ML17347B206
| ML17347B206 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 07/26/1989 |
| From: | Stello V NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Fascell D HOUSE OF REP. |
| Shared Package | |
| ML17347B208 | List: |
| References | |
| NUDOCS 8908070048 | |
| Download: ML17347B206 (5) | |
Text
~ ~,
~ ~
g
~
gP,'rl Rfgy
~
+~
~o nO 4~
~O
>>>>*++
yy'NITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555
":DO Princioal Correspondence Control y
FRQN:
DUE: 07/25/89 EDO CONTROL: 000460>
DOC DT: 07/06/8'V FINAL REPLY:
RFP.
DANTE 8
~
FASCEL.L.
TO:
FOR SIGNATURE QF:
III: GRN CRC NO: 85'-06>9
'EXECUTIVE DIRECTOR DESC:
ROUTING:
EBNETER. RII DATE: 07/XX/8~)
ASS IGNFD TO:
CONTACT."
NRR SPECIAL 1NSTRUCT IONS OR REMARKS:
NURLEY NRR RECEIVED:
JULY ll, 1989 ACTION':
<DRY;VARGA NRR ROUTING:
HURLEY/SNIEZEK HIRAGLIA PARTLOW CRUTCHFIELD GILLESPIE HOSSBURG xr(0N DUE IO NRR DIREOTOR'S OFFICE 0
I.WYk y
1 ENCLOSES LETTER FRON EVA SIEGEL EXPRESSING L",QNCERNS ABOUT SAFETY QF TURKEY POINT
I
,,'>/p I'
c f~
W%
PAPER NUMBER:
ACTION OFFICE:
AUTHOR AFFILIATION:
LETTER DATE
SUBJECT:
ACTION:
DISTRIBUTION:
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET CRC-89-0639 LOGGING DATE: Jul 10 89 EDO D.B. Fascell-Cons Ref U.S.
HOUSE OF REPRESENTATIVES Jul 6 89 FILE CODE:
IDLER-5 Turkey Point Safety problems at the Turkey Point plant Direct Reply OCA to Ack SPECIAL HANDLING: None NOTES DATE DUE:
Eva Siegel Jul 21 89 SIGNATURE:
AFFILIATION:
DATE SIGNED:
gee'd Off. EDO Date
%ma E30-004603
July 26, 1989 The Honorable Dante B. Fascell United States House of Representatives Mashington, D.C.
20515 Dear Congressman Fascell:
This letter is in response to your letter of July 6, 1989, regarding the correspondence you received from Eva Siegel.
Earlier this year Eva Siegel also wrote to Senator Bob Graham about the Turkey Point plant.
Our response to Senator Graham's request for information was dated June 8, 1989, and is enclosed for your information.
I believe that letter summarizes the status of the Turkey Point plant at this time.
Since that letter was written, both reactor units at Turkey Point restarted in June and have operated to date without incident.
If I can be of further assistance to you, please do not hesitate to contact me.
Sincerely,
Enclosure:
Ltr to Senator Bob Graham of 6/8/89 cc:
Senator Bob Graham DISTRIBUTION (IQ-2M/2Bl)
NRC PDR w/cy of incoming Local PDR w/cy of incoming EDO 80004603 EDO r/f T.
l1ur ley/J.
Sniezek J. Part low F. Hiraglia PDII-2 Rdg. w/cy of incoming S.
Varga G. Lainas J. Taylor Origmal Signed By
)ames M. Taylor
~
~
~
~
~
Victor Stello, Jr.
Executive Director for Operations OGC GPA/CA SECY (89-0639)
V. Stello D. Mossburg, (EDO 80004603)
Edison w/cy of incoming F. Gillespie D. Hiller S. Ebneter, RII H.
Berkow D, Crutchfjeld j)p l 0/
89 LGREEN TICKET 0004603 j
- DNilier GEdison: bid HBerkow 07/17/89 07/
/89 07/
/89 07/17/89 D:DRPR:NRR A:ADP:NRR D
- SVarga
- JPar tlow JS k
T <ur ley 07/17/89 07/18/89 0 /(P1 89 8908070048 890726 PDR ADOCK 05000250 H
'(
ADR2'RPR
- GLainas 07/17/89 D
E J
lor V
e o
0 /+89
/~59
I t
l I
j~f II
'J 0
N l'