ML17347B274

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Repts for June 1989 for Turkey Point Units 3 & 4
ML17347B274
Person / Time
Site: Turkey Point, 05000000
Issue date: 06/30/1989
From: Bonett D
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17347B272 List:
References
NUDOCS 8908240045
Download: ML17347B274 (4)


Text

UNIT SHUTDOWNS AND POWER REDUCTIONS

  • CORRECTED COPY*

REPORT MONTH June 1989 DOCKET NO.

1

~T DATE Jul 17 1989

'OMPLETED By D. M. Bonett TELEPHONE 407 694-4432 X DCO XO CO h) 274 QO O4 RC1 0$

  • vl'8 OO 0$

00~

Uh)Ql AOl0 05 Date Type~

890504 S

(Hours) 568.8 Reasons Method of Shutting Down Reactor Ucensee Event Report 4 System SF Component Codes INSTRU Cause a Coffecbve Actionto Prevent Recurrence Unit 3 shutdown was further extended for the containment pressure switch repair, A RHR pump repair and HOV-863A repair.

Full power. operation delayed for 30$

chemistry hold.

06 890626 F

0.0 Full power operation was delayed for the adjustment of the governor oil system.

F Forced S Scheduled Reason A - Equipment Failure(Exphin)

B - Maintenance orTest C - Refue%ng D - Reguhtory Restrhthn E - Operator Training 8 License Examinathn F - Administrative G - Operathnal Error (Exphin)

H - Other (Exphln)

Method 1-Manual 2 - Manual Scram 3 - Automath Scram 4 - Contiriued 5 - Load Reducthn 9 - Other(Exphin) 4 ExhibitG-lnstsucthns forPreparation ofData Entry Scheets Ucensee Event Report(LER) Re (NUREG4161).

5 Exhibit 1-Same Source

'I t

~

e

< J

UNIT SHUTDOWNS AND POWER REDUCTIONS

  • CORRECTED COPY*

REPORT MONTH

June, 1989 DOCKET NO.

50-251

~Ti I

DATE July 17, 1989 COMPLETED BY D. N. Bonett TELEPHONE (407) 694-4432 Date 13 880920 14 890612 15 890617 Type'Hours) 252.4 99.8 26.2 Reason2 Method of Shutting Dove Reactor Ucensee Event Report ¹ System Component Code~

Code~

RC FUELXX HA illRBIN HA GENERA Cause S Corrective Actionto Prevent Recurrence Unit f4 remained shutdown for refueling and scheduled tttaintenance.

lfhile returning to power the unit was held for flux mapping.

The unit was shutdown for turbine overspeed test.

The outage was extended to repair a turbine generator steattt leak and RTD bypass loop valves.

Full power operation was delayed for secondary chemistry and flux mapping.

The unit was shutdown to repair ari exciter leak.

Full power operation was delayed for secondary chemistry, flux mapping and Nuclear Instrment-ation c'alibration.

F Forced S Scheduhd Reason A - Equipment Falure(Exphln)

B - Maintenance orTest C - Refueling D - Reguhtory Restrfcthn E - Operator Training &Ucense Examlnathn F - Administrative G - Operathnal Error (Explain)

H - Other (Exphln)

Method 1-Manual 2 - Manual Scram 3 - Automath Scram

- Continued 5-Load Reducthn 9 - Other(Exphln)

ExhibitG-Instructions forPreparathn of Data Entry Scheets Ucensee Event Report(LER) Re (NUREG4161)

~

Exhibit 1-Same Source

I+i r

0 f

Ik