ML17291B001
| ML17291B001 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/23/1995 |
| From: | Clifford J NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML17291B002 | List: |
| References | |
| NUDOCS 9508310109 | |
| Download: ML17291B001 (6) | |
Text
ggR BEGAN
+4
~
Op
~
Q I
~O
~+*<<+
t t
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O.C. 20555~1 WAS GTON PUB C
POW R
SUP SYS OCK O. 50-397 NUCLEAR PROJECT NO.
MENDMENT TO FACILITY OPERATING LICENSE Amendment No.
140 License No. NPF-21 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Washington Public Power Supply System (licensee) dated September 2,
- 1992, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
C.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; Ther e is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have
'een satisfied.
2.
Accordingly, the license is amended by changes to the Technical Speci-fications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-21 is hereby amended to read as follows:
9soaszoxo9 9sosae 1
>DR noacx osooo397 P,
- PDR,
(2)
Te ical S ecificatio s and fnvi o mental rot etio Pl The Technical Specifications contained in Appendix A, as revised through Amendment No.
140 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION J
es W. Cliffor, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 23, 1995
I
TTACHMENT TO LICENSE AMENDMENT M
N MENT NO.
TO FACILITY OPERATING L ICENS 0.
NPF-21 DOCKET NO. 50-397 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised page is identified by amendment number and contains vertical lines indicating the areas of change.
gEHOVE 3/4 3-76 INSERT 3/4 3-76
I
~IONIA ENT TIIIN SOU C
G ONITORS LIMITING CONDITION FOR 0 ERATION 3.3.7.6 At least the following source range monitor channels shall be OPERABLE:
a.
In OPERATIONAL CONDITION 2*, three.
b.
In OPERATIONAL CONDIITONS 3 and 4, two.
APPLE ANILIT:
OPEIIATIONAL 4 NOITIONE I, 4, 4 4.
~CT ON:
a.
In OPERATIONAL CONDITION 2* with one of the above required source range monitor channels inoperable, restore at least 3 source range monitor channels to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
b.
In OPERATIONAL CONDITION 3 or 4 with one or more of the above required source range monitor channels inoperable, verify all insertable control rods to be inserted in the core and lock the reactor mode switch in the Shutdown position within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
SURVEILLANCE RE UIREMENTS 4.3.7.6 Each of the above required source range monitor channels shall be demonstrated OPERABLE by:
a.
Performance of a:
1.
CHANNEL CHECK at least once per:
a) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in CONDITION 2*, and b) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in CONDITION 3 or 4.
2.
CHANNEL CALIBRATION**at least once per 18 months.
b.
Performance of a CHANNEL FUNCTIONAL TEST:
1.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to moving the reactor mode switch from the Shutdown position, if not performed within the previous 7 days, and 2.
At least once per 31 days.
c.
Verifying, prior to withdrawal of control rods, that the SRM count rate is at least 0..7 cps¹ with the detector fully inserted.
- With IRM's on range 2 or below.
- Neutron detectors may be excluded from CHANNEL CALIBRATION.
¹ Provided signal-to-noise ratio is >20.
Otherwise,
>3 cps, provided signal-to-noise ratio >2.
WASHINGTON NUCLEAR UNIT 2 3/4 3-76 Amendment No. i4O