ML17313A630
| ML17313A630 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/02/1998 |
| From: | Fields M NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML17313A629 | List: |
| References | |
| NUDOCS 9810090399 | |
| Download: ML17313A630 (18) | |
Text
~< ~EGy
+4 Po Cy A,
+a**+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&4001 RIZONA PUBLIC SERVICE COMPANY ET A DOCKET NO. STN 50- 2 PALO VERDE NUCLEAR GENERATING STATION UNIT NO. 'I AMENDMENTTO FACILITYOPERATING LICEN E Amendment No. 118 License No. NPF-41 The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated June 13, 1995, as supplemented by letters dated August 16, 1995, June 9, 1998, and September 6, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facilitywilloperate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities willbe conducted in compliance with the Commission's regulations; D..
The issuance of this amendment willnot be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-41 is hereby amended to read as follows:
98i0090399'8f002 PDR ADQCK 05000528 P
0 II (2)
Technical S ecifications and Environmental Protection Pl n The Technical Specifications contained in Appendix A, as revised through Amendment No. 118, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORYCOMMISSION Mel B. Fields, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear, Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
October 2, 1998
0 li P
~S REgi
+4
~
Po Cy
~C
+~
~o~
+a*++
UNITED STATES NUCLEAR REGULATORY COMMISSION
'WASHlkGTOk, D.C. 2055&4001 RIZONA PUBLIC SERVICE COMPANY ET AL.
DOCKET NO.
TN 0- 2 PALO VERDE NUCLEAR GENERATING STATION UNIT N
. 2 MENDMENTT FACILITYOPERATING LICENSE Amendment No. 118 License No. NPF-51 1.
The Nuclear Regulatory Commission (the Commission) has found that:
The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority dated June 13, 1995, as supplemented by letters dated August 16, 1995, June 9, 1998, and,September 6, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facilitywilloperate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities willbe conducted in compliance with the Commission's regulations; D.
The issuance of this amendment willnot be inimical to.the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-51 is hereby amended to read as follows:
0 (2)
Technical S ecificati ns and Environmental Protecti n Pl n The Technical Specifications contained in Appendix A, as revised through Amendment No. 118, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated into this license. APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
3.
This license amendment is effective as of the date of issuance.
.FOR THE NUCLEAR REGULATORYCOMMISSION
<~x r'el B. Fields, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV, Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
October 2, 1998
41
~S Afgi
+4 Po Cy
+c 0
O
~o
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 205554001 ARIZONAPUBLIC SERVICE COMPANY ET AL.
DOCKET NO. STN 5-PALO VERDE NUCLEAR GENERATING STATION UNIT N MENDMENTTO FACILITYOPERATING LICENSE Amendment No. 118 License No. NPF-74 1..
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Arizona Public Service Company (APS or the licensee) on behalf of itself and the Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Company, Public Service Company of New Mexico,'Los Angeles Department of Water and Power, and Southern California Public Power Authority dated June 13, 1995, as supplemented by letters dated August 16, 1995, June 9, 1998, and September 6, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facilitywilloperate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission;.
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii)that such activities willbe conducted in compliance with the Commission's regulations; D.
The issuance of this amendment willnot be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
I Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-74 is hereby amended to read as follows:
Ik
~I (2)
Techni I S ecification and Environmental Protection Pl n The Technical Specifications contained in Appendix A, as revised through Amendment No. 118, and the Environmental Protection Plan contained, in Appendix B, are hereby incorporated into this license.
APS shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORYCOMMISSION Mel B. Fields, Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
October 2, 1998
II
TTACHMENTTO LICENSE AMENDMENT AMENDMENTNO. 118 TO FACILITYOPERATING LICENSE NO. NPF-41 AMENDMENTNO. 118 TO FACILITYOPERATING LICENSE NO. NPF-1 AND AMENDMENTNO 118 TO FACILITYOPERATING LICENSE NO. NPF-74 DOCKET NOS STN 0-528 STN 50-529 AND STN'50-5 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change.
REMOVE 3.5.1-1 3.5.2-1
~INSER 3.5.1-1 3.5.2-1
SITs-Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS}
3.5. 1 Safety Injection Tanks (SITs} - Operating LCO 3.5.1 Four SITs shall be OPERABLE.
APPLICABILITY:
NODES 1 and 2.
MODES 3 and 4: with pressurizer pressure
> 1837 psia.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One SIT inoperable due A.1 Restore SIT to to boron concentration OPERABLE status.
not within. limits.
OR One SIT inoperable due
.to inability to verify level or pressure.
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> B.
One SIT inoperable for B.l Restore SIT to reasons other than OPERABLE status.
Condition A.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> C.
Required Action and associated Completion Time of Condition A or B not met.
C.l Be in MODE 3.
AND C.2 Reduce pressurizer pressure to
< 1837 psia.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 12 hours D.
Two or more SITs inoperable.
D.l Enter LCO 3.0.3.
Immediately
'ALO VERDE UNITS 1.2.3 3.5.1-1 AHENDHENT NO. ~,118
SITs-Shutdown 3.5.2
,3.5 EMERGENCY CORE COOLING SYSTEMS
{ECCS) 3.5.2 Safety Injection Tanks (SITs)-Shutdown LCO 3.5.2 Four SITs shall be OPERABLE with a borated water volume
) 39X wide range indication and ( 83X wide range indication; OR Three SITS shall be OPERABLE with a borated water volume
> 60X.wide range indication and < 83X wide range indication.
APPLICABILITY:
MODES 3 and 4 with pressurizer pressure ( 1837 psia.
ACTIONS CONDITION A.
One required SIT inoperable due to boron concentration not within limits..
, One required SIT inoperable due to inability to verify level or pressure.
B.
One required SIT inoperable for reasons other than.
Condition A.
REQUIRED ACTION A.l Restore reauired SIT to OPERABLE status.
B. 1 Restore reaui red SIT to OPERABLE status.
COMPLETION TIME 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 24 hours C.
Inoperabi littyof the required SIT was discovered but not restored while in ITS 3.5.1, "SITs-Operating" OR Required Action and associated Completion
- Time of Condition A or B not met.
D.
Two or more required SITs'noperable.
C.l Be in MODE 5.
D.l Enter LCO 3.0.3.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Immedi ately PALO VERDE 'UNITS 1.2.3 3.5.2-1 AMENDMENT NO. kP-,118
II
'/