Confirms 891109 & 15 Telcons Re Enforcement Conference & Mgt Meeting on 891120 at Region V Ofc to Discuss Environ Qualification of Electrical Tape Splices Used on Limitorque motor-operated Valves.Notice of Meeting & Agenda Encl
ML17285A853
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/16/1989
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17285A854 List:
References
NUDOCS 8911270006
Download: ML17285A853 (5)


Text

~IIIlfop P

~4 e

~in C

0 I

c O~

e

+

~O

+4*4+

Docket No. 50-397 UNITED STATES NUCLEAR REGULATORY COMMISSlON REGION V 14SO MARIALANE,SUITE 210'ALNUT CREEK, CALIFORNIA94596 gPV 1 6 1989 Washington Public Power Supply System P.O.

Box 968 Richland, Washington 99352 Attention:

Mr. G.

C. Sorensen Manager Regulatory Programs Gentlemen:

Subject:

Enforcement Conference and Management Meeting This will confirm the telephone discussions on November 9 and 15, 1989 between Mr. P. Johnson of this office and Mr. G. Sorensen of Washington Public Power Supply System concerning an enforcement conference and management meeting to be held between NRC and Supply System representatives beginning at 1:00 p.m.

on November 20, 1989 at the Region V Office.

The purpose of the enforcement conference is to discuss the environmental

.qualification of electrical tape splices used on certain Limitorque motor operated valves and containment cooling fan motors.

In addition, a

management meeting is scheduled to discuss:

(1) the WNP-2 commercial grade procurement program; (2) Limitorque operator bolt torquing issues; (3) the Supply System's response to the latest SALP report; and (4) recent Supply System findings related to turbine trip inoperability.

Enclosures 1 and 2

list the agenda-'.items to be discussed at the enforcement conference and management meeting, respectively.

Also enclosed are copies of the Notices of Significant Licensee Meeting which list the anticipated attendees.

Sincerely,

Enclosures:

Notices of Significant Licensee Meeting R. P.

immerman, Director Division of Reactor Safety and Projects cc w/enclosures:

A. L. Oxsen, Assistant Managing Director for Operations G.

D. Bouchey, Director, Assurance and Licensing J.

P. Burn, Director of Engineering C. M. Powers, WNP-2 Plant Manager State of Washington 8'r"11270006 89111'~

PDR ADCICK I.I;.000.:-:i7 I I F DC:

GION V

HWong PJ 11/j5T89 11/j /

ES C

PY EQU ST C

PY YES /

NO YES /

NO GCooP~

AChaffee 11//S/89 11/

/89 EST C

PY REQUES C

PY YES NO YES /

NO S

TO PDR YES.

NO

REGION V

HWong 11/IN,/89 PJo n

11/4 /89 s~ w~

GCook

~g'(

RZimmerman 11/

/89 11/

/89 REQUEST C

PY YES NO VEST.COPY REQUEST COPY REQUEST COPY ES NO YES /

NO YES /

NO SEND 0

PDR YES NO

~g REgII fp

~4.

0 4

A, C

O I

c II0 Vj~n +**++

UNITED STATES NUCLEAR REGULATORY COMIVIlSSION REGION V 14SO MARIALANE,SUITE 210 WALNUTCREEK, CALIFORNIA94596 gPy 18 1SBS NOTICE OF SIGNIFICANT LICENSEE MEETING Name of licensee:

Washington Public Power Supply System Name of Facility:

WNP-2 Docket Number:

Date and Time of Meeting:

Location of Meeting:

Purpose of Meeting:

NRC Attendees:

Licensee Attendees:

50-397 November 20, 1989, 1:00 p.m.

Region V Office Walnut Creek, California Enforcement Conference Involving Environmental Oualifica-tion of Electrical Splices J.

B. Martin, Regional Administrator B. H. Faulkenberry, Deputy Regional Administrator R. P.

Zimmerman, Director, Division of Reactor Safety and Projects A. E..Chaffee, Deputy Director, Division of Reactor Safety and Projects M. B. Blume, Regional Counsel U. Potapovs, Chief, Reactor Inspection Section No. 2, Vendor Inspection Branch, NRR P.

H. Johnson, Chief, Reactor Projects Section 3

R.

C. Wilson, Senior Reactor Engineer, Vendor Inspection

Branch, NRR H. J.

Wong, Project Inspector, Reactor Projects Section 3

R. B. Samworth, Project Manager, NRR C. J. Bosted, Senior Resident Inspector, WNP-2 A. L. Oxsen, Assistant Managing Director - Operations G. D. Bouchey, Director, Licensing and Assurance J.

P. Burn, Director of Engineering C.

M. Powers, Plant Manager, WNP-2 G. C. Sorensen,

Manager, Regulatory Programs C. R. Noyes, Manager, Engineering Systems Support K. R. Wise, Supervisor of Engineering M. H. Philips, Attorney, Bishop, Cook, Purcell, Reynolds NOTE:

Attendance at this meeting by NRC personnel other than those listed above should be made known by November 17, 1989 via a telephone call to P. Johnson, FTS 463-3745.

cc (w/copy of licensee letter):

NRC Participants Listed Above D. Kirsch, RV J. Partlow, NRR G. Cook, RV B. Grimes, NRR G. Knighton, NRR J. Goldberg, OGC W. Brach, NRR J. Lieberman, OE B. Clayton, EDO

~

~

ENFORCEMENT CONFERENCE WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM WNP-2 November 20, 1989 Enclosure I AGENDA I.

Opening Remarks and Purpose of Meeting B. H. Faulkenberry, Deputy Regional Administrator, and A. L. Oxsen, Assistant Managing Director for Operations II.

Discussion of Apparent Violation Involving Environmental gualification of Taped Electrical Splices III. Response by Supply System Staff IV.

NRC Comnents and Discussion V.

Review of Enforcement Policy VI.

Closing Remarks