Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17313A080 + (05:01:20, 8 January 2025)
- ML17313A077 + (05:01:21, 8 January 2025)
- IR 05000266/2017003 + (05:01:43, 8 January 2025)
- IR 05000461/2017003 + (05:02:10, 8 January 2025)
- SECY-17-0116, Staff Statement in Support of the Uncontested Hearing for Issuance of a Construction Permit for the Northwest Medical Isotopes, LLC Production Facility + (05:02:12, 8 January 2025)
- ML17313A030 + (05:02:15, 8 January 2025)
- ML17313A027 + (05:02:19, 8 January 2025)
- ML17313A003 + (05:02:20, 8 January 2025)
- ML17312B775 + (05:02:24, 8 January 2025)
- ML17312B762 + (05:02:28, 8 January 2025)
- ULNRC-06398, Special Report 2017-02: Non-Functional Seismic Instrument for Greater than 30 Days + (05:02:29, 8 January 2025)
- IR 05000528/1997024 + (05:02:31, 8 January 2025)
- ML17312B755 + (05:02:33, 8 January 2025)
- ML17312B754 + (05:02:34, 8 January 2025)
- ML17312B753 + (05:02:35, 8 January 2025)
- ML17312B752 + (05:02:35, 8 January 2025)
- ML17312B750 + (05:02:36, 8 January 2025)
- ML17312B749 + (05:02:37, 8 January 2025)
- ML17312B748 + (05:02:37, 8 January 2025)
- ML17312B747 + (05:02:38, 8 January 2025)
- ML17312B746 + (05:02:39, 8 January 2025)
- ML17312B745 + (05:02:43, 8 January 2025)
- ML17312B744 + (05:02:44, 8 January 2025)
- ML17312B742 + (05:02:47, 8 January 2025)
- ML17312B741 + (05:02:48, 8 January 2025)
- TAC:M83654 + (05:02:51, 8 January 2025)
- ML17312B740 + (05:02:53, 8 January 2025)
- IR 05000528/1997015 + (05:02:54, 8 January 2025)
- PNO-IV-97-058, on 971020,shutdown Expected to Be Greater than 72 H After Manual Scram Occurred.Licensee Plans Go to Mode 5 for Outage to Repair or Replace Lower Bearing for RCP Number 2B.State of Az Will Be Informed + (05:02:56, 8 January 2025)
- ML17312B735 + (05:02:57, 8 January 2025)
- ML17312B733 + (05:02:58, 8 January 2025)
- TAC:M99104 + (05:02:58, 8 January 2025)
- ML17312B730 + (05:02:59, 8 January 2025)
- ML17312B724 + (05:03:00, 8 January 2025)
- ML17312B729 + (05:03:00, 8 January 2025)
- ML17312B723 + (05:03:01, 8 January 2025)
- ML17312B721 + (05:03:01, 8 January 2025)
- ML17312B719 + (05:03:02, 8 January 2025)
- 05000529/LER-1997-003-02, :on 970907,inadvertent Loss of Power & EDG Start Occurred Due to Procedural Error.Changed Train a & Train B Edg/Ist ST Procedures to Consistently Reflect Proper Pretest Staging Hand Switches + (05:03:03, 8 January 2025)
- ML17312B717 + (05:03:05, 8 January 2025)
- ML17312B716 + (05:03:06, 8 January 2025)
- ML17312B714 + (05:03:07, 8 January 2025)
- ML17312B713 + (05:03:08, 8 January 2025)
- ML17312B712 + (05:03:09, 8 January 2025)
- ML17312B710 + (05:03:09, 8 January 2025)
- ML17312B709 + (05:03:10, 8 January 2025)
- ML17312B708 + (05:03:11, 8 January 2025)
- ML17312B706 + (05:03:12, 8 January 2025)
- 05000530/LER-1997-003, :on 970215,seven Main Steam Safety Valves Were Found Out of Tolerance Prior to Refueling Outage.Safety Analysis Performed Based Upon as-found MSSV Data Which Demonstrated That MSSVs Would Perform Safety Functions + (05:03:13, 8 January 2025)
- 05000530/LER-1997-003-01, Forwards LER 97-003-01,reporting Test Results of Main Steam Safety Valve as-found Lift Settings That Were Out of Tolerance Limits Specified in TS Limiting Condition for Operation 3.7.1.1 + (05:03:15, 8 January 2025)
- ML17312B699 + (05:03:17, 8 January 2025)