7590-01 WASHINGTON PUBLIC POWER SUPPLY-SYSTEM WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY.OPERATING-LICENSE NPF-21 DOCKET NO. 50-397 The United States Nuclear Regulatory Commission (the Commission) has granted the request of the Washington Public Power Supply System (the licensee) to withdraw its March 24, 1989 application to amend the WNP-2 Operating License.

The proposed amendment would have revised the License to defer to the end of the fifth refueling outage the implementation of the requirements of Regulatory Guide 1.97, Revision 2 for flux monitoring to "prior to startup following the fifth refueling outage" (Spring 1990).

The Commission issued a Notice of Consideration of Issuance of Amendment in the Federal

~Re ister on April 19, 1989 (54 FR 1580) as corrected in the

~FIR My!6. 989494FR2 429.

9 1<<8 6

1,298l the licensee stated that the March 24, 1989 application for amendment was not needed.

Consequently, the licensee requested that the March 24, 1989 application for amendment be withdrawn.

OS0003>>

3g2 e<ii204

POP, AQOCK pDc P

For further details with respect to this action, see (1) the application for amendment dated March 24, 1989 and (2) the licensee's letter of June 15, 1989 requesting withdrawal of the application.

Both of the above documents are available for public inspection at the Commission's Public Document

Room, 2120 L Street, N.W., Washington, D.C. and at the Richland City Library, Swift and Northgate Streets, Richland, Washington 99352.

Dated at Rockville, Maryland, this 4th day of December, 1989.

FOR THE NUCLEAR REGULATORY COMMISSION Robert B. Samworth, Project Manager Project Directorate V