Monthly Operating Repts for Jul 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2
ML17347B273
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 07/31/1989
From: Bonett D
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17347B272 List:
References
NUDOCS 8908240043
Download: ML17347B273 (31)


Text

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3

DATE Au st 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 MONTH Ju1 1989 DAY AVERAGE DAILY (MWe-Net 7/ 1/89 7/ 2/89 7/ 3/89 7/ 4/89 7/ 5/89 7/ 6/89 7/'/89'/ 8/89 7/ 9/89 7/10/89 7/11/89 7/12/89 7/13/89 7/14/89 7/15/89 7/16/89 7/17/89 7/18/89 7/19/89 7/20/89 7/21/89 7/22/89 7/23/89 7/24/89 7/25/89'/26/89 7/27/89 7/28/89 7/29/89 7/38/89 7/31/89 POWER LEVEL

)

671 667 666 666 665 666 665 668 665 662 661 662 664 666 666 662 662 664 667 668 669 675 675 673 677 673 670 634 361 640 659 S90S240043 890815 PDR ADOCK 05000250 PDC

E A

~

OPERATING DATA REF'ORT OPERATING STATUS DOCKET HO 50 250 DATE 8/15/8'9 COMPLETED BY D, M,

BOHETT TELEPHONE 407/694/4432 1,

UNXT NAME: TURKEY POINT UHXT 3 2+

REPORTXNG PERIOD i JULY r 1989 3+

LICEHSED THERM*L POWER (MWT) +

2200 4e NAMEPLATE RATING (GROSS MWE) i 760 5+

DESIGN ELECTRICAL RATING (NET MWE) t 693 6

MAXXMUM DEPENDABLE CAPACITY (GROSS MWE)'99 7

MAXXMUM DEPEND*BLE CAPACITY (NET MWE)'66 8 i IF CH'ANGES OCCUR IN CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7) 8IHCE LAST REPORT r GXVE REASOHS

'OWER LEVEL TO WHICH RESTRICTED r XF *NY

< NET MWE)

'ie o REASOHS FOR RESTRICTIOHS t IF AHYe MONTHLY

-YTD-CUMULATXVE ll+ HOURS IH REF'ORT PERIOD'2 i

NUMBER OF HOURS RE*CTOR W*S CRITICAL 13, REACTOR RESERVE SHUTDOWN HOURS 14+

HOURS GENERATOR ON-LINE 15'NIT RESERVE SHUTDOWN HOURS 16+

GROSS THERMAL ENERGY GENERATED (MWH) 17'ROSS ELECTRXCAL ENERGY GENERATED (MWH) 18+

NET ELECTRICAL ENERGY GENERATED (MWH) 19+

UHXT SERVICE FACTOR 20 i UNXT AVAILABILITYFACTOR 21+

CAPACITY FACTOR (USXNG MDC NET) 22'APACITY FACTOR (USING DER NET) 23'NXT FORCED OUTAGE RATE 24+

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 744+0 ego 744,e OiO 1611920 511720 487384 100+0 100+0 98+4 94i5 0+0 5e87 2142+5 OiO 2049+6 OiO 4253837 1367960 1273844 40i3 40i3 37+6 36' 3317 146000o6 95526+2 844+4 94206+9 12ii8 195447586 62630486 59204388 64+5 64i6 62 '

58+5 13' 25 IF SHUT DOWN AT END OF REPORT PERIODS ESTXMATED DATE OF STARTUP'

0 g,

~,

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Jul 1989 DOCKET NO.

UNIT NAME Turke Point 0'3 DATE Au ust 15, 1989 COMPLETEDBY D.

M. Bonett TELEPHONE 407 694 4432 No.

Date Type'uration (Kours)

Reason~

Method of Shutting Down Reactor Ucensee Event Reports System Code4 Component Codes Cause 8 Corrective Actionto Prevent Recurrence 07 890728 0.0 N/A MA TURBIN Unit 3 reduced power to perform a

turbine valve test.

Full power operation was resumed.

F Forced S Scheduled Reason A - Equipment Failure(Explain) 8 - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain)

ExhibitG-Instructions forPreparation ofData EntryScheetsLicensee Event Report(LER) File (NUREG4161)

Exhibit1-Same Source

0

'0 I

SUMMARY

OF OPERATING EXPERIENCE'OCKET NO. 50-250

,UNIT Turke Point 3

DATE'u st 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 REPORT MONTH iful 1989 Unit 3 reduced. power, to perform a turbine valve test.

Full power operation was resumed.

Oi l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4

DATE Au st 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 MONTH Zul 1989 DAY AVERAGE DAILY POWER (MWe-Net) 7/ 1/89 7/ 2/89 7/ 3/8'9 7/ 4/89 7/ 5/89 7/ 6/89 7/ 7/89 7/ 8/89 7/

9/89'/10/89

'7/ii/89 7/12/89 7/13/89 7/14/89 7/15/89 7/16/89 7/17/89 7/18/89 7/19/89 7/20/89 7/21/89 7/22/89 7/23/89 7/24/89 7/25/89 7/26/89 7/27/89 7/28/89 7/29/89 7/30/89 7/31/89 647 660 658 666 666 667 670 664 667 667 665 528 141 601 666 663 114

-14

-14

-13

-19 278 644 665'65 663 666 673 669 670 67e

OPERATING STATUS OPERATING DATA REPORT DOCKET NO 5e 251 DATE 8/15/89 COMPLETED BY D+

Mi BONETT TELEPHONE 407/694/4432 1 i UNIT NAME: TURKEY POINT UNIT 2 i REPORTING PERIOD'ULYr 1989 3+

LICENSED THERM*L POWER, (MWT) 5 2200 4+

NAMEPLATE RATING <GROSS MWE) t

,760 5+

DESIGN ELECTRICAL RATING (NET MWE) o 693 6+

M*XXMUM DEPENDABLE CAPACXTY (GROSS MWE)+

699 7i MAXIMUM DEPENDABLE CAPACXTY (NET MWE) i 666 8

XF CHANGES OCCUR XN CAPACXTY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT ~

GIVE REASONS+

9+

POWER LEVEL TO 'WHICH RESTRICTED v IF *NY

< NET MWE) 10 i RE*SONS.

FOR RESTRICTIONS r XF ANY+

MONTHLY

-YTD-CUMULATIVE 11'OURS XN REPORT PERIOD'2'UMBER OF HOURS REACTOR WAS CRITICAL 13i REACTOR RESERVE SHUTDOWN HOURS 14 i HOURS GENERATOR ON-LINE

'i5+ UNIT RESERVE SHUTDOWN HOURS 16+

GROSS THERMAL ENERGY GENERATED (MWH) 17'ROSS ELECTRICAL ENERGY GENER*TED (MWH) 18, NET ELECTRXCAL ENERGY GENERATED (MWH) 19+

UNIT SERVICE FACTOR 20 i UNIT AVAILABILITYFACTOR 2ii CAPACITY FACTOR (USING MDC NET) 22'APACITY F*CTOR (USING DER NET) 23 UNXT FORCED OUTAGE R*TE 24, SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS :

744 645+7 OiO 621i5 0+0 1313314 411090 388961 83o5 83+5 78+5 75i4 16+5 5087 1207+6 eiO 963+2 OoO 1728900 528950 472406 18+9 18+9 13o9 13o4 20 i 5 139732+0 91444i2 166+6 88157i2 32+1 185811320 59277752 56055665 63+1 63ii hio5 57'iii4 25 IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE OF STARTUP'

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.

50-251 UNn NAME Turke Point ¹4.

DATE Au ust 15 1989 COMPLETEDBy 0.

H. Bonett TELEPHONE 407 694-4432 Date Type'uration (Hours)

Reason~

Method of Shutting Down Reactor Licensee Event Reportà System Code4 Component Codes Cause 8 Corrective Actionto Prevent Recurrence 17 890712 0.0 N/A MA VALVEX The unit reduced power to perform a turbine valve test and to backwash the intake and'urbine plant cooling water strainers.

18 890713 1.0 N/A HA VALVEX The unit was shutdown to repair a

turbine stop valve problem,iifbich';:Mas identified during turbine valve testing.

Return to full power was delayed for secondary chemistry control.

19 890717 121. 5 251-89-06 WE VALVEX Unit 4 was taken off-line to repair the intake cooling water valve 308.

Full power operation was delayed for secondary chemistry.

F Forced S Scheduled Reaso'n A - Equipment Failure(Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain) 4 ExhibitG-Instructions forPreparation ofData EntryScheetsUcensee Event Report (LER)File (NUREG4161) 5 Exhibit 1-Same Source

0

'I I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO'. 50-251 UNIT Turke Point 4

DATE Au st 15 1989 COMPLETED BY D'. M. Bonett TELEPHONE 407 694-4432 REPORT MONTH Zul 1989 The unit reduced'ower to perform a turbine valve test and to backwash the intake and turbine plant cooling water strainers.

Unit 4 was shutdown to repair a turbine stop valve problem.

Return to full power was delayed for secondary chemistry.control.

The unit, was taken off line to repair Intake Cooli;ng Water Valve 308.

Full power operation

.was delayed for secondary chemistry.

ig)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-335 UNIT, St. Lucie 1

DATE Au st 15 1989 COMPLETED BY D. M. Bonett TELEPHONE'07 694-4432 MONTH DAY AVERAGE Zul 1989 DAILY POWER LEVELI (MWe-Net) 7/ 1/89 7/ 2/89 7/

3/89'/4/89 7/ 5/89 7/ 6/89 7,/ 7/89 7/ 8/89 7/ 9/89 7/10/89 7/11/89 7/12/89 7/13/89 7/14/89 7/15/89 7/16/89 7/17/89 7/1'8/89 7/19/89 7/28/89

,7/21/89 7/22/89 7/23/89'/24/89 7/25/89 7/26/89 7/27/89

.7/28/89 7/29/89 7/38/89 7/31/89

-6

-4'4

-4

-4

-4

-4

-5

'-8

-10

-14

-29

-18 587 647 710 708 732 870 869 878 865 860 864 868 868 864

,C t

OPERATING STATUS OPERATING DATA REPORT DOCKET NO 5e 335 DATE 8/15/89 COMPt ETEO BY O,.

M, BONETT TELEPHONE 407/694/4432 1+

UNIT NAME o ST o LUCIE UNIT 1 2,

REPORTING PERIOD:

JULY. 1989 3

LICENSED THERMAL POWER (MHT):

27ee 4i NAMEPLATE RATXNG (GROSS MWE)t 850 5+

DESXGN ELECTRIC*L RATING (NET MME) e 830 6+

MAXIMUM DEPEND*BLE CAPACITY (GROSS MME) i 872 7+

MAXIMUM DEPENDABLE C*PACXTY (NET MME):

839 8+ IF CHANGES OCCUR IN CAP*CITY RATINGS (ITEMS NUMBER 3'HROUGH 7)

SINCE LAST REPORT r GIVE REASONS+

9+

POWER LEVEL TO HHICH RESTRXCTEDr IF *NY (NET MHE) 10+

RE*SONS FOR RESTRICTIONSr XF ANY+

MONTHLY

-YTD-CUMULATIVE il+ HOURS IN REPORT PERIOD o 12'UMBER OF HOURS REACTOR HAS CRITICAL 13'EACTOR RESERVE SHUTDOHN HOURS 14+

HOURS GENERATOR ON-LINE 15 UNIT RESERVE SHUTDOHN HOURS 16'ROSS THERMAL ENERGY GFNERATED

<MHH) 17+

GROSS ELECTRICAL ENERGY GENERATED

<MHH) 18+

NET ELECTRICAL ENERGY GENERATED (MHH) 19+

UNIT SERVICE FACTOR 28 i UNIT AVAILABILXTYFACTOR 21+

CAP*CTTY FACTOR (USXNG MDC NET) 22'APACITY FACTOR (USING DER NET) 23.

UNIT FORCED OUTAGE R*TE 24+

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 744 345oO eoO 338il 0+0 849129 283710 264949 45 i4 45+4 42+4 42+9 Oi0 5087 4636+6 0+0 4629+2 0+0 12326992 4140628 3928122 e

91+0 92+0 93+0 OiO ii0543iO 83735+2 205i3 83088i4 39+3 213348179 70259215 66379652 75tl 75+1 74+6 73i4 3o6 25'F SHUT 'DOWN AT END OF REPORT PERXOD.r ESTIMATED D*TE OF STARTUP+

UNITSHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Jul 1989 DOCKET NO.

UNiT NAME St.

Lucie ¹1 DATF Au ust 15, 1989 COMPLETED BY o

M. Bonett

~D7 6

Date Type Duration (Hours)

Reason~

Method of Shutting Down Reactor Ucensee Event Report iti System Code4 Component Code 5 Cause &Corrective Actionto Prevent Recurrence 02 890628 405. 9 B

N/A CC HTEXCH Unit 1 downpowered and came offline for steam generator tube plug repair and replacement.

(Re:

NRC Bulletin 89-01).

Return to full power operation was delayed for minor repairs and calibrations..

F Forced S Scheduled 2

Reason A - Equipment Failure (Explain)

B - Maintenance orTest C - Refueling D - Regulatory Restriction E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)

ExhibitG-Instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NUREG4161)

Exhibit1-Same Source 091587

4>

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT St. tucie 1

DATE Au st 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 REPORT MONTH Zul 1989 Unit 1

downpowered and'ame offline for steam generator tube plugging repair and replacement.

Return to full power operation was delayed for minor repairs.

and calibrations.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report period.

AVERAGE DAILY UNIT POWER DOCKET NO. 50-389 UNIT St. Lucie 2

DATE Au st 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 MONTH Zul 1989 DAY AVERAGE DAlLY POWER LEVEL (MWe-Net) 7/ 1/89 7/ 2/89 7/'/89 7/ 4/89 7/ 5/89 7/ 6/89 7/ 7/89 7/ 8/89 7/ 9/89 7/10/89 7/11/89 7/12/89 7/13/89 7/14/89 7/15/89 7/16/89 7/17/89 7/18/89 7/19/89 7/20/89 7/21/89 7/22/89 7/23/89 7/24/89 7/25/89 7/26/89 7/27/89 7/28/89 7/29/89 7/30/89 7/31/89 855 857 857 857 857 855 856 859 858 857 856 855 859 859 855 857 856 857 856

'855 855

'855 854 851 841 849 847 853 855 856 854

4t V

OPERATING STATUS OPERATIHG DAT* REPORT DOCKET HQ 50 389 DATE 8/15/89 COMPLETED BY D.

M,. BOHETT TELEPHONE 407/694/4432 1,

UNIT H*ME; ST, LUCIE UNIT 2 2+

REPORTIHG PERIOD'ULY~

1989 3+

LICEHSED THERMAL POWER (MWT) +

2700 4 o HAMEPLATE RATIHG (GROSS MWE) +

5o DESXGH ELECTRICAL R*TXHG (NET MWE) +

830 6i M*XIMUM DEPENDABLE CAPACITY (GROSS MWE) i 882 7+

MAXXMUM DEPENDABLE CAPACITY (HET MWE)o 839 8

IF CH*NGES OCCUR XN CAP*CXTY R*TINGS (ITEMS NUMBER 3 THROUGH 7)

SIHCE LAST REPORT 1 GIVE REASOHS 9i POWER LEVEL 'TO WHICH'ESTRICTEDr IF *HY (HET MWE) ie i. RE*SOHS FOR RESTRICTIONS r IF ANY+

MONTHLY

-YTD-CUMULATIVE 11 HOURS IN REPORT PERIOD'2+

HUMBER 'OF HOURS REACTOR WAS 'CRITICAL 13.

REACTOR RFSERVE SHUTDOWN HOURS 14'OURS GENER*TOR OH-LXNE L5i UNIT RESERVE SHUTDOWN HOURS L6i GROSS THERMAL ENERGY GENERATED (MWH)

L7i GROSS ELECTRICAL ENERGY GEHERATED (MWH)

L8.

NET ELECTRICAL ENERGY GENERATED (MWH)

L9+

UNXT SERVICE FACTOR

'Oi UNIT AVAILABILITYFACTOR 21+

CAPACITY FACTOR (USXNG MDC NET) 22+

CAPACITY F*CTOR (USXNG DER HET) 23, UNIT FORCED 'OUTAGE RATE 24+

SHUTDQWHS SCHEDULED OVER NEXT 6 MONTHS 744 744iO eie 744+0 Owe 2008521 670808 636095 100+0 100+0 iel+9 103' Owe 5087 3046+0 0+0 2961+4 0+0 7803981 2605610 2455420 58i2 58' 57 t 5 58+2 1+2 52440+0 44588+0 eiO 43783+0 OiO 114287651 38102450 36030313 83o5 83+5 83i7 83' 5+5 25 o IF SHUT DOWN *T EHD OF REF'ORT PERIOD ~

ESTIMATED D*TE OF STARTUP '

4>

0 Ii

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH DOCKET NO.

50-389 UNITNAME St-LU DATE Au ust 15 1989 COMPLETED BY D.

M. Bonett

~Ã94-<<>>

Date Type'uration (Hours)

Reason~

Method of Shutting

Down, Reactor" Licensee Event Report¹ System Code4 Component Codes Cause &Corrective Actionto Prevent Recurrence Unit 2 had no shutdowns or significant power reductions.

F Forced S Scheduled Reason A - Equipment Failure (Explain)

B - Maintenance orTest C - Refuelirig D - Regulatory Restriction.

E - Operator Training &Ucense Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other(Explain) 4 ExhibitG-instructions forPreparation ofData Entry Scheets Ucensee Event Report(LER) File (NUREG4161) 5 Exhibit 1-Same Source

ii I

~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO., 50-389 UNIT St. Lucie 2

DATE Au st 15 1989 COMPLETED.BY D. M. Bonett TELEPHONE 407 '94-4'432 REPORT MONTH Zul 1989'nit 2 had no shutdowns or significant power reductions.

In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to PORV or safety valves during the report period.