Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-89-315, Semiannual Radioactive Effluent Release Rept Jan-June 1989 + (15:24:17, 7 January 2025)
- ML17347B295 + (15:24:18, 7 January 2025)
- ML17347B293 + (15:24:19, 7 January 2025)
- 05000251/LER-1988-011-01, :on 880816,damage Occurred to Property in Excess of $2,000 Due to Spent Fuel Pool Leakage.Caused by Pump Failure Causing Vent Valve to Vibrate Open.Floor Drain Sys Cleaned.Pump & Oiler Repaired & Inspected + (15:24:21, 7 January 2025)
- ML17347B291 + (15:24:22, 7 January 2025)
- L-89-314, Forwards Reactor Containment Bldg Integrated Leakage Rate Test,Types A,B & C Periodic Test + (15:24:23, 7 January 2025)
- ML17347B288 + (15:24:25, 7 January 2025)
- L-89-311, Forwards Summary Rept of Integrated Schedule Generated for Jul 1989 + (15:24:26, 7 January 2025)
- L-89-306, Documents Improvements Made in Util Operator Training Program for Plant,Particularly Requalification Training & Results Achieved + (15:24:28, 7 January 2025)
- ML17347B285 + (15:24:29, 7 January 2025)
- L-89-312, Forwards Change a to Rev 1 to JNS-PTN-200, Second 10-Yr Inservice Insp Interval Inservice Testing Program for Pumps & Valves. Current Program Being Reviewed Against Requirements of Generic Ltr 89-04 + (15:24:30, 7 January 2025)
- ML17347B282 + (15:24:32, 7 January 2025)
- ML17347B279 + (15:24:33, 7 January 2025)
- L-89-292, Documents Request & Justification Re Discretionary Enforcement to Extend out-of-svc Time for Containment Spray Pump 4A.Containment Spray Pump Refurbished During Last Unit 4 Refueling Outage & Testing Showed Acceptable Performance + (15:24:34, 7 January 2025)
- L-89-309, Cycle XII Startup Rept + (15:24:36, 7 January 2025)
- ML17347B276 + (15:24:38, 7 January 2025)
- ML17347B273 + (15:24:40, 7 January 2025)
- ML17347B274 + (15:24:40, 7 January 2025)
- L-89-290, Forwards Monthly Operating Repts for Jul 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2 & Corrected Monthly Operating Repts for June 1989 for Turkey Point Units 3 & 4 + (15:24:41, 7 January 2025)
- 05000251/LER-1989-007-01, :on 890713,determined That Required Visual Exam for Leakage Missed.Caused by Cognizant Field Engineer Personnel Error.Visual Exam Performed within 1 Hr.No Leakage Detected.Personnel Counseled + (15:24:43, 7 January 2025)
- L-89-301, Special Rept:On 890706-21,breached Fire Barriers & Other Fire Protection Sys Impairments Open Longer than Tech Spec Limits + (15:24:44, 7 January 2025)
- 05000251/LER-1989-006-01, :on 890713,intake Cooling Water Flow to Component Cooling Water HXs Degraded Below Design Basis Flow Rate for 15 Minutes.Caused by Failure of Header Isolation Valve 4-50-308.Valve Replaced & Pin Removed + (15:24:47, 7 January 2025)
- L-89-283, Responds to Violations Noted in Insp Repts 50-250/89-24 & 50-251/89-24.Corrective Actions:New Backfit Const Procedure Developed to Improve Control of Process Sheets & Installation Lists for Lifted Leads + (15:24:48, 7 January 2025)
- L-89-288, Forwards Jul 1989 Progress Summary of Select Sys Assessment, Per NRC 860812 Order + (15:24:50, 7 January 2025)
- ML17347B265 + (15:24:50, 7 January 2025)
- ML17347B263 + (15:24:53, 7 January 2025)
- L-89-278, Suppls Response to NRC Ltr Re Violations Noted in Maint Team Insp Repts 50-250/88-32 & 50-251/88-32.Action Taken to Improve Ability to Analyze & Correct Root Causes of Equipment Failures Addressed + (15:24:54, 7 January 2025)
- ML17347B262 + (15:24:54, 7 January 2025)
- L-89-296, Responds to Generic Ltr 89-06, Task Action Plan Item I.D.2,SPDS. Only Actions Remaining to Be Completed Are Item Pertaining to NUREG-0737,Suppl 1 Requirement for Incorporating Human Factors Engineering Principles + (15:24:56, 7 January 2025)
- L-89-256, Special Rept:On 881203,spent Fuel Pit Exhaust high-range Noble Gas Monitor Inoperable for Greater than 7 Days.Caused by Extensive Nature of Calibr Performed & Repairs to Sample Sys Piping.Monitor Returned to Operable Status on 890318 + (15:24:58, 7 January 2025)
- ML17347B258 + (15:25:00, 7 January 2025)
- ML17347B257 + (15:25:01, 7 January 2025)
- ML17347B255 + (15:25:02, 7 January 2025)
- ML17347B253 + (15:25:03, 7 January 2025)
- 05000251/LER-1989-005-02, :on 890628,4A Accumulator Level Tech Spec Not Met Due to Wrong Redundant Level Transmitter.Caused by Personnel Error of non-licensed Operator.Transmitter Replaced W/Spare + (15:25:05, 7 January 2025)
- ML17347B251 + (15:25:06, 7 January 2025)
- ML17347B249 + (15:25:10, 7 January 2025)
- IR 05000250/1989022 + (15:25:11, 7 January 2025)
- ML17347B246 + (15:25:13, 7 January 2025)
- L-89-285, Special Rept:On 890613-30,breached Fire Barriers & Other Fire Protection Sys Impairments Not Returned to Functional Status within 7 Days,Per Tech Spec 3.14.5.b.Impairments Being Evaluated & Work on Corrections in Progress + (15:25:14, 7 January 2025)
- IR 05000250/1989031 + (15:25:17, 7 January 2025)
- ML17347B231 + (15:25:18, 7 January 2025)
- L-89-275, Discusses Resolution of Fire Induced Spurious Closure of Vol Control Tank Outlet Valve Reported in 890519 Ler.Fire Watches Will Be Discontinued 30 Days from Ltr Date + (15:25:19, 7 January 2025)
- IR 05000250/1989028 + (15:25:22, 7 January 2025)
- ML17347B212 + (15:25:23, 7 January 2025)
- L-89-269, Advises That Util Search of Labor Contracts Did Not Identify Any Agreements Between Util & Employees Containing Clauses Restricting Employees,Or Former Employees,From Communicating Safety Issues to Nrc,Per Stello + (15:25:24, 7 January 2025)
- ML17347B209 + (15:25:25, 7 January 2025)
- ML17347B206 + (15:25:26, 7 January 2025)
- L-89-266, Documents Util 890718 Request & Justification for Discretionary Enforcement Re Isolating Intake Cooling Water Sys Header to Allow Cleaning of Intake Cooling Water Basket Strainer + (15:25:27, 7 January 2025)
- L-89-265, Responds to Generic Ltr 89-08, Erosion/Corrosion Induced Pipe Wall Thinning. Upgraded Erosion/Corrosion Std,Meeting NUMARC Guidelines,Will Be in Place by 900101 + (15:25:29, 7 January 2025)
- 05000250/LER-1989-010, :on 890616,breaker Tripped Causing Power Loss to Rack 66 & Automatic Isolation of Containment & Control Room Ventilation Sys.Caused by Overload of Breaker 3P08-19. Clearance Tag Taped Across Ac Outlet + (15:25:31, 7 January 2025)