Text
CATEGORY
2
REGULATORY INFORMATZON DXSTRXBUTION SYSTEM (RIDS)
ACCESSION NBR:9802250101
DOC.DATE: 98/02/19
NOTARIZED: NO
I
~
~
~
~
FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public
Powe
AUTH.NAME
AUTHOR AFFXLIATION
GWYNN,T.P.
Region
4 (Post
820201)
REC1P.NAME
RECIPIENT AFFZLZATION
PARRISH,J.V.
Washington Public Power Supply System
SUBJECT:
Forwards insp rept 50-397/97-20
on 971221-980131
E NOV.
Violation re failure .to properly label radioactive matl
containers
&. similar,to previous events which have been
identified by personnel.
DISTRIBUTION CODE: IE01F
COPIES
RECEIVED:LTR.
ENCL
.SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
DOCKET
05000397
RECIPXENT
ID CODE/NAME
PD4-2
INTERNAL: ACRS
yrdr
ILE CENTE
NRR D
M PECB
NUDOCS-ABSTRACT
OGC/HDS3
ERNAL: LITCO BRYCE,J H
NRC PDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
POSLUSNY,C
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HHFB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
NOAC
NUDOCS FULLTEXT
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D
lLOAOeo raaM
,) NRC FLOPPY
'1
N
NOTE TO ALL "RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
19
ENCL
19
EA 98-069
UNITEO STATES
.
NUCLEAR REGULATORY COMMISSION
REGION IV
611 RYAN PLAZA DRIVE, SUITE 400
ARLINGTON,TEXAS 76011 6064
FEB
I 9
1998
Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
. SUBJECT:
NRC INSPECTION REPORT 50-397/97-20, NOTICE OF VIOLATION,AND
EXERCISE OF ENFORCEMENT DISCRETION
Dear Mr. Parrish:
An NRC inspection was conducted December 21, 1997, through January 31, 1998, at your
Washington Nuclear Project-2 reactor facility. The enclosed report presents the scope and
results of that inspection.
During the inspection period the conduct of licensed activities was characterized
by safety-
conscious operations and generally good maintenance practices.
However, one violation of
NRC requirements was identified for failure to properly label radioactive material containers and
is similar to previous events which have been identified by your personnel.
The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding this violation are described in detail in the enclosed report.
Please note that you are
required to respond to this letter and should followthe instructions specified in the enclosed
Notice when preparing your response.
The NRC will use your response,
in part, to determine
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
A violation was also identified for three examples where your staff failed to update the facility's
Final Safety Analysis Report (FSAR) when changes to the facilitywere made in accordance with
10 CFR 50.59. This violation would be classified at Severity Level IV and normally would be
cited because it was identified by the NRC. However, after consultation with the NRC's Office of
Enforcement, the NRC is exercising discretion in accordance with Section VII.B.3of the
Enforcement Policy and is not taking formal enforcement action.
Specifically, the NRC
recognizes that you have underway a comprehensive
program to review and update your FSAR.
This program was described in your letters dated February 7 and June 6, 1997, and also in NRC
Inspection Report 50-39?/97-14.
It is the NRC's view, given the scope and schedule for
completing this review, that this violation likely would have been identified through your FSAR
review program.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosures,
and your response will be placed in the NRC Public Document Room (PDR). To the
extent possible, your response should not include any personal privacy, proprietary, or
safeguards
information so that it can be placed in the PDR without redaction.
9802250iOi 980219
ADOCK 05000397
8
Ifilflllllflllfllllfflllfl
IIIIIIIIIIII
Washington Public Power Supply System
-2-
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
Thomas P. Gwynn,
irector
Division of Reactor P
e
Docket No.: 50-397
License No.: NPF-21
Enclosures:
2. NRC Inspection Report
50-397/97-20
cc w/enclosures:
Chairman
Energy Facility Site Evaluation Council
P.O. Box 43172
Olympia, Washington
98504-3172
Mr. Rodney L. Webring (Mail Drop PE08)
Vice President, Operations Support/PIO
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Greg O. Smith (Mail Drop 927M)
WNP-2 Plant General Manager
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. David A. Swank (Mail Drop PE20)
Manager, Regulatory Affairs
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
r
Washington Public Power Supply System
-3-
Mr. Albert E. Mouncer (Mail Drop 396)
Chief Counsel
Washington Public Power Supply System
P.O. Box 968
Richland, Washington
99352-0968
Mr. Paul Inserra (Mail Drop PE20)
Manager, Licensing
Washington Public Power Supply System
P.O. Box 968
- Richland, Washington
99352-0968
Perry D. Robinson, Esq.
Winston 8 Strawn
1400 L Street, N.W.
- Washington, D.C. 20005-3502
Washington Public Power Supply System
-4-
FiB
j 9
i998
E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
G. Sanborn, EO
R. Wise, SAC
W. L. Brown, RC
J. Lieberman, OE, MS: 7-H5
OE:EA File, MS: 7-H5
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:i WN2iWN720RP.SAB
To receive copy of document, Indicate in box: "C" = Copy without enclosures
"E" = Copy with enclosures "N" "- No copy
RIV:SRI
DRS:OB
DRS:PSB
SPE:DRP/E
BC:DRP/E
SABoynton'RMeadows*
MPShannon*
GWJohnston*
HJWong*
2/1 7/98 (HJW)
2/13/98 (HJW)
2/12/98 (E)
2/12/98 (E)
2/17/98 (HJW)
SAC
D:DRP
GMVasquez*
2/17/98 (E)
- previously concurred
RWise*
2/17/98 (E)
TPGwynn
2/
/98
OFFICIAL RECORD COPY
Washington Public Power Supply System
-4-
F.B tg
i998
E-Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/E, WCFO)
Senior Project Inspector (DRP/E, WCFO)
Branch Chief (DRP/TSS)
WCFO File
G. Sanborn, EO
R. Wise, SAC
W. L. Brown, RC
J. Lieberman, OE, MS: 7-H5
.
OE:EA File, MS: 7-H5
Resident Inspector
DRS-PSB
MIS System
RIV File
M. Hammond (PAO, WCFO)
DOCUMENT NAME: R:i WN2iWN720RP.SAB
To receive copy of document. Indicate in box: "C""-Copy without enclosures
"E" = Cop
with enclosures "N"= No cop
RIV:SRI
DRS:OB
DRS:PSB
SPE:DRP/E
BC:DRP/E
SABoynton*
TRMeadows
MPShannon*
GWJohnston*
HJWong*
2/17/98 (HJW)
2/1 3/98 (HJW)
2/1 2/98 (E)
2/12/98 (E)
2/17/98 (HJW)
GMVasquez*
2/17/98 (E)
- previously concurred
SAC
RWise*
2/17/98 (E)
D:DRP
TPGwynn
2/
/98
";/Ail,'FFICIALRECORD COPY