ML20203N318
| ML20203N318 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 09/17/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20203N320 | List: |
| References | |
| NUDOCS 8609230312 | |
| Download: ML20203N318 (3) | |
See also: IR 05000424/1986018
Text
-
-
"
(
<
."
[
' SEP 17 M
i
r
-
Georgia Power Company
-
/ ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box 4545
y
Atlanta, GA 30302
(
Gentlemen:
w
y
SUBJECT:
NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 8,
STRUCTURAL STEEL - REPORT NO. 50-424/86-18
_
The NRC has completed a detailed review, inspection, and verification of the
-
subject Module which you submitted to the NRC on November 12, 1985.
Periodic
_
q
inspections were conducted at the Vogtle site and the resultant findings were
discussed with members of your staff at the conclusion of these inspections.
'
Technical reviews were conducted primarily in NRC Bethesda offices and the
y
findings from these reviews have also been discussed with your staff.
5
Areas contained in the module, which were reviewed, examined, and verified, are
1
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
h
review of your licensing commitments.
The results of Module No. 8 reviews and inspections are summarized into the
_
categories of deficiencies, inspector followup, and unresolved items.
Your
E
attention is invited to these matters which will be pursued during future licens-
j_
ing reviews and inspections.
F2
Based upon the NRC review and inspection of those activities identified in the
module, we have determined that the applicant's activity control program for the
c
g
implementation of design and construction of the Structural Steel for Category I
L
structures at Vogtle Unit No.1 is acceptable and complies with applicable
regulatory requirements with the exception of those items or areas identified in
&
.
the Report. This decision is based on information currently available to the
inspectors and reviewers. Should information subsequently become available which
1
was not considered during this review or which conflicts with earlier informa-
-
tion, it will be evaluated to determine what effect it may have on the above
conclusion.
- _
P
Should you have any questions concerning this letter, please contact us.
{
Sincerely,
W1W~%
"
Bbo92303h h h 24
gDR
ADO
'
J. Nelson Grace
-
[
Regional Administrator-
Enclosure:
{
Inspection Report No. 50-424/86-18
{
cc w/ encl:
(See page 2)
'?
~~EEOl
__.
c
'
SEP 171986 '
.
_
2
cc w/ encl:
d. P. O'Reilly, Senior Vice President
I.NuclearOperations
E. Conway, Senior Vice President &
Project Director
/.O. Foster,VicePresident, Project
S
j upport
VP. D. Rice, Vice President, Project
M. Engineering
H. Pinson, Vice President, Project
d. Construction
.T. Beckham, Vice President &
General Manager - Onerations
4. A. Thomas, Vice President,
Licensing
vd. S. Read, General Manager,
[.QualityAssurance
W. Hayes, Vogtle Quality
M.AssuranceManager
C. Ramsey, Manager -
Readiness Review
-Ka. B. Bockhold, General Manager,
Nuclear Operations
./.Gucwa, Manager,NuclearSafety
and Licensing
(A. H. Googe, Project
Construction Manager
gi!'. D. Groover, Quality
Assurance Site Manager -
Construction
d A. Bailey, Project Licensing
Manager
'
W . F. Trowbridge, Esq., Shaw,
Pittman,_Potts and Trowbridge
f.W. Churchill,Esq.,Shaw,
Pittman, Potts and Trowbridge
' I L. Blake, Jr., Esq., Shaw,
Pittman, Potts and Trowbridge
\\4.'E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
pd. G. Ledbetter, Commissioner,
N.DepartmentofHumanResources
H. Badger, Office of Planning
d.andBudget
Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
vD. C. Teper, Georgians Against
Nuclear Energy
(cc w/enci - cont'd see page 3)
,
- ---+ - - -
,
,-
,
- - - - - -,
, , .
,
y
y
-w
, , - - ,- ,,--
, . _ . - - - - - - - - - -
'-
___
'
- *
SEP 171996
Georgia Power Company
3
c w/enci cont'd)
. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
/Dr. O. H. Paris, Administrative Judge
Panel
Atomic Safety and Licensing Board
, Panel
\\E. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
i
I P. Garde, Citizens Clinic, Director
l
Government Accountability Project
. jec w/ encl:
W . Reis ELD
).M. Hill,IE
f . Miller, NRR
tA. Brach, EDO
% Sinkule, RII
4. Christnot, RII
pMRC Resident Inspector
,
Document Control Desk
State of Georgia
1
l
l
[
h
.
1: ~
k
RII
R
[
N
'
RII
RII
RI
RE
- f G1
Iake:hlm
AHerdt
M
h
G Walke/4 yttnst
son
,
J
6//g/86
6/g9/86 j 6
/86
MSinkule
V1Brawnlee
r
06/ /86
f/gb/86
06//S/86
0
/86
l,/
t
-16
09f11[6G
p
ELD
m
M6 tev
twX h.
TNovak
BGrimes
EChristehbury
9/g/86
9/gt/86
9/td86
-
- _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -