Text
cladding temperatures.
This was demonstrated in the CESSAR FSAR SBLOCA spectrum analysis, which became the break spectrum analysis for PVNGS Cycle l.
The peak cladding temperatures from the Cycle 1 analyses for the 0.20, 0.35, and 0.5 ft'reaks were all calculated to occur shortly after injection from the SITs began.
'The peak cladding temperature for the 0.05 ft'reak was calculated to occur prior to the initiation of flow from the SITs.
Based on the above. the licensee concluded that the 0.05 ft'reak size with a peak cladding temperature of'907'F was.the limiting SBLOCA break size.
This peak cladding temperature is less than the 10 CFR Part 50 acceptance criteria of 2200'F.
3.1.3 Post-LOCA Long-Term Cooling (LTC)
\\
The licensee performed the post-LOCA LTC analysis using ABB-CE's NRC-approved evaluation model.
The same methodology was used in the previous PVNGS
- LTC, analysis performed at the current rated core power of 3800 MWt.
The licensee stated that the objective of the analysis was to demonstrate, for a complete spectrum of break sizes. that (1) core decay heat is removed in the long term while the core temperature is maintained at an acceptably low value, and (2) the boric acid concentration in the core is maintained below its solubil,ity limit.
The licensee's analysis demonstrated that core decay heat can be removed over the long term for a complete spectrum of break sizes.
For breaks smaller than 0.03 ft. core decay heat removal can be accomplished by initiating and maintaining shutdown cooling.
For breaks larger than 0.006 ft'. core decay heat removal can be accomplished by maintaining simultaneous hot-and cold-leg high-pressure safety injection.
The overlap in these break sizes is the range within which either the large-or small-break cooling procedures could be successfully performed.
The analysis determined that more than 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> is required to.exhaust all auxiliary feedwater during a cooldown of the RCS.
This gives the operator ample time to determine.
and begin using, the appropriate long-term decay heat removal method.
The licensee indicated that the analysis for the proposed RTP increase demonstrated that the boric acid concentration in the core is maintained below its solubility limit if a minimum high-pressure safety injection flow of 380 gpm is begun to both the hot and cold side of the RCS between 2 and 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after the start of the LOCA.
This is 20 gpm more than the minimum required flow rate of 360 gpm tor the previous analysis at a rated core power of 3800 NWt.
UFSAR Section 6.3.3.4.1 describes the 2-3 hour safety injection (SI) delay assumed in the previous analysis.
TS Surveillance Requirement 4.5.2.h for each of the PVNGS units requires a minimum flow well in excess of the 380 gal/min hot-and cold-side flow needed to meet the safety analysis requi rement for operation at the proposed increased RTP.
(TS 4.5.2.h requires.
for simultaneous hot and cold leg injection, 525 gpm hot leg flowrate and 525 gpm sum of cold leg flowrates).
I
~
9710070i85 970929 PDR ADQCK 05000528 P
v
Mr. James M. Levine cc w/encl:
Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix. Arizona 85007 Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department.
Generation Resources PRO.
Box 800
- Rosemead, California 91770 Senior Resident Inspector USNRC P. 0.
Box 40 Buckeye. Arizona 85326 Regional Administrator, Region IV U. S. Nuclear Regulatory Commission Harris Tower 8 Payi]lion 611 Ryan Plaza Drive, Suite 400 Arlington. Texas 76011-8064
- Chairman, Board of Supervisors ATTN:
Chairman 301 W. Jefferson.
10th Floor Phoenix.
Arizona 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street
- Phoenix, Arizona 85040 Ms. Angela K. Krainik. Manager Nuclear Licensing Arizona Public Service Company P.O.
Box 52034
- Phoenix, Arizona 85072-2034 Mr. John C. Horne. Vice President Power Supply Palo Verde Services 2025 N. Third Street.
Suite 220 Phoenix, Arizona 85004 Mr. Robert Burt Los Angeles Department of Water 8
Power Southern California Public Power Authority ill North Hope Street.
Room 1255-B Los Angeles, California 90051 Mr. David Summers Public Service Company of New Mexico 414 Si,iver SW, f0604 Albuquerque, New Mexico 87102 Mr. Robert D. Bledsoe Southern California Edison Company 14300 Mesa
- Road, Drop D41-SONGS San Clemente.
California 92672 Mr. Robert Henry Salt River Project 6504 East Thomas Road Scottsdale.
Arizona 85251 Terry Bassham, Esq.
General Counsel El Paso Electric Company 123 W. Mills El Paso, Texas 79901
p p