Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17292B260 + (09:16:06, 8 January 2025)
- ML17292B259 + (09:16:07, 8 January 2025)
- GO2-98-036, Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1997 Which Includes Summary of Quantities of Radioactive Liquid & Gaseous Effluents & Solid Waste Released from WNP-2 During Reporting Period.Odcm,Encl + (09:16:08, 8 January 2025)
- ML17292B258 + (09:16:08, 8 January 2025)
- ML17292B255 + (09:16:10, 8 January 2025)
- ML17292B254 + (09:16:11, 8 January 2025)
- ML17292B252 + (09:16:12, 8 January 2025)
- ML17292B251 + (09:16:13, 8 January 2025)
- GO2-98-028, Monthly Operating Rept for Jan 1998 for WNP-2 + (09:16:14, 8 January 2025)
- ML17292B248 + (09:16:14, 8 January 2025)
- GO2-98-025, Informs That DW Coleman Now Acting as Manager,Regulatory Affairs for Facility.Std Distribution for Documents Sent to Util Should Be Modified + (09:16:16, 8 January 2025)
- GO2-98-029, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-18.Corrective Actions:Five Ladders Standing in Reactor Water Cleanup Pump & Heat Exchanger Rooms Were Immediately Removed & Stored Properly + (09:16:17, 8 January 2025)
- ML17292B243 + (09:16:19, 8 January 2025)
- ML17292B242 + (09:16:20, 8 January 2025)
- ML17292B240 + (09:16:21, 8 January 2025)
- ML17292B239 + (09:16:22, 8 January 2025)
- GO2-98-018, Forwards from ABB to WPPSS Re Plant Cycle 14 Safety Limit MCPR for SVEA-96 Fuel Bases on Reference Core + (09:16:23, 8 January 2025)
- GO2-98-017, 1997 Annual Environmental Operating Rept + (09:16:24, 8 January 2025)
- GO2-98-020, Forwards Fitness for Duty Semiannual Performance Data Rept for 970701-1231 + (09:16:25, 8 January 2025)
- IR 05000397/1997019 + (09:16:28, 8 January 2025)
- GO2-98-011, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-17.Corrective Actions:Technician Visually Verified Area to Be Clear of Personnel & Immediately Locked Gate & Performed Walkdown to Verify Locked Status of Similar Areas + (09:16:29, 8 January 2025)
- GO2-98-012, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-22 on 960924-0926.CAs:Supply Sys Was Granted Notice of Enforcement Discretion Not to Enforce Compliance W/Actions in TS SR 3.3.1.1.15,3.3.6.1.7 & 3.3.5.1.7 + (09:16:30, 8 January 2025)
- GO2-98-010, Provides Info Re Intended Scope & Methodolody of Core Shroud & Insp,Per GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs + (09:16:32, 8 January 2025)
- ML17292B230 + (09:16:33, 8 January 2025)
- GO2-98-006, Informs of Unexpected Change in Feedwater Temperature & Flow Indication Used to Calculate Plant Heat Balance During Routine Trending of Plant Computer Feedwater Temperatures on 980112.Corrective Actions Reduced Reactor Power to 99% + (09:16:34, 8 January 2025)
- IR 05000397/1997016 + (09:16:36, 8 January 2025)
- ML17292B225 + (09:16:37, 8 January 2025)
- GO2-98-007, Monthly Operating Rept for Dec 1997 for WNP-2 + (09:16:39, 8 January 2025)
- ML17292B219 + (09:16:39, 8 January 2025)
- GO2-98-005, Washington Public Power Supply Sys Annual Rept for 1997 + (09:16:41, 8 January 2025)
- GO2-98-001, Submits Commitments Made in Response to NUREG-0619,re BWR Feedwater Nozzle & CR Drive Return Line Nozzle Cracking. WNP-2 Feedwater Nozzle Insp Rept for R-12 Maintenance & Refueling Outage Attached + (09:16:43, 8 January 2025)
- GO2-98-003, Informs That Testing of Whittaker fire-rated Cables Will Take Place During Week of 980302,at Stated Facility + (09:16:44, 8 January 2025)
- GO2-98-002, Forwards 90-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps + (09:16:46, 8 January 2025)
- GO2-97-229, Confirms That Response to 971202 RAI Re Plant Response GL 88-20,Suppl 4, IPEEE, Will Be Submitted on or Before 980330 + (09:16:47, 8 January 2025)
- TAC:M68626 + (09:16:48, 8 January 2025)
- GO2-97-228, Provides Amended Response to Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Portions of RCIC Sys Required to Support Reactor Vessel Inventory Makeup Will Be Reclassified as safety-related & Seismic Category I + (09:16:49, 8 January 2025)
- GO2-97-227, Forwards Hardware or Software Changes Which Affect Transmitted Data Points Identified in ERDS Data Point Library,Per 10CFR50 App E,Section VI.3a + (09:16:50, 8 January 2025)
- ML17292B148 + (09:16:52, 8 January 2025)
- ML17292B146 + (09:16:53, 8 January 2025)
- ML17292B144 + (09:16:54, 8 January 2025)
- GO2-97-222, Ack Receipt of 971203 Transmittal of Insp Rept 50-397/96-22. Response to Subject Insp Rept Will Be Submitted on or Before 980121,as Discussed in Telcon + (09:16:55, 8 January 2025)
- GO2-97-223, Provides Info in Compliance w/10CFR140.21,which Requires Annual Filing of Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each Licensed Reactor + (09:16:56, 8 January 2025)
- ML17292B141 + (09:16:57, 8 January 2025)
- GO2-97-217, Forwards Rev 27 to Operational QA Program Description (OQAPD) (WPPSS-QA-004), to Reflect Organizational Change of Relocating Supplier Quality & Receiving Insp Functions from Procurement Dept to Quality Dept + (09:16:58, 8 January 2025)
- ML17292B138 + (09:17:00, 8 January 2025)
- GO2-97-220, Monthly Operating Rept for Nov 1997 for WNP-2 + (09:17:01, 8 January 2025)
- ML17292B135 + (09:17:01, 8 January 2025)
- GO2-97-218, Forwards Addl Info Requested by NRC Re Util 961015 Request for Amend to Secondary Containment & SGTS TS, in Accordance W/Schedule Provided in Util + (09:17:03, 8 January 2025)
- ML17292B132 + (09:17:04, 8 January 2025)
- GO2-97-219, Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage + (09:17:05, 8 January 2025)
- IR 05000397/1997017 + (09:17:10, 8 January 2025)