ML17292B239

From kanterella
Jump to navigation Jump to search
Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam at Facility on 980408.GFES Will Consist of 100 Questions.Max Time Allowed to Complete exam,3 Hours & Passing Score 80%
ML17292B239
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/05/1998
From: Pellet J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9802090196
Download: ML17292B239 (7)


Text

e CATEGORY REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

SUBJECT:

Informs that NRC pains to administer generic fundamentals exam section of written operator licensing exam at facility on 980408.GFES will consist of 100 cpxestions.Max time allowed to complete exam,3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />

& passing score 80%.

DISTRIBUTION CODE:

IE42D COPIES RECEIVED:LTRj ENCL TITLE: Operator Licensing Examination Reports SIZE:

NOTES:

ACCESSION NBR:9802090196 DOC.DATE: 98/02/05 NOTARIZED: NO

'OCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION PELLET,J.L.

Region 4

(Post 820201)

RECIP.NAME RECIPIENT AFFILIATION PARRISH,J.V.

Washington Public Power Supply System RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS NRR/DRCH/HHFB RGN4 FILE 01 EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME POSLUSNY,C FILE CENTE NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 2

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL 9

~p,R Ilfgy~

Vp Op nO I

/4, IP

~O

+**y4 UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZADRIVE, SUITE 400 ARLINGTON,TEXAS 76011 8064 FE8 5 l998 Mr. J. V. Parrish (Mail Drop 1023)

Chief Executive Officer Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968

SUBJECT:

GENERIC FUNDAMENTALSSECTION OF THE WRITTEN OPERATOR LICENSING EXAMINATION

Dear Mr. Parrish:

The NRC plans to administer a Generic Fundamentals Examination Section (GFES) of the written operator licensing examination at your facilityon April 8, 1998. The GFES willconsist of 100 questions.

The maximum time allowed to complete the examination is 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> and the passing score willbe 80 percent.

In order to nominate candidates, an authorized representative from your facility must submit a letter listing the names of candidates for the examination to the appropriate NRC Regional Administrator and to the Chief, Operator Licensing Branch. The letter must be received both in the Region and at NRC Headquarters by March 6, 1998, in order to allow us to assign docket numbers to the candidates and to make preparations for shipping the examinations to you for administration.

The letter must certify that the candidates willhave completed their fundamentals training by the date of the examination and are enrolled in your training program leading to an NRC operator or senior operator license.

The letter must also list the names of personnel you willbe using to proctor the examination and the address to which the examinations should be sent. A sample registration letter is enclosed.

The address for the Operator Licensing Branch Chief is as follows:

Robert M. Gallo, Chief Operator Licensing Branch U.S. Nuclear Regulatory Commission Mail Stop OWFN 9 D25 Washington, DC 20555 9802090i96 98020S PDR ADOCK 05000397 V

PDR llllllllllllllllllllllllllllllllllllllll

Washington Public Power Supply System Approximately 2 weeks prior to the examination administration date, your designated facility contact willbe sent a letter delineating examination particulars (i.e., proctor responsibilities, student I.D. numbers, etc.)

Sincerely, Docket No.:

50-397 License No.:

NPF-21 Joh L. Pellet, Chief Operations Branch Division of Reactor Safety

Enclosure:

As stated cc w/enclosure:

BillShaeffer, Manager Nuclear Training Washington Public Power Supply System P.O. Box 968, MD-1022 Richland, WA99352-0968 Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, Washington 98504-3172 Mr. Rodney L. Webring (Mail Drop PE08)

Vice President, Operations Support/PIO Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Greg O. Smith (Mail Drop 927M)

WNP-2 Plant General Manager Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. David A. Swank (Mail Drop PE20)

Manager, Regulatory Affairs Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968

Washington Public Power Supply System Mr. Albert E. Mouncer (Mail Drop 396)

Chief Counsel Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Mr. Paul Inserra (Mail Drop PE20)

Manager, Licensing Washington Public Power Supply System P.O. Box 968 Richland, Washington 99352-0968 Perry D. Robinson, Esq.

Winston & Strawn 1400 L Street, N.W.

Washington, D.C. 20005-3502

Washington Public Power Supply System bcc to DCB (IE42) bcc distribution by RIV:

DRP Branch Chief Resident Inspector C. Poslusny, NRR (OWFN 13-D-15)

Leah Tremper, OC/DAF/LFARB (TWFN 9-E-1 0)

RIVfile L. Miller, TTC E. W. Merschoff, RA L. A. Hurley, GFES file DOCUMENT NA E: GFES1 To rec4dvo copy of do indicate lnhoc C - Copy without enctosures E - Copy withenctosutes N"- iio copy RIV:OB:LA LAHurley 02/

/98 N

C:OB JLPell

/ /98 0

/98 OFFICIALRECORD COPY

/ /98

itr inL tr

{Nam~

Regional Administrator U. S. Nuclear Regulatory Commission Region {NNi~gQ

Dear {g~,

h IMI

~WR generic fundamentals examination (GFE) section of the written operator licensing dpi d

llhhl.Allhp I

lldi h

operator licensing training program and willhave completed the generic fundamentals portion of the program by the examination date.

In h

~e t

v' ore The following personnel willhave access to the examinations before they are administered:

In the h

r ini w

ill

'v t

a The examinations should be sent to the following address:

~am ~itl

~dd gag Ifyou have any questions please contact at tele Sincerely,

~m~~titl CC:

Chief, Operator Licensing Branch