ML17285A848

From kanterella
Jump to navigation Jump to search
Requests Ref Matls Listed in Encl Be Provided for Requalification Program Evaluation During 900226-0309. Assignment of Simulator Operator Also Requested.W/O Encls
ML17285A848
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/16/1989
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Oxsen L
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8911210254
Download: ML17285A848 (3)


Text

November 16, 1989 Mr. Lee Oxsen Assistant Managing Director for Operations Washington Public Power Supply System 3000 George Washington Way Mail Drop 1023 Richland, Washington 99352

Dear Mr. Ozsen:

Subject:

REgUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. Gene Fisher, Supervisor, WNP-2 Requalification Training Program, and Mr. Tom Meadows, Licensing Examiner, arrangements were made for an evaluation of the requalification program and licensed personnel at the Washington Nuclear Project, Unit 2.

The evaluation visit is scheduled for the time period.of February 26, 1990 to March 9, 1990.

For this visit, the NRC examiners will administer the operating and written examinations.

The NRC examiners will discuss with the appropriate facility personnel and operators the schedule and the process for these examinations.

For the examiners to adequately prepare for this visit, it will be necessary for the facility to furnish the approved items listed in Enclosure I "Reference Material Requirements" by December 12, 1989.

Mr. Fisher has been advised of our reference material requirements and where they are to be sent.

The NRC reserves the right to postpone NRC administered requalification examinations if the facility generated materials are inadequate for examination preparation.

It is requested that an employee be provided to complete the examination team.

The employee shall be an active (per the requirements of 10 CFR 55.53(e) or (f)) SRO from the WNP-2 Operations Department.

If desired by the facility, and agreed to by the Chief Examiner, an additional employee from the Training Department may be a member of the examination team.

This employee shall preferably be an active (per the requirements of 10 CFR 55.53(e) or (f)) SRO, but may be a facility or INPO certified instructor.

These individuals must not be scheduled for an NRC administered examination during this visit, or participate as instructors once selected.

The facility representatives will be required to certify that they did not knowingly compromise any portion of the examination.

The facility representatives shall be restricted

( 1) from knowingly communicating by any means the content or scope of the examination to unauthorized persons and (2) from participating in any facility programs such as instruction, examination, or tutoring in which an identified requalification examinee(s) will be present.

These restrictions shall apply from 60 days prior to the examination date.

<9i 1 1I c)-000~9.

pDR

@DOC~~

pDC p

Nr. Lee Oxsen November 16, 1989 In addition to these two 'individuals, the assignment of a simulator operator is requested 14 days prior to the scheduled examination date.

The simulator operator will be under examination security restrictions similar to those

above, except that his/her restrictions shall apply from 14 days prior to the examination date.

The facility management is responsible for providing adequate space and accommodations to properly develop and conduct the examinations.

Enclosure 2,

"Administration of Requalification Examinations,"

describes our requirements for developing and conducting the examinations.

Nr. Fisher has also been informed of these requirements.

Also, a facility operations management representative (as a minimum, first level above shift supervisor) should observe the simulation facility examination process at the site.

Enclosure 3, contains the "NRC Rules and Guidance for Examinees" that will be in effect during the administration of the written examination.

The facility management is responsible for ensuring that all operators are aware of these rules.

The requalification examinations and the subsequent evaluation of the facility requalification program will be performed in accordance with ES-601, Revision 5.

This request is covered by Office of Management and Budget Clearance Number 3150-0101 which expires May 31, 1992.

The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and Reports Management Branch, Division of Information Support

Services, Office of Information Resources Management, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Management and Budget, Washington, D. C. 20503.

Thank you for your consideration in this matter.

If you have any questions on the evaluation

process, please contact Nr.

Tom Meadows, Chief Examiner, at (415) 943-3867, or Nr.

Lew Miller, Chief, Operations

Section, Region V, at (415) 943-3869.

Sincerely, Dennis F. Kirsch, Chief Reactor Safety Branch

Enclosures:

1.

Reference Material Requirements 2.

Administration of Requalification Examinations 3.

NRC Rules and Guidelines for Examinees

Mr. Lee Oxsen November 16, 1989 cc w/enclosures (1), (2), and (3):

R. Cross, RV (2 copies)

G. Fisher, WNP-2 cc w/o enclosures (1), (2), and (3):

Project Manager, NRR K. Perkins, LOLB D. Kirsch, RV T. Meadows, RV B. Moffitt, PNL L. Miller, RV R.

Zimmerman, RV A. Chaffee, RV P. Johnson RV J. Martin, RV R. Faulkenberry C. Bosted, SRI RV/jk R

U ST C

PY fgQU S

C P

U S

C P

YE

/

NO Y

/

NO

/Y

/

NO

]

T PDR E

/

NO MEADOWS >~

11//~/89 LMILLER 11//i+/89 KIRSCH 11//f/89