Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17313A704 + (04:51:01, 8 January 2025)
- ML17313A703 + (04:51:05, 8 January 2025)
- IR 05000528/1998008 + (04:51:14, 8 January 2025)
- ML17313A700 + (04:51:17, 8 January 2025)
- ML17313A699 + (04:51:19, 8 January 2025)
- ML17313A695 + (04:51:21, 8 January 2025)
- ML17313A692 + (04:51:22, 8 January 2025)
- ML17313A691 + (04:51:23, 8 January 2025)
- ML17313A689 + (04:51:25, 8 January 2025)
- TAC:MA0681 + (04:51:26, 8 January 2025)
- ML17313A688 + (04:51:29, 8 January 2025)
- ML17313A687 + (04:51:31, 8 January 2025)
- ML17313A686 + (04:51:32, 8 January 2025)
- 05000530/LER-1998-004, Forwards LER 98-004-00 Prepared & Submitted Pursuant to 10CFR50.73.LER Reports TS Violation Due to non-compliance with TS 3.9.3 for Not Establishing Containment Penetration Isolation During Core Alterations + (04:51:36, 8 January 2025)
- ML17313A682 + (04:51:39, 8 January 2025)
- 05000528/LER-1998-003-01, Forwards LER 98-003-01,IAW 10CFR50.73.Interim Corrective Actions Which Were Implemented to Control Fbt Blocking, Have Subsquently Been Discontinued Based Upon More Recent Analysis + (04:51:43, 8 January 2025)
- ML17313A678 + (04:51:46, 8 January 2025)
- ML17313A676 + (04:51:48, 8 January 2025)
- ML17313A674 + (04:51:49, 8 January 2025)
- ML17313A672 + (04:51:51, 8 January 2025)
- ML17313A670 + (04:51:52, 8 January 2025)
- IR 05000528/1998007 + (04:52:01, 8 January 2025)
- ML17313A666 + (04:52:04, 8 January 2025)
- 05000528/LER-1998-008, :on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements + (04:52:08, 8 January 2025)
- ML17313A658 + (04:52:12, 8 January 2025)
- ML17313A656 + (04:52:16, 8 January 2025)
- TAC:MA3743 + (04:52:20, 8 January 2025)
- ML17313A655 + (04:52:23, 8 January 2025)
- ML17313A642 + (04:52:27, 8 January 2025)
- ML17313A636 + (04:52:28, 8 January 2025)
- 05000530/LER-1998-003, Forwards LER 98-003-00 Prepared & Submitted Per 10CFR50.73.LER Repts out-of-tolerance Condition of Several MSSV Which Were Discovered During pre-outage Testing + (04:52:31, 8 January 2025)
- ML17313A632 + (04:52:32, 8 January 2025)
- ML17313A631 + (04:52:34, 8 January 2025)
- ML17313A630 + (04:52:36, 8 January 2025)
- TAC:M93670 + (04:52:37, 8 January 2025)
- ML17313A628 + (04:52:40, 8 January 2025)
- ML17313A622 + (04:52:42, 8 January 2025)
- IR 05000528/1998006 + (04:52:52, 8 January 2025)
- ML17313A620 + (04:52:56, 8 January 2025)
- ML17313A618 + (04:52:58, 8 January 2025)
- 05000528/LER-1998-007-01, Forwards LER 98-007-01 Re Letdown Leak That Required Entry Into TS LCO 3.0.3.LER Contains Specific Commitments for Correcting Condition + (04:53:01, 8 January 2025)
- ML17313A612 + (04:53:03, 8 January 2025)
- ML17313A611 + (04:53:04, 8 January 2025)
- IR 05000528/1998005 + (04:53:05, 8 January 2025)
- ML17313A608 + (04:53:11, 8 January 2025)
- ML17313A601 + (04:53:25, 8 January 2025)
- ML17313A600 + (04:53:28, 8 January 2025)
- ML17313A599 + (04:53:29, 8 January 2025)
- ML17313A598 + (04:53:31, 8 January 2025)
- ML17313A597 + (04:53:32, 8 January 2025)
- 05000530/LER-1998-002-02, :on 980814,B Train H Recombiner Was Noted Inoperable Due to cross-wired Power Receptacle.Cause of Event Is Under investigation.Cross-wired Power Supply Receptacle for B Train H Recombiner Was re-wired + (04:53:35, 8 January 2025)