ML17312B723

From kanterella
Jump to navigation Jump to search
Informs That Util Would Like to Postpone Providing Response to 970911 RAI Re Proposed TS Amend Request.Assessment of Impact of Gl,Reg Guide DG-1074 & Proposed TS Re SG Tube Integrity & Review of Industry Position Needed
ML17312B723
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/07/1997
From: James M. Levine
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TASK-*****, TASK-RE 102-04025-JML-S, 102-4025-JML-S, NUDOCS 9710160147
Download: ML17312B723 (6)


Text

I, 'I CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

R ACC)ESSI ON NBR: 9710160147 DOC. DATE 97/10/07 NOTARIZED:

NO DOCKET FACIL STN50528 Palo VeT de Nuclear Stationi Unit 1> Arizona Pub 1 i 05000528 STN-50-529 Palo Verde Nuclear Station>

Unit 2> Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Stationi Unit 3i Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION LEVINE. J. M.

Arizona Public Service Co.

(formerly Arizona Nuclear Poeer RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs that util mould like to postpone providing response to 970911 RAI re proposed TS amend request. Assessment of-impact of GLI reg guide DG-1074 5 pT oposed TS re SG tube integritg 5 review of industry position needed.

DISTRIBUTION. CODE:

AOOID COP IEE RECEIVED LTR I

ENCL Cj SIZE:

TITLE:

OR Submittal:

General Distribution E

NOTES: STANDARDIZED PLANT Standardi zed plant.

Standardized plant.

G 05000528 050005290 05000530 R

RECIPIENT ID CODE/NAME, PD4-2 LA THOMASI K COPIES LTTR ENCL REC IP IENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL INTERNAL:

ACRS NRR/DE/ECGB/A NRR /DRCH/HIC 8 NRR/DSSA/SRXB OGC/HDS2 01 NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT D

EXTERNAL:

NOAC NRC PDR U

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 41S-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL

a V

'0 r

Palo Verde Nuclear Generating Station James M. Levine Senior Vice President Nuclear TEL (602)393-5300 FAX(602)3934077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ 85072-2034 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555 102-04025-JML/SAB/RMW October 7, 1997

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530

Response

to Request for Additional Information Regarding Proposed Technical Specification Amendment for Steam Generator Tube Sleeving.

Dear Sirs:

Arizona Public Service Company (APS), through active involvement with the Electric Power Research Institute (EPRI) and the Nuclear Energy Institute (NEI), understands that the NRC will soon be issuing a Generic

Letter, Regulatory Guide (DG-1074) and proposed Technical SpeciTications regarding steam generator tube integrity.

We are aware that these documents may have a significant impact on our current Technical Specifications as well as our proposed sleeving Technical Specification amendment.

Therefore, APS would like to postpone providing the information that you requested in your letter to APS dated September 11,

1997, regarding our proposed Technical Specification amendment request, until APS has had the opportunity to assess the impact of these documents and has had the opportunity to review any industry position that may be developed in response to these documents.

In that way, any new and pertinent guidance that the Generic Letter, Regulatory Guide, proposed Technical Specifications or industry position may be incorporated, ifappropriate for APS, into our proposed Technical Specification amendment request.

APS also recognizes that this postponement will result in delaying your review and approval of our proposed amendment request.

Once the Generic Letter, Regulatory Guide and proposed Technical SpeciTications are issued, APS will work with you to develop a new schedule to allow for timely review and approval of our proposed amendment request.

97iOi60i47 97i007 PDR ADQCK 05000528 P

PDR II!Illllllllllllllllllllllllllllllllllll

. 0 s

~l 1

f 1

I

U. S. Nuclear Regulatory Commission Response to Request forAdditional Information Regarding Proposed Technical Specification Amendment for Steam Generator Tube Sleeving.

Page 2 Please contact Mr. Scott Bauer at (602) 393-5978 ifyou have any questions or would like additional information regarding this matter.

Sincerely, JML/SAB/RMW/rlh cc:

E. W. Merschoff K. M. Thomas J. H. Moorman K. E. Perkins

r