UNITED STATES NUCLEAR REGULATORY COMMlSSlON WASHINGTON> D.C. 20555-0001 December 10, i997
~ gh 3'9g LICENSEE:
Washington Public Power Supply System (WPPSS)
FACILITY:
Washington Nuclear Project No.
2 (WNP-2)
SUBJECT:
MEETING
SUMMARY
On October 14.
1997.
Washington Public Power Supply System (WPPSS or the licensee) representatives met with members of the NRC staff to discuss the licensee's planned WNP-2 on-site spent fuel dry cask storage program.
Also in attendance as observers were representatives from Westinghouse, Holtec International.
and NAC International.
The licensee provided the staff with a discussion ot the scope and progress of the WNP-2 dry cask storage initiative.
Details of the vendor licensing rogress and WNP-2 vendor selection effort were presented to the statf.
The icensee acknowledged that the vendor licensing progress was unlikely to support an early year 2000 cask loading.
The licensee indicated that they wou)d lose full core off-load capability in February 2000 with the delivery of new fuel and would lose the inability to discharge the reloaded fuel after the June 2005 refueling without dry cask storage capability.
The licensee's current plans are to complete the independent spent fuel storage installation
( ISFSI) design by January 1,
1999.
The ISFSI construction would be completed by June 30.
1999, delivery by July 1, 2000, and initial loading by December 1,
2000.
The licensee indicated it planned to select a vendor in December 1997.
The licensee also provided a discussion of contingency options, including additional spent fuel racks, should the licensee's schedule slip.
The staff summarized its position with respect to its review of industry submittals and reminded the licensee that vendor selection was a critical phase of the program.
The staff thanked the licensee for sharing its status with the NRC and the meeting then adjourned.
~~illC FlItE gp)~ ~>r 97i2i702i3 97i2iO PDR aoaex.
OSOOOm7 PDR IIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII J~
A copy of the licensee's slides is attached.
Also attached is a list of
'ttendees.
ORIGINAL SIGNED BY Chester
- Poslusny, Senior Project, Manager, Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
~
Docket No. 50-397 Attachments:
1.
Heeting Slides 2.
Attendance List cc w/atts:
See next page DISTRIBUTION:
(w/atts.
1 and 2),
Docket File ACRS PUBLIC'GC PDIV-2 Reading
,CPoslusny
- PGwynn, RIV DISTRIBUTION:
(w/atts.
1)
'Collins (SJC1)
FMiraglia (FJM)
RZimmerman (RPZ)
EAdensam (EGA1)
WBateman (WHB)
EPeyton (ESP)
SWhaley (SAW2)
ELeeds (EJL)
THcGinty (TJH1)
FSturz (FCS)
KGruss (KAG1)
SShankman (SFS)
DOCUMENT NAME:
WNP1014. HTS OFC NAME DATE PDIV-2/P CPoslusn 12/I > /97 PD IV-2/LA EPey n
12/jo/97
4,i Kl E
I A copy of the licensee's slides is attached.
Also attached is a list of attendees.
Docket No. 50-397 Attachments:
1.
Meeting Slides 2.
Attendance List cc w/atts:
See next page Cjkkn 48~
Chester
- Poslusny, enior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
cc w/atts:
Mr. Greg 0. Smith (Mail Drop 927M)
WNP-2 Plant General Manager Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352-0968 Mr. Albert E. Houncer (Hail Drop 1396)
Chief Counsel Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352-0968 Mr. Frederick S. Adair, Chairman Energy Facility Site Evaluation Council P. 0.
Box 43172 Olympia, Washington 98504-3172 Mr. David A. Swank (Mail Drop PE20)
- Hanager, Regulatory Affairs Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352-0968 Mr. Paul Inserra (Hail Drop PE20)
- Manager, Licensing Washington Public Power Supply System P.O.
Box 968
- Richland, Washington 99352 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Harris Tower 8 Pavilion 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO Washington Public Power Supply System P. 0.
Box 968
- Richland, Washington 99352 Mr. J.
V. Parrish Chief Executive Officer Washington Public Power Supply System P.O.
Box 968 (Mail Drop 1023)
- Richland, Washington 99352-0968 Chairman Benton County Board of Commissioners P.O.
Box 69
- Prosser, Washington 99350-0190 Mr. Scott Boynton, Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O.
Box 69
- Richland, Washington 99352-0968 Mr. Perry D. Robinson, Esq.
Winston 8 Strawn 1400 L Street.
N.W.
Washington, DC 20005-3502
Attachment 1
WASHINGTON PUBLIC POWER SUPPLY SYSTEM DRY CASK STORAGE PROGRAM
'October 14, 1997 HANDOUTMATERIALUSED AT THE MEETING
n-ate pent ue torageP ans or ry as P-2 Nuclear Regulatory Commission October 14, 1997 Presented by DLLarkin U%pent/nrc/nrc1097.ppt 10/14/97
itiona n-ite ue torage
": Current Spent Fuel Status:
Total rack locations = 2,654 Fuel in storage = 1,564 spent+ 24 new =1,588
": Loss ofFull Core Discharge Capability:
February 2000 with delivery ofnew fuel.
"; Inabilityto Discharge Reload:
June 2005 after refueling outage.
U:/spent/nrc/nrc1097.ppt 10/14/97
1tlOEla tl-lte ue tora e
3000 LOSS OF CORE DISCHARGE CAPABILITY EII 2500
~~
ED 2000 5 1500
~ 1000 a
5QQ 0
.:. 4.. h%,...(k:
.W,:.,gN~
~ASSM
FCD CAPACITY 'ikey Pool Capacity
~ x::S'>"
1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 U%pent/nrc/nrc1 097.ppt 10/14/97
or Licensing Progress Part 71-SAR RAI¹1 - Resp RAI¹2 - Resp Holtec HI-STORM 6/95 7/96 - 10/96 8/97-NAC UMS 4/97 SNC TRANSTOR 12/95 6/96 - 8/96 3/97 - 6/97 VECTRA TS/61 (7/98)
West.
Wesfflex (12/97)
Part 72 - SAR RAI¹1 - Resp RAI¹2 - Resp 10/95 8/97 6/96 12/96 - 3/97 (7/98)
(11/97)
CofC (10/99) 52 months (10/99) 30 months (7/98) 32 months (4/00) 33 months (6/99) 20 months U%pent/nrc/nrc1097.ppt 10/14/97
\\
V
o Fu oreaisc arge
": Vendor licensing progress unlikely to support early 2000 cask loading.
": Management decision to accept risk:
No regulatory requirements to maintain FCD capability at WNP-2.
No safety issues identified.
Commercial risk is acceptable for one year.
": Contingency planning for further delays.
U:/spent/nrc/nrc1097.ppt 10/14/97
1 I
t ue torage roject
.: ISFSI using Dry Storage Cask system.
":Utilize General License with Certified Casks - certification is critical path.
+~+
Expandable to 5,700 fuel assemblies.
": Preferred site within exclusion area but outside current protected area.
U%pent/nrc/nrc1097.ppt 10/14/97
k TI
": 1/1/99 - Complete ISFSI design.
": 6/30/99 - Complete ISFSI construction.
Allows cask loading in 1999 ifcertification is available to support cask fabrication.
+~+
": 12/1/00 - Initiate cask loading.
U%pent/nrc/nrc1097.ppt 10/14/97
, pP~~
"-::-:::-'":,=:=:,e': lative Project c e ue 1998 1999 2000 Task Name STORAGE CASK PROCUREMENT ISFSI OESIGN ISFSI CONSTRUCTION LICENSING Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 10CFR72.212 Review ofCompthnce 10CFR50.59 Review 10CR50 License Amendment Rev1ew/modify QA program Site Catttlcate Amendment Request EFSEC Approval General Ucense Notice to NRC Register use of Cask Design with NRC Gas WCanlster Fabrication ISFSI Procedures Facility Operation TraInIng
~rational Testing ISFSI Operational Cask Loading Operation Fug Core Off-Load restored U:/spent/nrc/nrcl097.ppt 10/14/97
ustry articipation
": Visits made to five ISFSIs - Oconee, Surry, Calvert Cliffs, Point Beach, and Prairie Island. Visits to Trojan.
": Participation in NEI spent fuel initiatives:
NEI Dry Cask Task Force member.
Attended NSP, Surry and Point Beach Workshops.
": Attended four owner group meetings.
U:/spent/nrc/nrc1097.ppt 9
10/14/97
enti le SSueS
'"NRC/Utilitymeetings.
- NRC/vendor'eetings.
":NRC Inspection reports.
- NRC Information Notices, Dry Cask Storage Action Plans, etc.
Issues and Lessons Learned to be Added to Project Requirements MatrixDocument.
U%pent/nrc/nrc1097.ppt 10 10/14/97
h
-'=-'-,",:'-.",-.'-:-'=--';-0-.: munications on
'Ci ent ue
- Richland City Council members.
'" State Legislative representatives.
- " Benton and Franklin County Commissioners.
": Energy Facility Site Evaluation Council.
": Media representatives.
U%pent/nrc/nrc1097.ppt 10/14/97
tatus
- InitialProposals rejected in January, 1997.
- New RFP released on June 26, 1997.
": Proposals received September 30, 1997.
Six proposals received - Holtec, NAC, Sierra Nuclear, Transnuclear, VECTRA, k, Westinghouse.
": Vendor selection expected in December, 1997.
U:/spent/nrc/nrc1097.ppt 12 10/14/97
ingency
@lions
'" Procurement RFP sets licensing milestones:
5/1/99 forNRC approved SERs.
10/1/99 for Certificate ofCompliance.
- Remedies requested:
Physical solutions such as spent fuel racks.
$3M letter ofcredit to pursue contingency solutions.
U:/spent/nrc/nrc1097.ppt 13 10/14/97
~
1
Attachment 2
MEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM DRY CASK STORAGE PROGRAM ATTENDEES October 14, 1997 Name T. Colburn W. Bateman S.
Whaley E.
Leeds T. McGinty F. Sturz K. Gruss S.
Shankman R. Webring P.
Inser ra D. Larkin R.
Bowser G. Tsersland K. Kunert Af filiati on NRC/NRR/DRPW/PD42 NRC/NRR/DRPW/0:PD42 NRC/NMSS/SFPO NRC/NMSS/SFPO NRC/NMSS/SFPO NRC/NMSS/SFPO NRC/NMSS/SFPO NRC/NMSS/SFPO WPPSS/VP Operations Support WPPSS/Licensing Manager WPPSS/SF Cask Project Manager Westinghouse Holtec International NAC International