Forwards Insp Repts 50-528/97-22,50-529/97-22 & 50-530/97-22 on 970908-12 & Notice of Violation.Violation Identified for Failure to Translate Requirement from Design Change Package to Work Order
ML17312B714
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/08/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17312B715 List:
References
50-528-97-22, 50-529-97-22, 50-530-97-22, NUDOCS 9710150064
Download: ML17312B714 (14)


See also: IR 05000528/1997022

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

V

CCESSION NBR:9710150064

DOC.DATE: 97/10/08

NOTARIZED: NO

DOCKET

FACIL:STN-50-528 Palo Verde Nuclear Station,

Unit 1, Arizona Publi

05000528

STN-50-529 Palo Verde Nuclea'r Station, Unit 2, Arizona Publi

05000529

STN-50-530 Palo Verde Nuclear Station,

Unit 3, Arizona Publi

05000530

AUTH.NAME

AUTHOR AFFILIATION

HOWELL,A.T.

Region

4 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

LEVINE,J.M.

Arizona Public Service

Co. (formerly Arizona Nuclear

Power

SUBJECT:

Forwards

insp repts

50-528/97-22,50-529/97-22

& 50-530/97-22

on 970908-12

& notice of violation.Violation identified for

failure to translate

requirement

from design

change

package

to work order.

DISTRIBUTION CODE:

IE01F

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:STANDARDIZED PLANT

Standardized

plant.

Standardized

plant.

05000528

G

05000529

05000530

0

RECIPIENT

ID CODE/NAME

PD4-2

PD

COPIES-

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

THOMAS,K

COPIES

LTTR ENCL

1

1

EXTERNAL:

ACRS

AEOD/TT

ENTE

FB

NRR/DRPM/PERB

OE DIR

RGN4

FILE

01

LITCO BRYCE,J

H

NRC

PDR

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

AEOD/SPD/RAB

.

DEDRO

NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS2

NOAC

NUDOCS FULLTEXT

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

0

KOADEO FROM

iNPiC FLOPPY

N

t

NOTE TO ALL "RIDS" RECZPIENTS:

PLEASE, HELP US TO REDUCE WAS E.

TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECFZVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

fl

I

'

CQ

~ ~

'.<gC"

-" iR REGULATORY

CO>'Ai'J

I

~

~

'I

~RI ~r <<>4"

'v0

~Q4 ~<orolv rEX IS

6Di \\ oQ6>>

October

8,

1997

James

M. Levine, Senior Vice

President,

Nuclear

Arizona Public Service Company

P.O. Box 53999

Phoenix, Arizona 85072-3999

SUBJECT:

NRC INSPECTION REPORT 50-528/97-22; 50-529/97-22; 50-530/97-22 AND

NOTICE OF VIOLATION

Dear Mr. Levine:

A special NRC inspection was conducted

September 8-12, 1997, at your Palo Verde

Nuclear Generating Station, Units 1, 2, and 3, reactor facilities to review the inadvertent

dilution of the Unit 2 spent fuel pool on August 12, 1997.

The event occurred during the

installation of a modification to provide a permanent

backup air supply to the spent fuel

pool transfer canal gate seal.

The enclosed report presents

the scope and results of that

inspection.

While the overall results of the inadvertent dilution of the Unit 2 spent fuel pool had minor

safety significance in this particular instance, the contributing factor of poor inter-

departmental

communications

has the potential to lead to safety-significant events.

This is

third event this year, documented

in NRC inspection reports (e.g., 50-528;-529;-530/97-

09 and 97-15), in which poor communications

have been contributors.

In this event, none

of the personnel

supervising the activities evaluated the synergistic effects of the three

activities ongoing in the spent fuel pool area.

The control room operators were not aware

of one of the activities, the filter replacement training in the cask loading pit, which was

not on the work schedule,

was not evaluated for risk, and was performed under an

"activity tracking only" work order.

While we understand

that your work control process

allows for nonsafety-related

activities to be performed in this manner, your work control

process implementation was weak in that a nonsafety-related

task challenged the ability of

the spent fuel pool to perform its safety-related

functions.

A violation of NRC requirements

was identified for the failure to translate

a requirement

from the design change package to the work order.

This requirement was intended to

prohibit fuel movement or handling while installing the modification.

This violation is of

concern because

the reliance on the skill-of-the-craft of the work planner to prepare the

work package

and the resulting work order review and approval did not provide assurance

that this requirement would be met.

97fOf50064 97f008

PDR

ADOCK 05000528

G

PDR

llllllllllllllIHIllllllllillIll

0

Arizona Public Service Company

-2-

The violation is cited in the enclosed

Notice of Violation (Notice) and the circumstances

surrounding this violation are described

in detail in the enclosed report.

Please note that

you are required to respond to this letter and should follow the instructions specified in the

enclosed

Notice when preparing your response.

The NRC will use your response,

in part,

to determine whether further enforcement action is necessary

to ensure compliance with

regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter,

its enclosure,

and your response

will be placed in the NRC Public Document Room (PDR).

To the extent possible, your response

should not include any personal privacy, proprietary,

or safeguards

information so that it can be placed in the PDR without redaction.

Should you have any questions

concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

Arthur T. Howell III, Director

Division of Reactor Safety

Docket Nos.:

50-528; 50-529; 50-530

License Nos.:

NPF-41; NPF-51; NPF-74

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

50-528/97-22; 50-529/97-22;

50-530/97-22

cc w/enclosures:

Mr. Steve Olea

Arizona Corporation Commission

1200 W. Washington Street

Phoenix, Arizona 85007

Douglas K. Porter, Senior Counsel

Southern California Edison Company

Law Department,

Generation Resources

P.O; Box 800

Rosemead,

California 91770

jI

~,& '

Arizona Public Service Company

Chairman

Maricopa County Board of Supervisors

301 W. Jefferson,

10th Floor

Phoenix, Arizona 85003

Aubrey V. Godwin, Director

Arizona Radiation Regulatory Agency

4814 South 40 Street

Phoenix, Arizona 85040

Angela K. Krainik, Manager

Nuclear Licensing

.Arizona Public Service Company

P.O. Box 52034

Phoenix, Arizona 85072-2034

John C. Horne, Vice President

Power Supply

El Paso Electric Company

2025 N. Third Street, Suite 220

Phoenix, Arizona 85004

Terry Bassham,

Esq.

General Counsel

El Paso Electric Company

123 W. Mills

El Paso, Texas

79901

Mr. Robert Burt

Los Angeles Department of Water 5 Power

Southern California Public Power Authority

111 North Hope Street, Room 1255-B

Los Angeles, California 90051

Mr. David Summers

Public Service Company of New Mexico

414 Silver SW, ¹0604

Albuquerque,

New Mexico 87102

Mr. Brian Katz

Southern California Edison Company

14300 Mesa Road, Drop D41-SONGS

San Clemente, California 92672

Arizona Public Service Company

Mr. Robert Henry

Salt River Project

6504 East Thomas Road

Scottsdale,

Arizona 85251

N

Arizona Public Service Company

-4-

E-Mail

E-Mail

E-Mail

E-Mail

E-Mail

E-Mail

report to T. Frye (TJF)

report to T. Hiltz (TGH)

report to NRR Event Tracking System (IPAS)

report to Document Control Desk (DOCDESK)

report to Richard Correia (RPC)

report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

ORS

AI 97-G-0125

DOCUMENT NAME: R:t PV'tPV722RP.CJP

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy with enclosures

"N" = No copy

RIV:Rl:MB

C:MB

E

D:DRP

D:D

CJPaulk/Imb

DAPowers

TPGwynn

t t(,

g

AT

wel

09/jg/97

09

/97

09

97

OFFICIAL RECORD COPY

/97

Arizona Public Service Company

.4-

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bcc to DCD (IE01)

bcc distrib. by RIV:

Regional Administrator

DRP Director

Branch Chief (DRP/F, WCFO)

Senior Project Inspector (DRP/F, WCFO)

Branch Chief (DRP/TSS)

WCFO File

Resident Inspector

DRS-PSB

MIS System

RIV File

M. Hammond (PAO, WCFO)

'DRS Aj 97-G-0125

DOCUMENT NAME: R:t PV>PV722RP.CJP

To receive copy of document, indicate in box: "C" = Copy without enclosures

"E" = Copy.with enctosures

"N" = No copy

RIV:Rl:MB

CJPaulk/Imb

09/jg/97

C:MB

E

DAPowers

09

/97

D:DRP

TPGwynn

09

97

~

OFFICIAL RECORD COPY

D:D

AT

wel

P

/97