Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000397/1995012 + (09:33:42, 8 January 2025)
- ML17291B048 + (09:33:44, 8 January 2025)
- ML17291B046 + (09:33:45, 8 January 2025)
- ML17291B045 + (09:33:46, 8 January 2025)
- GO2-95-195, Responds to NRC Re Violations Noted in Insp Rept 50-397/95-21.Corrective Actions:Repaired Affected Radiation Barrier + (09:33:47, 8 January 2025)
- GO2-95-196, Withdraws Request of Amend to TS 3/4.6.1.4, Main Steam Isolation Valve Leakage Control Sys + (09:33:49, 8 January 2025)
- GO2-95-201, Requests Extension of Exam Interval for GL 88-01 Category C Welds After Completion of Stress Improvements Process,From within 2 Refueling Outages of Stress Improvement to within 4 Yrs After Stress Improvement + (09:33:51, 8 January 2025)
- GO2-95-200, Forwards Relief Request 2ISI-16 for Temporary non-code Repair of Standby Svc Water Piping Per GL 90-05 + (09:33:57, 8 January 2025)
- ML17291B038 + (09:34:00, 8 January 2025)
- ML17291B036 + (09:34:01, 8 January 2025)
- IR 05000397/1995019 + (09:34:02, 8 January 2025)
- ML17291B034 + (09:34:03, 8 January 2025)
- ML17291B032 + (09:34:04, 8 January 2025)
- ML17291B031 + (09:34:05, 8 January 2025)
- GO2-95-178, Forwards Response to NRC Re Violations Noted in Insp Rept 50-397/95-20 on 950604-0715.Corrective Actions: New Maint Procedure Will Be Developed to Include Necessary Precautions + (09:34:06, 8 January 2025)
- ML17291B029 + (09:34:09, 8 January 2025)
- ML17291B028 + (09:34:09, 8 January 2025)
- ML17291B026 + (09:34:11, 8 January 2025)
- ML17291B024 + (09:34:11, 8 January 2025)
- ML17291B023 + (09:34:12, 8 January 2025)
- TAC:M90064 + (09:34:13, 8 January 2025)
- ML17291B021 + (09:34:14, 8 January 2025)
- IR 05000397/1995008 + (09:34:15, 8 January 2025)
- ML17291B019 + (09:34:16, 8 January 2025)
- ML17291B018 + (09:34:17, 8 January 2025)
- GO2-95-175, Forwards WNP-2 ISI Summary Rept for Tenth Refueling Outage, Including NIS-1 Owner Data Rept for ISI & NIS-2 Owner Repts for Repairs & Replacements + (09:34:18, 8 January 2025)
- IR 05000397/1994013 + (09:34:22, 8 January 2025)
- GO2-95-174, Monthly Operating Rept for Aug 1995 for WNP-2 + (09:34:23, 8 January 2025)
- IR 05000397/1995003 + (09:34:27, 8 January 2025)
- GO2-95-169, Documents Util Understanding of Conditions Specified in NRC SER for TR WPPSS-FTS-131, Applications TR for BWR Design & Analysis, + (09:34:28, 8 January 2025)
- ML17291B010 + (09:34:35, 8 January 2025)
- TAC:M86383 + (09:34:36, 8 January 2025)
- ML17291B008 + (09:34:37, 8 January 2025)
- IR 05000397/1995006 + (09:34:42, 8 January 2025)
- GO2-95-164, Withdraws Request for Amend to TS to Clarify Instrumentation Testing Requirements + (09:34:43, 8 January 2025)
- ML17291B003 + (09:34:50, 8 January 2025)
- ML17291B001 + (09:34:52, 8 January 2025)
- ML17291A998 + (09:34:53, 8 January 2025)
- IR 05000395/1995025 + (09:34:59, 8 January 2025)
- IR 05000397/1995025 + (09:35:02, 8 January 2025)
- GO2-95-160, Provides Info to Support Amend of TS 6.9.3.2 + (09:35:08, 8 January 2025)
- GO2-95-163, Forwards Fitness for Duty Semiannual Performance Data Rept for Jan-June 1995 + (09:35:12, 8 January 2025)
- ML17291A991 + (09:35:16, 8 January 2025)
- GO2-95-152, Forwards Revised Marked Up TS Page 3/4 4-4,incorporating Sruveillance Notes in Front of Surveillances 4.4.1.2.1 & 4.4.1.2.2 for Jet Pump Operability to Clarify That Notes Applicable for Each Surveillance Per Conversations W/Nrc + (09:35:17, 8 January 2025)
- GO2-95-158, Informs of Changes to Commitments Made in Re Visual Insp & Replacement of Containment Penetration Modules + (09:35:20, 8 January 2025)
- ML17291A987 + (09:35:28, 8 January 2025)
- IR 05000397/1995021 + (09:35:32, 8 January 2025)
- ML17291A984 + (09:35:38, 8 January 2025)
- ML17291A982 + (09:35:39, 8 January 2025)
- ML17291A980 + (09:35:43, 8 January 2025)
- GO2-95-156, Special Rept:On 950712,loose Part Detection Sys Channel 4 Failed Due to Electrical Noise During Daily Check.Channel 4 Will Remain Inoperable Until Next Forced or Scheduled Outage When Primary Containment de-inerted for Other Work + (09:35:49, 8 January 2025)