ML17313A618
| ML17313A618 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 09/30/1998 |
| From: | Harrell P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17313A619 | List: |
| References | |
| 50-528-98-06, 50-528-98-6, 50-529-98-06, 50-529-98-6, 50-530-98-06, 50-530-98-6, NUDOCS 9810060184 | |
| Download: ML17313A618 (12) | |
See also: IR 05000528/1998006
Text
CATEGORY 2
REGULATORY INFORMATION DISTRIBUTION SYSTEM
(RZDS)
CESSION NBR:9810060184
DOC.DATE: 98/09/30
NOTARIZED: NO
DOCKET
FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi
05000528
STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi
05000529
STN-50-530 "Palo Verde Nuclear Station, Unit 3, Arizona Publi
05000530
AUTH.NAME
AUTHOR AFFILIATION
HARRELL,P.H.
Region
4 (Post
820201)
RECIP.NAME
RECIPIENT AFF1LIATION
LEVINE,J.M.
Arizona Public Service
Co.
(formerly Arizona Nuclear Power
SUBJECT:
Forwards insp repts 50-528/98-06,50-529/98-06
& 50-530/98-06
on 980712-0822.0ne violation occurred when operations
personnel
became narrowly focused
on one recpxirement
S
failed to recognize actions would result in entry into TS.
E
DISTRIBUTION CODE:
ZE01F
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
E
NOTES: STANDARDIZED PLANT
Standardized
plant.'tandardizedplant.
05000528 0
05000529
05000530 R
REC1PIENT
ID CODE/NAME
PD4-2.PD
ERNAL: ACRS
A
FZLE CENTER
PECB
NUDOCS-ABSTRACT
OGC/HDS2
COPIES
LTTR ENCL
1
1
2
2
1
1
1.
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
FIELDS,M
AEOD/SPD/RAB
DEDRO
NRR/DRCH/HOHB
NRR/DRPM/PERB
OE DIR
RGN4
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
D
EXTERNAL: LITCO BRYCE,J H
1
1
NRC PDR
1
1
NOAC
NUDOCS FULLTEXT
1
1
1
1
N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD1
ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES
REQUIRED: LTTR
19
ENCL
19
,1
0
g
REJIG+
c<
+
Cy
-y
g
0a
~ 3
a0
Cy
UNITEDSTATES
NUCLEAR REGULATORYCOMMISSION
REGION IV
611 RYAN PLAZADRIVE. SUITE 400
ARLINGTON.TEXAS 76011%064
SEP 30 898
James M. Levine, Senior Vice
President, Nuclear
Arizona Public Service Company
P.O. Box 53999
Phoenix, Arizona 85072-3999
SUBJECT: NRC INSPECTION REPORT 50-528/9M%; 50-529/98%6; 50-530/98-06 AND
Dear Mr. Levine:
From July12 through August 22, 1998, an inspection was conducted at your Palo Verde
Nuclear Generating Station, Units 1, 2, and 3, reactor facilities. The enclosed report presents
the scope and results of that inspection.
During the 6-week period covered by this inspection, your conduct of activities at the Palo
Verde facilitywas generally characterized by safety-conscious operations, sound engineering
and maintenance'practices,
and careful radiological controls; however, a.violation of NRC
requirements was identified.
The violation occurred when operations personnel became narrowly focused on one
requirement and failed to recognize that their actions would result in entry into Technical
Specification 3,.0.3. "
.
The,NRC has concluded that information regarding'the reasons for the violations, the corrective
actions taken and planned to correct the violation and prevent recurrence are already
adequately addressed
on the docket in Licensee Event Report 50-530/98-001 for the violation.
Therefore, you are not required to respond to this letter unless the description therein does not
accurately reflect your corrective actions or your position. In that case, or ifyou choose to
provide additional information, you should followthe instructions specified in the enclosed
Notice.
-'n
accordance with 10 CFR 2.790 of the NRC's 'Rules of Practice," a copy of this letter, its
enclosures,
and your response willbe placed in the NRC Public Document Room (PDR).
98i0060i84 980930
1'DR
ADOCK 0500052$
6
.
Arizona Public Service Company
-2-
Should you have any questions concerning this inspection, we willbe pleased to discuss them
with you.
Sin
ely,
. Harrell, Chief.
Pr 'ect Branch D
Divi ion of Reactor Projects
Docket Nos.:
50-528
50-529
50-530
License Nos.: NPF-41
NPF-51
Enclosures:
1.
2.
NRC Inspection Report
50-528/98-06; 50-529/98-06; 50-530/98-06
cc w/enclosures:
Mr. Steve Olea
Arizona Corporation Commission
1200 W. Washington Street
Phoenix, Arizona 85007
Douglas K. Porter, Senior Counsel
Southern California Edison Company
Law Department, Generation Resources
P.O. Box 800
Rosemead,
California 91770
Chairman
Maricopa County Board of Supervisors
301 W. Jefferson, 10th Floor
Phoenix, Arizona 85003
Aubrey V. Godwin, Director
Arizona Radiation Regulatory Agency
4814 South 40 Street
Phoenix, Arizona 85040
0
Arizona Public Service Company
Angela K. Krainik, Manager
Nuclear Licensing
Arizona Public Service Company
P.O. Box 52034
Phoenix, Arizona 85072-2034
John C. Horne, Vice President
~ Power Supply
El Paso Ele'ctric Company
2025 N. Third Street, Suite 220
Phoenix, Arizona 85004
Terry Bassham,
Esq.
General Counsel
El Paso Electric Company
123 W. Mills
El Paso, Texas
79901
Mr. Robert Burt
Los Angeles Department of Water 8 Power
Southern California Public Power Authority
111 North Hope Street, Room 1255-B
Los Angeles,: California 90051
Mr. David Summers
Public Service Company of New Mexico
Albuquerque, New Mexico 87102
Mr. Brian Katz
Southern California Edison Company
14300 Mesa Road, Drop D41-SONGS
San Clemente, California 92672
Mr. Robert Henry
Salt River Project
6504 East Thomas Road
Scottsdale, Arizona 85251
0
r
Arizona Public Service Company
-4-
SEP 30
I998
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
..bcc to DCD (IE01)
bcc distrib. by RIV:
. Regional Administrator
DRP Director-
Branch Chief (DRP/D)
Senior Project Inspector (DRP/D)
Branch Chief (DRP/TSS)
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:3 PNPV806RP.JHM
To receive copy of document, Indicate in box: "C" = Copy without enclosures
"E" ='op, viith enclosures "N" = No copy
PE:DRP/
GAPick
951/98
C:DRP/D
PHH
I
9/
RI:
/
DECor
and
9
/9
RI:D
NLSal
9~9
RI:DRP
DRC rte
9/
SRI:
D
JH
r
9
0'98
OFFICIALRECORD COPY
~ r ~
i
'
J
Arizona Public Service Company
SEP 30
j998
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
bcc distrib. by RIV:
Regional Administrator
DRP Director
Branch Chief (DRP/D)
Senior Project Inspector (DRP/D)
Branch Chief (DRP/TSS)
Resident Inspector
DRS-PSB
MIS System
RIV File
DOCUMENT NAME: R:5 PNPV806RP.JHM
To receive copy of document, Indicate In box: "C" = Copy without enclosures
"E" = Copy with enclosures
N" ~ No copy
PE:DRP
GAPick
9'/98
C:DRP D
PHH
9/
RI:
/
DEC r
and
9
/9
RI:D
NLSal
9/$)9
RI:DR
DRC rte
9/
OFFICIALRECORD COPY
SRI:
D
JH
r
9
9'98
'I
4
0
4i