Forwards Insp Rept 50-397/89-31 on 891002-1112 & Notice of Deviation
ML17285A916
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/19/1989
From: Richards S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17285A917 List:
References
NUDOCS 9001040051
Download: ML17285A916 (4)


See also: IR 05000397/1989031

Text

ACCELERATED DIS'GUBUTION DEMONS'HWTION SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

o

/

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

1

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vio ation

esponse

NOTES:

SSION NBR:9001040051

.

DOC.DATE: 89/12/19

NOTARIZED: NO

DOCKET

IL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe

05000397

UTH.NAME

AUTHOR AFFILIATION

RICHARDS,S.A.

Region 5, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

SORENSEN,G.C.

Washington Public Power Supply System

SUBJECT:

Forwards Insp Rept 50-397/89-31

on 891002-1112

6 notice

of'eviation.

RECIPIENT

ID CODE/NAME

PD5.PD

INTERNAL: ACRS

AEOD/DEIIB

DEDRO

NRR/DLPQ/LPEB10

NRR/DREP/PEPB9D

NRR/DRIS/DIR

NRR/PMAS/ILRB12

OE

IEBERMAN J

.RE~ALE

RGN5

FILE

0 1

RNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1.

1

1

1

-

1

1

1

1

1

1

1

1

1

1

1""

1

. 1

RECIPIENT

ID CODE/NAME

SAMWORTH,R

AEOD

AEOD/TPAD

NRR SHANKMAN,S

NRR/DOEA DIR 11

NRR/DREP/PRPBll

NRR/DST/DIR 8E2

NUDOCS-ABSTRACT

OGC/HDS2

RES MORISSEAU,D

NRC PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

2

1

1

1

1

1

1

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE DOCUMENT CONTROL DESK, .

ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION

LISTS FOR DOCUMENTS YOU DON'T NEEDl

AL NUMBER OF COPIES

REQUIRED:

LTTR

26

ENCL

26

I

~l,s

(4

~

Cy

I

""

Rage

~oit~

4'++

Q

UNITED STATES

NUCLEAR REGULATORY COIVIMISSION

REGION V

1450 MARIALANE,SUITE 210

WALNUTCREEK, CALIFORNIA94596

DEC 19

1989

Docket No.

50-397

Washington Public Power Supply System

P. 0.

Box 968

Richland,

Washington

99352

Attention:

Mr. G.

C. Sorensen

Manager Regulatory

Programs

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection

conducted

by Messrs.

C. J. Bosted

and

R.

C. Sorensen of this office on October

2 - November

12,

1989 of activities

authorized

by

NRC Operating License

No. NPF-21,

and to the discussion of

"findings held by the inspectors

with Mr. C. Powers

and other members of the

Supply System's staff at the conclusion of the inspection.

Areas examined during this inspection

are described

in the enclosed

inspec-

tion report.

Within these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with

personnel

and observations

by the inspectors.

During this inspection

our inspectors

identified a significant concern

involving loose capscrews

on safety-related

motor-operated

valves.

This

concern is discussed briefly in paragraph

4.e of the enclosed

report,

and

will be addressed

more fully in special

Inspection

Report No. 89-38.

Pending

issuance of that report, you should provide appropriate

management

attention

to ensure timely correction of the observed deficiencies.

Based

on the results of this inspection, it appears

that certain of your

activities did not fully meet commitments

made to the

NRC as set forth in the

Notice of Deviation, enclosed

herewith as Appendix A.

You are requested

to provide

a response

to this Notice. as stated in Appendix

A, Notice of Deviation.

In addition to addressing

the specific issue cited in

the Notice of Deviation, you are requested

to describe

other corrective

actions you have taken

as

a result of your review of emergency lighting.

In accordance

with 10 CFR 2.790(a),

a copy of this letter, the enclosure,

and

your response will be placed in the

NRC Public Document

Room.

I

The response

requested

by this letter and the accompanying

Notice is not

subject to the clearance

procedures

of the Office of Management

and Budget as

required

by the Paperwork

Reduction Act of 1980,

PL 96-511.

900l 040051

S9l 219

PDR

ADOCK 0"000397

0

PBC

-2-

'DEC I 9 )Mg

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

OI" 'je(S7-

n~

'.

A. Ri

ards,

Chief

Reactor Projects

Branch

Enclosure:

1.

Appendix A, Notice of Deviation

2.

Inspection

Report No. 50-397/89-31

cc:

A. L. Oxsen, Assistant

Managing Director for Operations

G.

D. Bouchey, Director, Assurance

8 Licensing

C.

M. Powers,

WNP-2 Plant Manager

A. G. Hosier, Licensing Manager

G.

E. Doupe,

Esq.

N. S. Reynolds,

Debevois,

Cook, Purcell

Im Reynolds

State of Washington

bcc w/copy of enclosures

1 and 2:

Docket File

Project Inspector

Resident

Inspector

G.

Cook

B. Faulkenberry

J. Martin

A. Johnson

P. Johnson

R. Nease,

NRR

bcc w/enclosure

1 only:

M. Smith

N. Western

J. Zollicoffer

RE

V

S

en

d

12//

89

12/( /89

n

12/I

89

AJo

son

12/I

/89

SRPchards

12/6 /89

E

EST

C

PY

EST

C

PY

YES /

NO

YES /

NO

UEST

C

PY

ES /

NO

REQUES

P

EQU

S

Y

YES /

NO

YES /

NO

DR

ES

/

NO