Forwards Insp Rept 50-424/86-18 of Readiness Review Module 8 Submitted on 851112.Applicant Activity Control Program for Implementation of Design & Const of Structural Steel for Category I Structures Acceptable
ML20203N318
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 09/17/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20203N320 List:
References
NUDOCS 8609230312
Download: ML20203N318 (3)


See also: IR 05000424/1986018

Text

-

-

"

(

<

."

[

' SEP 17 M

i

r

-

Georgia Power Company

-

/ ATTN: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

y

Atlanta, GA 30302

(

Gentlemen:

w

y

SUBJECT:

NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 8,

STRUCTURAL STEEL - REPORT NO. 50-424/86-18

_

The NRC has completed a detailed review, inspection, and verification of the

-

subject Module which you submitted to the NRC on November 12, 1985.

Periodic

_

q

inspections were conducted at the Vogtle site and the resultant findings were

discussed with members of your staff at the conclusion of these inspections.

'

Technical reviews were conducted primarily in NRC Bethesda offices and the

y

findings from these reviews have also been discussed with your staff.

5

Areas contained in the module, which were reviewed, examined, and verified, are

1

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

h

review of your licensing commitments.

The results of Module No. 8 reviews and inspections are summarized into the

_

categories of deficiencies, inspector followup, and unresolved items.

Your

E

attention is invited to these matters which will be pursued during future licens-

j_

ing reviews and inspections.

F2

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that the applicant's activity control program for the

c

g

implementation of design and construction of the Structural Steel for Category I

L

structures at Vogtle Unit No.1 is acceptable and complies with applicable

regulatory requirements with the exception of those items or areas identified in

&

.

the Report. This decision is based on information currently available to the

inspectors and reviewers. Should information subsequently become available which

1

was not considered during this review or which conflicts with earlier informa-

-

tion, it will be evaluated to determine what effect it may have on the above

conclusion.

_

P

Should you have any questions concerning this letter, please contact us.

{

Sincerely,

W1W~%

"

Bbo92303h h h 24

gDR

ADO

LL

'

PDR

J. Nelson Grace

-

[

Regional Administrator-

Enclosure:

{

Inspection Report No. 50-424/86-18

{

cc w/ encl:

(See page 2)

'?

~~EEOl

__.

c

'

SEP 171986 '

.

_

2

cc w/ encl:

d. P. O'Reilly, Senior Vice President

I.NuclearOperations

E. Conway, Senior Vice President &

Project Director

/.O. Foster,VicePresident, Project

S

j upport

VP. D. Rice, Vice President, Project

M. Engineering

H. Pinson, Vice President, Project

d. Construction

.T. Beckham, Vice President &

General Manager - Onerations

4. A. Thomas, Vice President,

Licensing

vd. S. Read, General Manager,

[.QualityAssurance

W. Hayes, Vogtle Quality

M.AssuranceManager

C. Ramsey, Manager -

Readiness Review

-Ka. B. Bockhold, General Manager,

Nuclear Operations

./.Gucwa, Manager,NuclearSafety

and Licensing

(A. H. Googe, Project

Construction Manager

gi!'. D. Groover, Quality

Assurance Site Manager -

Construction

d A. Bailey, Project Licensing

Manager

'

W . F. Trowbridge, Esq., Shaw,

Pittman,_Potts and Trowbridge

f.W. Churchill,Esq.,Shaw,

Pittman, Potts and Trowbridge

' I L. Blake, Jr., Esq., Shaw,

Pittman, Potts and Trowbridge

\\4.'E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

pd. G. Ledbetter, Commissioner,

N.DepartmentofHumanResources

H. Badger, Office of Planning

d.andBudget

Kirkland, III, Counsel,

Office of the Consumer's Utility

Council

vD. C. Teper, Georgians Against

Nuclear Energy

(cc w/enci - cont'd see page 3)

,

- ---+ - - -

,

,-

,

- - - - - -,

, , .

,

y

y

-w

, , - - ,- ,,--

, . _ . - - - - - - - - - -

'-

___

'

  • *

SEP 171996

Georgia Power Company

3

c w/enci cont'd)

. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

/Dr. O. H. Paris, Administrative Judge

Panel

Atomic Safety and Licensing Board

, Panel

\\E. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

i

I P. Garde, Citizens Clinic, Director

l

Government Accountability Project

. jec w/ encl:

W . Reis ELD

).M. Hill,IE

f . Miller, NRR

tA. Brach, EDO

% Sinkule, RII

4. Christnot, RII

pMRC Resident Inspector

,

Document Control Desk

State of Georgia

1

l

l

[

h

.

1: ~

k

RII

R

[

N

'

RII

RII

RI

RE

f G1

Iake:hlm

AHerdt

M

h

G Walke/4 yttnst

son

,

J

6//g/86

6/g9/86 j 6

/86

MSinkule

V1Brawnlee

r

06/ /86

f/gb/86

06//S/86

0

/86

l,/

t

-16

09f11[6G

NRR

IE

p

ELD

m

M6 tev

twX h.

TNovak

BGrimes

EChristehbury

9/g/86

9/gt/86

9/td86

-

- _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -