ML17290A669
| ML17290A669 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 09/20/1993 |
| From: | Miller L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Parrish J WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML17290A670 | List: |
| References | |
| NUDOCS 9310140041 | |
| Download: ML17290A669 (8) | |
Text
)4 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Po ACCESSION NBR:9310140041 DOC.DATE: 93/09/20 NOTARIZED: NO
~
~
~
DOCKET ACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION MILLER,L.F.
Region 5 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION PARRISH, J.V.
Washington Public Power Supply System
SUBJECT:
Forwards exam rept 50-397/OL-93-02 on 930826.0ne SRO 6 one RO met min qualification requirements
& were issued licenses.
DISTRIBUTION CODE:
IE42D COPIES RECEIVED:LTR /
ENCL
(
SIZE: 3+
TITLE: Operator Licensing Examination Reports NOTES:
RECIPIENT ID CODE/NAME PDV PD INTERNAL: ACRS NRR/DRCH/HOLB10 RGN5 FILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 2
2 1'
1 1
1 1
RECIPIENT ID CODE/NAME CLIFFORD,J NRR DRCH/HHFBPT G
02 NSIC COPIES LTTR ENCL 1
1 1
0 1
1 1
1 U
NOTE TO ALL RIDS RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED LTTR 10 ENCL 9
I f
gag AEONS,Np0 Cy 0O c <
Vl f
0 Cy Cy
+a*++
UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION V 1450 MARIALANE WALNUTCREEK, CAUFORNIA94596-5368 Docket No. 50-397 Washington Public Power Supply System P. 0.
Box 968 3000 George Washington Way
- Richland, Washington 99352 Attention:
Mr. J.
V. Parrish Assistant Managing Director, Operations
SUBJECT:
INITIALWRITTEN RETAKE EXAMINATIONS (EXAM REPORT No. 50-397/OL 02)
On August 26, 1993 the NRC administered initial operator licensing written retake examinations to employees of your company who had applied for licenses to operate your Washington Nuclear Project No.
2 (WNP-2).
As a result of these examinations, one SRO applicant and one RO applicant met the minimum qualification requirements for licensing and were issued licenses.
After the examinations were administered on August 26,
- 1993, a post examination review and exit meeting were held with members of your staff as detailed in the enclosed Examination Report, 50-397/OL-93-02 (Enclosure 1).
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document.
Room.
If you have questions or comments concerning this examination, please contact Hr.
P. Horrill of my staff at (510) 975-0293.
L. F. Millei Jr., Chief Reactor Safety Branch
Enclosures:
l.
Examination Report 50-397/OL-93-02 2.
Master Examinations and Answer Keys (SRO/RO) 3.
Facility Comments
.. 130003 9310140041 930920 PDR ADQCK 05000397 PDR
SEP 2
0
)993 cc w/o enclosures (1) and (2):
Hr. J. Swailes, WNP-2 Plant Manager G.
E.
C. Doupe, Esq WPPSS Hr. Warren A. Bishop,
- Chairman, Energy Facility Site Evaluation Council Hr. Alan G. Hosier, Licensing Hanager, WPPSS Mr. James C. Gearhart, Director, gualIty Assurance, WPPSS
- Chairman, Benton County Board of Commissioners H. H. Philips, Esq.,
Winston 5 Strawn cc w/enclosures (1) and (2):
Hr. J.
D. Cantrell, WNP-2 Acting Manager, Nuclear Training
I 0
V II
bcc w/enclosures (I) and (2):
T. Meadows, RV R. Cross, RV bcc w/o enclosures:
B. Faulkenberry, RV L. Hiller, RV P. Johnson, RV K. Perkins, RV S. Richards, RV R. Barr, Senior Resident Inspector P. Horrill, RV D. Lange, NRR/HOLB T. Hendiola, NRR/HOLB J. Clifford, Project Manager, NRR/PDV F. Jaggar, INEL C. Tyner, INEL SEP Z
0 i993 CONCURRENCES:
TMEADOWS~~
P'3 PJOHNSON 9
"io 93 PNORRILL6~
LNILLER@++
'7 /o 93
%93 REQUEST COPY YES ~NO Ej RE(VEST COPY YES CI NO RE(VEST COPY YES ~NO C3 RE(VEST COPY YES 0 NO SEND TO DCS YES NO 0 SEND TO PDR YES 35 NO CI
,