GO2-98-028, Monthly Operating Rept for Jan 1998 for WNP-2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1998 for WNP-2
ML17292B247
Person / Time
Site: Columbia 
Issue date: 01/31/1998
From: Kasko B, Galen Smith
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-98-028, GO2-98-28, NUDOCS 9802200131
Download: ML17292B247 (4)


Text

CATEGORY 1~

REGULATEY INFORMATION DISTRIBUTIOPKYSTEM (RIDS)

ACCESSION NBR:9802200131 DOC.DATE: 98/01/31 NOTARIZED: NO DOCKET ¹ FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION KASKO,B.

Washington Public Power Supply System SMITH,G.O.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Jan 1998 for WNP-2.W/980212 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR )

ENCL I

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: AC LE CE RGN COPIES LTTR ENCL 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME POSLUSNY,C AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1

1 1

1 1

1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1

1 1

1 NOAC D

0 NOTE TO ALL nRIDSn RECIPIENTS PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

WASHINGTONPUBLIC POWER SUPPLY SYSTEM PO. Box 968

~ Richlattd, Washington 99352-0968 February 12, 1998 G02-98-028 Docket No. 50-397 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLYOPERATING REPORT JANUARY 1998 Transmitted herewith is the Monthly Operating Report for the month of January 1998 as required by Technical Specification 5.6.4.

Respectfully, G. O. Smith Plant General Manager Mail Drop 927M CC; EW Merschoff - NRC RIV C Poslusny, Jr, - NRR KE Perkins, Jr. - NRC RIV, WCFO NRC Sr. Resident Inspector - 927N PD Robinson - Winston &Strawn INPO ANILibrary UtilityData Institute DL Williams - BPA / 399 9802200i3i 980i3i PDR ADQCK 05000397' PDR '

i IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

t t

OPERATING STATUS REPORT for WNP-2 Date:

February 1, 1998 2.

3.

4.

5.

Docket:

50-397 Reporting Period: JANUARY 1998 UtilityContact:

Bernice Kasko (509) 377-4473 Design Electrical Rating (Net MW,):

Maximum Dependable Capacity - summer (Net MW,):

1153 1107 6.

7.

8.

9.

Hours Reactor Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy tMwH)

MONTH 744.0 744.0 0.0 839,540 YEAR 744.0 744.0 0.0 839,540 CUMULATIVE 82,989.3 80,243.0 3,037.5 77,253,397 10.

Challenges to safety/relief valves:

None

UNITSHUTDOWNS REPORT PERIOD:

JANUARY 1998 DOCKET NO.: 50-397 UNIT NAME: WSP-2 DATE: February 1, 1998 COMPLETED BY: B Kasko TELEPHONE: (509) 377-4473 No.

Date Type F: Forced S:

Scheduled Duration (Hours)

Reason (I)

Method (2)

Cause and Corrective Action To Prevent Recurrence None

SUMMARY

At the end of the month WNP-2 was operating at 100% power.

~IREASON A-Equ>pment Failure B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training &

License Examination F - Administration G - Operational Error H - Other 2 METHOD 1 - Manua 2 - Manual Scram 3 - Auto Scram 4 - Continued 5 - Reduced Load 9 - Other