ML17291B036

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-397/95-12 on 950804-19.No Violations Noted
ML17291B036
Person / Time
Site: Columbia 
Issue date: 09/21/1995
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML17291B037 List:
References
NUDOCS 9509270005
Download: ML17291B036 (7)


See also: IR 05000397/1995012

Text

~p,R 4E0( 'Ip0

~ ~i

4

+**<<+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

611 RYAN PLAZA DRIVE, SUITE 400

ARLINGTON,TEXAS 76011-8064

SEf 2t

f995

Washington Public Power Supply System

ATTN:

J.

V. Parr ish,

Vice Pres ident

Nuclear Operations

3000 George Washington

Way

P.O.

Box 968,

HD 1023

Richland,

Washington

99352

SUBJECT:

NRC

INSPECTION

REPORT 50-397/95-12

This refers to the inspection

conducted

by Hessrs.

T. 0. HcKernon,

S. HcCrory,

and

R. Lantz of this office and licensed operator

examiner contractors

on

August 4-19,

1995 at the Washington

Nuclear Project-2 facility.

The purpose

of the inspection

was to determine

whether activities authorized

by the

l,icense

were conducted

safely

and in accordance

with NRC requirements.

At the

conclusion of the inspection,

the findings were discussed

with Hr.

C.

Schwarz

and those

members of your staff identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted

of a review of the qualifications of

applicants for operator licenses

at the Washington

Nuclear Project-2 facility,

which included

an eligibility determination

and administration of

comprehensive

written examinations

and operating tests.

The results of this

inspection

are documented

on page

2, in the enclosed

report.

In accordance

with 10 CFR 2.790 of the

NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this inspection,

we will be pleased

to discuss

them with you.

Sincerely,

Docket:

50-397

License:

NPF-21

T

mas

P.

ynrv'irector

ivision of Reactor Safety

Enclosure:

NRC Inspection

Report

50-397/95-12

w/attachments

9509270005

95092i

PDR

ADQCK 05000397

8

PDR

~ t

Washington Public Power

Supply System

-2-

cc w/enclosure:

Washington Public Power Supply System

ATTN:

J.

H. Swai les.

WNP-2 Plant Manager

P.O.

Box 968.

MD 927M

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATTN:

Chief Counsel

3000 George Washington

Way

P.O.

Box 968.

HD 396

Richland.

Washington

99352-0968

Energy Facility Site Evaluation Council

ATM:

Frederick

S. Adair, Chairman

P.O.

Box 43172

Olympia, Washington

98504-3172

Washington Public Power Supply System

ATM:

D. A. Swank,

WNP-2 Licensing Manage

P.O.

Box 968 (Mail Drop PE20)

Richland,

Washington

99352-0968

Washington Public Power Supply System

ATN:

P.

R. Bemis, Director

Regulatory

and Industry Affairs

P.O.

Box 968 (Hail Drop PE20)

Richland,

Washington

99352-0968

Benton County Board of Commissioners

ATTN:

Chairman

P.O.

Box 190

Prosser.

Washington

99350-0190

Winston

& Strawn

ATTN:

H.

H. Phi lips.

Esq.

1400

L Street.

N.W.

Washington,

D.C.

20005-3502

Washington Public Power Supply System

ATTN: Bill Shaeffer

Training Manager

3000 George Washington

Way

P. 0.

Box 958.

MD 1028

Richland,

WA

99352-0958

4q

Washington Public Power

Supply System

E-Hail report to D. Sullivan (DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

bcc to DHB ( IE42)

bcc distrib. by RIV:

L. J. Callan

DRSS-F IPB

Branch Chief (DRP/E.

WCFO)

Senior Project Inspector

(DRP/E,

WCFO)

Leah Tremper

(OC/LFDCB, HS:

TMFN 9E10)

S. Richards

(NRR,

HOLB)

Resident

Inspector

HIS System

RIV File

Branch Chief (DRP/TSS)

H.

Hammond

(PAO,

WCFO)

DOCUHENT NAHE:

R:KWN512RP.TOH

To receive copy of document, Indicate In box: "C" ~ Copy without enciosures

"E" ~ Copy with enciosures "N" ~ No copy

RIV:RE:DRS:OB

E

RE:OB

RE:08

C:OB

0:DRS

TOMcKernon:c

RELantz

SLMcCror

~'

JLPellet

PGwynn

09 z /95

D:DRP

JEDyer

09/

V'95

09/5/95

0:DRS

TPGwynn

09/

/95

09/r

/95

09/

/9

09

'/

0

Washington Public Power

Supply System

-3-

E-Mail report to D. Sullivan (DJS)

E-Hail report to

NRR Event Tracking System

(IPAS)

<.bccyto.'DHB (IE4z)

bcc distrib.

by RIV:

L. J. Callan

DRSS-FIPB

Branch Chief (DRP/E,

WCFO)

Senior Project Inspector

(DRP/E.

WCFO)

Leah Tremper

(OC/LFDCB. HS:

TWFN 9E10)

S. Richards

(NRR.

HOLB)

Resident

Inspector

MIS System

RIV File

Branch Chief (DRP/TSS)

M.

Hammond

(PAO.

WCFO)

DOCUMENT NAHE:

R:NWN512RP.TOH

To receive copy of document, Indicate In box'C"a Copy without enciosures

"E" ~ Copy with enciosures

"N" ~ No copy

RIV:RE:DRS:OB

E

RE:OB

RE:08

C:OB

D:DRS

TOMcKernon:c

09 z /95

RELantz

09/5/95

09/

/9

09/r

/95

SLHcCror

-

JLPellet

PGwynn

09

/

D:DRP

D:DRS

JEDyer

'PGwynn

09/

V95

09/i /95