Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17290A688 + (10:09:38, 8 January 2025)
- ML17290A690 + (10:09:38, 8 January 2025)
- ML17290A686 + (10:09:39, 8 January 2025)
- GO2-93-251, Forwards Rev 1 to Evaluation of Sources of Radioactive Matl Found in Cooling Tower Sediments at Washington Nuclear Plant 2 + (10:09:40, 8 January 2025)
- GO2-93-248, Notifies That Jg Rueckert Operator License Number 55-50411 Will No Longer Be Maintaining an Operator License + (10:09:41, 8 January 2025)
- GO2-93-246, Monthly Operating Rept for Sept 1993 for WNP-2 + (10:09:42, 8 January 2025)
- GO2-93-244, Application for Amend to License NPF-21,requesting TS to Reflect Revised Design Calculations for LOP Emergency Bus Undervoltage Loss of Voltage & Degraded Voltage Trips,Time Delay Setpoints & Allowable Values + (10:09:44, 8 January 2025)
- ML17290A680 + (10:09:44, 8 January 2025)
- ML17290A676 + (10:09:46, 8 January 2025)
- GO2-93-245, Forwards Proprietary Rev 1 to GE-NE-523-94-0793, Structural Evaluation of Effects of Adjustable Speed Drive on WNP-2 Main Recirculation Pump & Motor. Affidavit for Withholding Encl.Rept Withheld,Per 10CFR2.790 + (10:09:47, 8 January 2025)
- TAC:M87832 + (10:09:48, 8 January 2025)
- ML17290A672 + (10:09:49, 8 January 2025)
- ML17290A671 + (10:09:50, 8 January 2025)
- GO2-93-223, Notifies That Util Will Not Be Submitting Comments from Retake of Written Portion of Initial Operator License Exam Administered on 930826 to I Sumsion & G Westergard + (10:09:51, 8 January 2025)
- ML17290A669 + (10:09:51, 8 January 2025)
- IR 05000397/1993025 + (10:09:53, 8 January 2025)
- IR 05000397/1993033 + (10:09:57, 8 January 2025)
- ML17290A664 + (10:09:58, 8 January 2025)
- ML17290A662 + (10:09:59, 8 January 2025)
- ML17290A661 + (10:10:00, 8 January 2025)
- IR 05000397/1993015 + (10:10:01, 8 January 2025)
- ML17290A658 + (10:10:03, 8 January 2025)
- GO2-93-241, Submits Followup Request for Discretionary Enforcement to Allow for Continued Plant Operation W/Isolation Sys Response Time SRs of TS Table 3.3.2-3 Not Having Been Demonstrated for Specific Primary & Secondary Ci Valves + (10:10:04, 8 January 2025)
- ML17290A656 + (10:10:05, 8 January 2025)
- ML17290A655 + (10:10:06, 8 January 2025)
- GO2-93-242, Application for Amend to License NPF-21,requesting Tech Spec 3/4.3.2 Re Isolation Actuation Instrumentation Response Time Testing Under Emergency Circumstances + (10:10:07, 8 January 2025)
- ML17290A652 + (10:10:09, 8 January 2025)
- TAC:M84553 + (10:10:09, 8 January 2025)
- ML17290A648 + (10:10:10, 8 January 2025)
- GO2-93-240, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-24.C/As:personnel Will Review & Incorporate Technical Changes to Vol 9 Procedures & Shift Engineers Will Perform an Independent Technical Review of Procedures + (10:10:11, 8 January 2025)
- GO2-93-238, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-19.Corrective Actions:Improvement of Plant Procedure PPM 1.3.18, Foreign Matl Control Around Spent Fuel Pool,Reactor Cavity & Dryer Separator Pit + (10:10:12, 8 January 2025)
- ML17290A634 + (10:10:14, 8 January 2025)
- IR 05000397/1993029 + (10:10:19, 8 January 2025)
- ML17290A631 + (10:10:20, 8 January 2025)
- ML17290A630 + (10:10:21, 8 January 2025)
- IR 05000397/1993024 + (10:10:37, 8 January 2025)
- ML17290A627 + (10:10:38, 8 January 2025)
- ML17290A625 + (10:10:39, 8 January 2025)
- ML17290A624 + (10:10:40, 8 January 2025)
- ML17290A622 + (10:10:41, 8 January 2025)
- IR 05000397/1993032 + (10:10:42, 8 January 2025)
- ML17290A619 + (10:10:43, 8 January 2025)
- IR 05000397/1993030 + (10:10:46, 8 January 2025)
- ML17290A616 + (10:10:47, 8 January 2025)
- ML17290A615 + (10:10:48, 8 January 2025)
- GO2-93-237, Forwards Rev 17 to WPPSS-QA-004, Operational QA Program Description. Requests Withdrawal of Request for Approval of Rev 16 + (10:10:49, 8 January 2025)
- GO2-93-236, Responds to RAI for GL 92-01,Rev 1, Reactor Vessel Structural Integrity + (10:10:51, 8 January 2025)
- ML17290A610 + (10:10:52, 8 January 2025)
- ML17290A608 + (10:10:53, 8 January 2025)
- GO2-93-232, Responds to NRC Re Violations Noted in Insp Rept 50-397/93-25.Corrective Actions:Changed Plant Mod PPM 1.4.1 & Issued Memo to Identify New Scheduled Maint Sys Checklist + (10:10:54, 8 January 2025)
- ML17290A607 + (10:10:54, 8 January 2025)