Text
e
. mv Public Service Electric and Ga?
C p1pany C:rbin A. McNeill, Jr.
Public Service Electnc and Gas Company P.O. Box 236, Hancocks Bridge.NJ 08038 609 339-4800
%ce President -
Nuclear April 8, 1986 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda, Maryland 20814 Attention:
Ms. Elinor Adensam, Director Project Directorate 3 Division of BWR Licensing
Dear Ms. Adensam:
INITIAL CRITICALITY CLARIFICATION HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Public Service Electric and Gas Company (PSE&G) requested an exemption in accordance with the requirements of 10CFR50.12 for the deferral of completion of the Standby Diesel Generator (D) and the Traversing Incore-Probe System until prior to initial criticality in a letter from C.A. McNeill (PSE&G) to E. Adensam (NRC) dated February 25, 1986.
Initial criticality in this application is defined as the first criticality achieved with the reactor vessel head installed, bolts fully tensioned and the reactor in Operational Condition 2 as defined by Hope Creek Technical Specifications.
PSE&G notes that this application of initial criticality does not pertain to Shutdown Demonstration tests performed during open vessel conditions in Operational Condition 5 as per the provisions of Technical Specification 3.10.3.
In the event there are any questions in this regard, do not hesitate to contact us.
Sincerely, 4100320 860408
~
ADOCK 05000354 l A
PDR g
11 o L
Director of Nuclear 2
4/8/86 Reactor Regulation C
D.H. Wagner USNRC Licensing Project Manager R.W.
Borchardt USNRC Senior Resident Inspector
.