ML20199L238
ML20199L238 | |
Person / Time | |
---|---|
Issue date: | 11/28/1997 |
From: | Black S NRC (Affiliation Not Assigned) |
To: | Rotti T NTS (NATIONAL TECHNICAL SYSTEMS) |
References | |
REF-QA-99900912 NUDOCS 9712010353 | |
Download: ML20199L238 (3) | |
Text
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ - _
L i
-November 28, 1997 Mr. Timothy Rotti, Division Manager National Technical Systems Nuclear Services Group 533 Main Street Acton, Massachusetts 01720
Dear Mr. Fredkin:
This letter confirms the upcoming Nuclear Regulatory Commission (NRC) hspection of National . '
Technical Systems, Nuclear Services Group on January 6 through 9,1998, as discussed during a November 25,1997 telept,ane conversation between Ms. Christine Briggs and Mr. Gregory Cwalina cf this office.
The inspection will review selected portions of your quality assurance program, and its implementation, as it relates to the supply of safety-related servicer to the nuclear industry.
This inspection will specifically review activities tclated to the procurement and dedication of 4 kv breakers for the Diablo Canyon nuclear plant. In addition, the inspection will review your 10 CFR Part 21 program and its implementation. We expect to conduct an entrance meeting at .
your offices at 8:30 am on January 6.
Your cooperation in providing the support needed to complete the scope of our inspection is appreciated. Should you hava any questions conceming this letter, pleas. conuct Mr. Cwalina at (301) 415-2983.
Sincerely, Original signed Dy: Suzanne C. Black Suzanne C. Black, Chief Quality Assurance, Vendor Inspection and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Regulation /
Docket No. 99900912 DISTRIBUTION: O HQMB R/F 6'/M
- Central Files -
Docket Files PUBLIC BRogers SAlexander DOCUMElJT NAME: G:\ draft \cwalina\nts. ann To receive a copy of tNe document. Indicate in the box: "C" = Copy without enclosures *E" = Copy with enclosures *N" = No copy 0FFICE DxCff:H0nB C DRCHS10MB C DRCH:HOMB e NAME GCCYdlina / .RAGrem " SCB1ack g o DATE 11/N/97 H 11/1V97 11/t197 0FFICIAL RECORD COPY m DM1- - y~ Fo d -13 9712010353 9iildt) , i.- J PDR 99900912 GA999 EECNATTS PDR
'f. "k. 'l.lhlh'llh a . = -
lk'a . Ma t DN' pfpf.
Qlh EM - - _ _
(b.b i
November 28, 1997 Mr. Timothy Rotti, Division Manager National Technical Systems Nuclear Services Group 533 Main Street Acton, Massachusetts 01720
Dear Mr. Fredkin:
This letter confirms the upcoming Nuclear Regula'ory Commission (NRC) inspection of National Technical Systems, Nuclear Services Group on January 6 through 9,1998, as dirassed during a November 25,1997 telephone conve.sation between Ms. Christine Briggs and Mr. Gregory Cwalina of this office.
The inspection will review selected portions of your quality assurance program, and its implementation, as it relates to the supply of safety-related services to the nuclear industry.
This inspection will specifically review activities related to the procurement and dedication of 4 kv breakers for the Diablo Canyon nuclear plant. In addition, the inspection will review your 10 CFR Part 21 program arid its implementation. We expect to conduct an entrance meeting at your offices at 8:30 am on January 6.
Your cooperation in providing the support needed to complete the scope of our inspection is appreciated. Should you have any questions conceming this letter, please contact Mr. Cwalina at (301) 415-2983.
Sincerely, Original signed by: Suzanne C. Black Suzanne C. Black, Chief Quality Assu.ance, Vendor Inspection and Maintenance Branch Division of Reactor Controls and Human Factors Office of Nuclear Reactor Ragulation Docket No. 99900912 DISTRIBUTION:
HQMB R/F Central Files Docket Files PUBLIC BRogers SAlexander DOCUMENT NAME: G:\ draft \cwalinrMts. ann Ts receive a copy of thle document. Indicate in the box: *C* = Copy wi hout t enclosures *E* = Copy with enclosures *N* = No copy 0FFICE DRCtht10PiB C DRCH:}iOMB C DRCH:HOMB e.
NAME GCC4dlina / .RAGr4m " SCBlack 4
,DATE 11/P/97 li 11/2f/97 11/t197 0FFICIAL RECORD COPY
November 28, 1997 Mr. Tinothy Rotti, Division Manager National Technical Systems Nuclear Services Group 533 Main Street Acton, Massachusetts 01720
Dear Mr. Fredkin:
This letter confirms the upcoming Nuclear Regulatory Commission (NRC) inspection of National Technical Systems, Nuclear Services Group on January 6 through v,1998, as discussed during a November 25,1997 telephone conversation between Ms. Christine Briggs and Mr. Gregory Cwalina of this office.
The inspection will review selected portions of your quality assurance program, and its implementation, as it relates to the supply of safaty-related ser aces to the nuclear industry.
This inspection will specifically review activities related to the procurement and dedication of 4 kv breakers for the Diablo Canyori nuclear plant, h1 addition, the inspection will review your 10 CFR Part 21 prog'im and its implement: tion. We expect to conduct an entrance meeting at your offices at 8:3C am on January 6.
Your cooperation in providing the support needed to complete the scope of our inspection is appreciated. Should you have any questions conceming this letter, please contact Mr. Cwalina at (301) 415 2983.
Sincerely, Original signed by: Suzanne C. Black Suzanne C. Black, Chief Quality Assurance, Vendor Inspection and Maintenance Branch Division of Recctor Controls and Human Factors Office of Nuclear Reactor Regulation Docket No. 09900912 DISTRIBUTION HQMB R/F Central Files Docket Files PUBLIC BRogers SAlexander DOCUMENT NAME: G:\ draft \cwalina\nts. ann Ta receive e copy of 94 document. Indicate in the box: "C" = Copy i.ithout enclosures *E' = Copy witi enclosures *N* = No copy
^
0FFICE c- DRCH:HOMB e, DRCs}Iiff8 C .DRCH:}l0MB NAME GCC4llina / .RAGr6mm
- SCBlack 4 DATE 11/P/97 li 11/ M 97 11/ v/97 0FFICIAL RECORD COPY l
-