CATEGORY REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9803050072 DOC.DATE: 98/02/27 NOTARIZED: NO DOCKET I FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION MURRAY,B.
Region 4 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION PARRISH,J.V.
Washington Public Power Supply System
SUBJECT:
Ack receipt of plant procedures manual,vol 13,package 97-60, dtd 970220.Based on determination that changes did not decrease effectiveness of emergency plan NRC approval not required. Changes subj to insp to confirm effectiveness.
DISTRIBUTION CODE:
XE35D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr/Exer ise NOTES:
T Rep E
RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL FILE CENTER 0
EXTERNAL: NOAC COPIES LTTR ENCL RECIPZENT ID CODE/NAME POSLUSNY,C NRR/DRPM/PERB RGN4 FILE 01 NRC PDR COPIES LTTR ENCL D
N NOTE TO ALL "RIDS" RECIPZENTS:
PLEASE EASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF,COPXES REQUIRED:
LTTR 8
ENCL
~pg RECT (4
Vp0 UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011%064 February 27, 1998 Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968
SUBJECT:
CHANGES TO WASHINGTON NUCLEAR PROJECT SITE 2 EMERGENCY ACTION LEVELS
Dear Mr. Parrish:
This letter acknowledges receipt of plant procedures manual, Volume 13, Package No. 97-60, dated February 20, 1997, which transmitted Emergency Plan Implementing Procedure 13.1.1, "Emergency Classification," Revision 24 (emergency action levels).
Based on your determination that the changes did not decrease the effectiveness of your emergency plan and that it continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50 (verbally confirmed with Mr. T. Messersmith on February 17, 1998), NRC approval is not required.
Implementation of these changes will be subject to inspection to confirm that they have not decreased the effectiveness of your emergency plan.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.
Sincerely, 8(~~~
Blaine Murray, Chief Plant Support Branch Division of Reactor Safety Docket No.:
50-397 License No.:
NPF-21 CC:
Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 9803050072 980227 PDR ADOCK 05000397 F
PDR llllllllllllllllllllll[llll[llllllllllll
Washington Public Power Supply System Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)
WNP-'2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. David A. Swank (Mail Drop PE20)
Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Albert E. Mouncer (Mail Drop 396)
Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Perry D. Robinson, Esq.
Winston & Strawn 1400 L Street, N.W.
Washington, D.C. 20005-3502
Washington Public Power Supply System DMB (AO45)
Regional Administrator WNP-2 Resident Inspector DRS Director DRS Deputy Director DRP Director DRS-PSB Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File MIS File RIV File DRS Action Item File (97-E-0009)
DOCUMENT NAME: G:tDRSLTRSttEP.MLDiWNR24PLR.GMG TAC ¹X03381 To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV:PSB E:DRSttPSB GMGood:nh
~
BMurray 02/
98 02 8
OFFICIALRECORD COPY
Washington Public Power Supply System DMB~46}
Regional Administrator WNP-2 Resident Inspector DRS Director DRS Deputy Director DRP. Director DRS-PSB Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File MIS File RIV File DRS Action Item File (97-E-0009)
DOCUMENT NAME: G:iDRSLTRS>EP.MLD>WNR24PLR.GMG TAC ¹X03381 To receive copy of document, indicate In box: "C" = Cop without enciosures "E" = Cop with enciosures "N"= No copy RIV:PSB E
GMGood:nh 02/
98
- DRSiPSB BMurray 02 8
OFFICIAL RECORD COPY