Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199L238 + (09:01:08, 8 December 2024)
- ML20199L235 + (09:01:09, 8 December 2024)
- ML20199L236 + (09:01:09, 8 December 2024)
- ML20199L232 + (09:01:10, 8 December 2024)
- ML20199L234 + (09:01:10, 8 December 2024)
- ML20199L231 + (09:01:11, 8 December 2024)
- ML20199L227 + (09:01:12, 8 December 2024)
- ML20199L229 + (09:01:12, 8 December 2024)
- ML20199L225 + (09:01:13, 8 December 2024)
- ML20199L221 + (09:01:14, 8 December 2024)
- ML20199L219 + (09:01:16, 8 December 2024)
- ML20199L218 + (09:01:17, 8 December 2024)
- ML20199L217 + (09:01:18, 8 December 2024)
- ML20199L216 + (09:01:18, 8 December 2024)
- ML20199L213 + (09:01:19, 8 December 2024)
- ML20199L215 + (09:01:19, 8 December 2024)
- ML20199L212 + (09:01:20, 8 December 2024)
- ML20199L209 + (09:01:21, 8 December 2024)
- ML20199L207 + (09:01:22, 8 December 2024)
- ML20199L208 + (09:01:22, 8 December 2024)
- ML20199L205 + (09:01:23, 8 December 2024)
- ML20199L200 + (09:01:28, 8 December 2024)
- ML20199L193 + (09:01:28, 8 December 2024)
- ML20199L192 + (09:01:29, 8 December 2024)
- ML20199L189 + (09:01:30, 8 December 2024)
- 05000446/LER-1999-001, :on 981226,identified That TS Surveillance for Containment Integrity Verification Was Not Performed.Caused by Personnel Error.Required Surveillance Was Performed & Applicable Procedures Were Revised.With + (09:01:32, 8 December 2024)
- ML20199L186 + (09:01:33, 8 December 2024)
- ML20199L185 + (09:01:33, 8 December 2024)
- ML20199L182 + (09:01:36, 8 December 2024)
- ML20199L181 + (09:01:37, 8 December 2024)
- ML20199L179 + (09:01:38, 8 December 2024)
- IR 05000293/1986006 + (09:04:15, 8 December 2024)
- ML20199L174 + (09:04:17, 8 December 2024)
- ML20199L177 + (09:04:17, 8 December 2024)
- ML20199L172 + (09:04:18, 8 December 2024)
- ML20199L171 + (09:04:18, 8 December 2024)
- ML20199L170 + (09:04:19, 8 December 2024)
- ML20199L168 + (09:04:20, 8 December 2024)
- ML20199L167 + (09:04:20, 8 December 2024)
- ML20199L166 + (09:04:21, 8 December 2024)
- ML20199L165 + (09:04:21, 8 December 2024)
- 05000443/LER-1998-014-01, :on 981222,on Automatic Reactor Trip Occurred While at 100 Percent Power.Caused by Auxiliary Switch Linkage Pin in Breaker 163,fell Out Preventing Linkage from Actuating Auxiliary Contact.Breaker 163 Switch Reinstalled + (09:04:23, 8 December 2024)
- ML20199L163 + (09:04:24, 8 December 2024)
- ML20199L162 + (09:04:25, 8 December 2024)
- ML20199L161 + (09:04:25, 8 December 2024)
- ML20199L160 + (09:04:26, 8 December 2024)
- ML20199L159 + (09:04:27, 8 December 2024)
- ML20199L157 + (09:04:28, 8 December 2024)
- NRC-86-3138, Forwards Proprietary & Nonproprietary Amend 1 to Westinghouse Advanced PWR RESAR-SP/90 Preliminary Design Approval Module 1, Primary Side Safeguards Sys. Proprietary Amend Withheld (Ref 10CFR2.790) + (09:04:32, 8 December 2024)
- IR 05000528/1998001 + (09:04:33, 8 December 2024)
- ML20199L153 + (09:04:34, 8 December 2024)