l APPENDIX A NOTICE OF VIOLATION l Boston Edison Company Docket No. 50-293 Pilgrim Nuclear Power Station License No. DPR-35 As a result of the inspection conducted on Feorua:y 18, 1986 - March 7, 1986, and in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C), the following l

violation was identified:

i Technical Specification 4.4.A.2.c requires that replacement squib charges for i

the standby liquid control system (SLCS) te selected from a batch that has been tested during a manual initiation of the 5LCS.

Contrary to the above on April 10, 1984, replacement squib charges were in-i stalled in the SLCS from a batch that had not been tested during a manual initiation of the SLCS.

t This is a Severity Level IV Violation (Supplement I). [

Pursuant to the provision of .10 CFR 2.201, Boston Edison Company is hereby required

to cubmit to this office within thirty days of the date of the letter which trans-mitted tnis Notice, a written staterrent or explanation in reply, including (1) the
s

' corrective ste;s which have been taken and the results achieved; (2) corrective '

steps which will be taken to avoid further violation!,: and (3) the d.ite when full '

coop:iar.ce will be achieved. Wasre good cause is shown, consideration will be Di ven to extending this response time.

i 1

i i