Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203N384 + (02:04:32, 8 December 2024)
- ML20203N380 + (02:04:33, 8 December 2024)
- ML20203N377 + (02:04:34, 8 December 2024)
- ML20203N379 + (02:04:34, 8 December 2024)
- ML20203N375 + (02:04:35, 8 December 2024)
- IR 05000483/1984030 + (02:04:36, 8 December 2024)
- ML20203N373 + (02:04:36, 8 December 2024)
- ML20203N370 + (02:04:37, 8 December 2024)
- ML20203N368 + (02:04:38, 8 December 2024)
- ML20203N367 + (02:04:41, 8 December 2024)
- ML20203N365 + (02:04:42, 8 December 2024)
- ML20203N363 + (02:04:46, 8 December 2024)
- ML20203N364 + (02:04:46, 8 December 2024)
- ML20203N361 + (02:04:47, 8 December 2024)
- ML20203N355 + (02:04:53, 8 December 2024)
- ML20203N354 + (02:04:53, 8 December 2024)
- ML20203N352 + (02:04:54, 8 December 2024)
- ML20203N351 + (02:04:54, 8 December 2024)
- ML20203N349 + (02:04:55, 8 December 2024)
- ML20203N348 + (02:04:56, 8 December 2024)
- ML20203N347 + (02:04:56, 8 December 2024)
- ML20203N346 + (02:04:57, 8 December 2024)
- ML20203N344 + (02:04:58, 8 December 2024)
- ML20203N339 + (02:05:02, 8 December 2024)
- TXX-5014, Interim Deficiency Rept CP-86-16 Re Adverse Fire Effects on Instrument Tubing.Initially Reported on 860321.Evaluation Should Be Completed by 860930.Next Rept Will Be Submitted by 861022 + (02:05:02, 8 December 2024)
- ML20203N336 + (02:05:03, 8 December 2024)
- 05000324/LER-1986-019-01, :on 860722,discovered That Reactor Transversing in-core Probe Sys Channel B,8 & 10 Tubing Pathways Interchanged at Channel Indexing Mechanism.Caused by Misidentification of Tubing + (02:05:05, 8 December 2024)
- ML20203N332 + (02:05:06, 8 December 2024)
- ML20203N333 + (02:05:06, 8 December 2024)
- IR 05000424/1986018 + (02:07:16, 8 December 2024)
- ML20203N330 + (02:07:16, 8 December 2024)
- ML20203N328 + (02:07:17, 8 December 2024)
- ML20203N326 + (02:07:18, 8 December 2024)
- ML20203N324 + (02:07:19, 8 December 2024)
- ML20203N321 + (02:07:19, 8 December 2024)
- 05000409/LER-1986-009, :on 860403,old Retention Tank Pump Discharge Valve Failed Type C Leak Test.Cause Unknown.New Retention Tank Pump Discharge Valve Installed & Tested.No Leakage Measured Through New Valve + (02:07:21, 8 December 2024)
- ML20203N318 + (02:07:22, 8 December 2024)
- 05000251/LER-1986-008-01, :on 860329,intake Cooling Water Pump 4A Started.Caused by Const Activity in Area.Const Workers Instructed to Use Caution + (02:07:24, 8 December 2024)
- ML20203N316 + (02:07:25, 8 December 2024)
- TAC:61066 + (02:07:25, 8 December 2024)
- 05000409/LER-1986-008, :on 860403,spurious Low Reactor Water Level Signal Received.Caused by Mistakenly Deenergized Electric Distribution Panel During Troubleshooting of Instrumentation Problem.Sys Restored to Normal + (02:07:32, 8 December 2024)
- ML20203N311 + (02:07:33, 8 December 2024)
- 05000458/LER-1986-025, :on 860326,RHR Sys Isolation Occurred.Caused by Inadvertent Shorting of Bypass Jumper to Adjacent Test Lead During Performance of Surveillance Test Procedure.Sys Returned to Svc + (02:07:35, 8 December 2024)
- ML20203N307 + (02:07:36, 8 December 2024)
- ML20203N306 + (02:07:37, 8 December 2024)
- 05000339/LER-1986-004, :on 860314,while in Mode 6 (Refueling), Surveillance Requirements for Inspecting Accessible Snubbers Exceeded.Caused by Failure of Computer Program to Interpret Signal.Corrective Actions Underway + (02:07:39, 8 December 2024)
- ML20203N304 + (02:07:40, 8 December 2024)
- ML20203N302 + (02:07:45, 8 December 2024)
- ML20203N299 + (02:07:46, 8 December 2024)
- ML20203N301 + (02:07:46, 8 December 2024)
- 05000312/LER-1985-001-01, :on 850116,hydrogen Monitor Sys Containment Isolation Valves Open.Caused by Tagging Inconsistency, Inadequate Operating Procedure & Inadequate Panel Design. Procedure Revised & Cover Panel Added + (02:07:49, 8 December 2024)