FORD 1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:9309290040
DOC.DATE: 93/09/02
NOTARIZED:
NO
CIL:50-397
WPPSS Nuclear Project, Unit 2, Washington Public
Powe
UTH.NAME
AUTHOR AFFILIATION
REESE,J.H.
Region
5 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
PARRISH,J.V.
Washington Public Power Supply System
DOCKET
05000397
RECIPIENT
ID CODE/NAME
PDV LA
CLIFFORD,J
COPIES
LTTR ENCL
1
0
1
1
RECIPIENT
ID CODE/NAME
PDV PD
COPIES
LTTR ENCL
1
1
SUBJECT:
Forwards
insp rept 50-397/93-30
on 930802-13.No violations
or deviations
noted.
DZSTRZBDTION CODE:
ZEOSD
COPIES
RECEIVED:LTR
I
ENCL 3
SIZE:
TITLE: Environ
& Radiological
(50 DKT)-Insp Rept/Notice of Violation
NOTES:
D
Respons
S/
F
INTERNAL: ACRS,
AEOD/TTC
NRR/DREP/PRPB10
NRR/PMAS/ILRB12
0 ~D
EG
02
RGN5
DRSS/RPB,
RGN4/FIPS
TERNAL:
EG6rG SIMPSON,F
2
2
1
1
2
2
1
1
1
1
1
1
1
1
1
1
2
'2
1
1
AEOD/DSP
NMSS/SGTB
4E4
NRR/DRIL/RPEB10
NUDOCS-ABSTRACT
OGC/HDS1
RGNS
FILE
01
NRC PDR
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL"RIDS" RECIPIENTS:
)'t
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOh! P!-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
23
~gg IlECy,
tp,
+0
0
Cy
A.
+~
~O
+**<<+
UNITED STATES
NUCLEAR REGULATORYCOMMISSION
REGION V
1450 MARIALANE
WALNUTCREEK. CALIFORNIA94596-5368
$ EP
0 2 rgg3
Docket 50-397
License
Washington Public Power Supply System
(MPPSS)
P.O.
Box 968
.3000 George Mashington
Way
Richland,
Mashington
99352
Attention:
Mr. J.
V. Parrish,
Assistant
Managing Director for Operations
SUBJECT:
NRC
INSPECTION
REPORT 50-397/93-30
During the period of August 2-13,
1993,
Mr. L. Carson
and Mr. N. Mamish of
this office conducted
a routine inspection of activities authorized for
Washington Nuclear Project
2 (WNP-2).
On August 13,
1993, at the conclusion
of the inspection,
Mr. Mamish and Mr. J.
Reese
discussed
the findings of the
inspection with you and other members of your staff identified in the enclosed
report.
Areas examined during this inspection
are described
in the enclosed report.
Within these
areas,
the inspection consisted of selective
examinations of
procedures
and representative
records,
interviews with personnel,
and
observations
of activities in progress.
Mithin the scope of this inspection,
no violations or deviations
were
identified.
~ ~
In accordance
with 10 CFR 2.790(a) of'he NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this inspection.
we will be glad to
discuss
them with you.
Sin erely,
s
.
ese,
C ief
lities Radiological Protection
Branch
9309290040
930902
ADOCK OS000397
8
Enclosure:
Inspection Report 50-397/93-30
cc w/enclosure:
Mr. J.
H. Swailes,
WNP-2 Plant Manager
Hr. A. G. Hosier,
WNP-2 Licensing Manager
Hr. J.
C. Gearhart,
Director, guality Assurance
Hr.
G.
E.
Doupe,
Esq.,
Hr. J.
V. Parrish,
Assistant
Hanaging Director for Operations
Hr. A. Lee Oxsen,
Deputy Managing Director
State of Washington
Hr. H. H. Philips,
Esq.
Docket File
Resident
Inspector
Project Inspector
G.
Cook
B. Faulkenberry