of Time to Reach One Half of Critical Flaw Size + (10:52:01, 8 January 2025)
- ML17285A855 + (10:52:03, 8 January 2025)
- ML17285A853 + (10:52:03, 8 January 2025)
- ML17285A851 + (10:52:04, 8 January 2025)
- GO2-89-207, Confirms That Listed Info Provided to NRC Resident Inspector on 891109 Re Fire Protection Insp,Per RP Zimmerman + (10:52:05, 8 January 2025)
- ML17285A849 + (10:52:06, 8 January 2025)
- GO2-89-206, Responds to NRC Re Violations Noted in Insp Rept 50-397/89-28.Corrective Actions:Current Commercial Grade Procurement Practices Upgraded to Meet NCIG-07 Stds Ahead of 900101 Target Schedule + (10:52:07, 8 January 2025)
- ML17285A848 + (10:52:07, 8 January 2025)
- GO2-89-205, Responds to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Safety Sys Functional Insp Including Elements of Action IV Will Not Be Completed Until Dec 1990 + (10:52:09, 8 January 2025)
- GO2-89-132, Forwards Scenario Packet for 1989 Exercise for Review & Approval.Hardware & Software Mod Necessary for Appropriate Level of Effectiveness.W/O Encl + (10:52:10, 8 January 2025)
- ML17285A844 + (10:52:12, 8 January 2025)