ML17347B263
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/11/1989
From: Edison G
Office of Nuclear Reactor Regulation
To: Woody C
FLORIDA POWER & LIGHT CO.
References
TAC-63038, TAC-63039, NUDOCS 8908180415
Download: ML17347B263 (4)


Text

~gg AEg~

O~

Cy A.00 IVl illl/

gO UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 August 11, 1989 Docket Nos.

50-250 and 50-251 Mr. C. 0.

Woody, Acting Senior Vice President-Nuclear Nuclear Energy Department Florida Power and Light Company P.O.

Box 14000 Juno Beach, Florida 33408-0420

Dear Mr. Woody:

SUBJECT:

TURKEY POINT UNITS 3 AND 4 - REVISED TECHNICAL SPECIFICATIONS (TAC NOS. 63038 AND 63039)

In a June 5, 1989 letter (L-89-201) Florida Power and Light Company (FPL) submitted a proposed license amendment to replace the existing Technical Specifications (TS) with the Revised Technical Specifications (RTS) attached to the letter.

In this letter, FPL certified that the RTS are consistent with the updated Final Safety Analysis Report (FSAR) and with the as-built plant, subject to clarifications contained in the letter.

In a July 12, 1989 letter (L-89-235)

FPL also submitted their proposed changes to the updated FSAR that would result from adoption of the RTS.

The NRC staff has performed a preliminary review of the proposed RTS and FSAR changes for conformance with the existing TS, the requirements of the Standard Technical Specifications and the updated FSAR.

This review has identified a number of apparent discrepancies in details requiring clarification/resolution.

In general, the concerns identified fall into the following areas:

A.

Certain setpoints contained in the proposed RTS may not be consistent with respect to information contained within the updated FSAR.

B.

Setpoints and other values included in the RTS may not all be contained in the updated FSAR or the existing TS; some basis is 'needed for their a cceptab ility.

C.

Information contained in the existing TS is not, in all cases, contained in the RTS or updated FSAR.

D.

Miscellaneous concerns identified involving a variety of issues.

8908180415 89081k PDR ADQCK. 05000250 PNU

t/Ir., C; 0.

bloody

" August 11, 1989 w

As the'RC staff has performed only a partial review, the above areas of discrepancy may not be the only ones.

Rather, the areas of concern identified above should be considered indicative of the types of issues being raised by the review.

Specific examples of the above discrepancies were discussed in a conference call with P.

Pace and others on your staff, on August 11, 1989.

Also, as discussed in the conference call, a meeting has been scheduled on August 21, 1989 at NRC Headquarters, to discuss the issues identified.

Sincerely, Original signed by cc:

See next page Gordon E. Edison, Sr. Project Hanager Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation DISTR I BUTI ON C~kF NRC 8 Local PDRs PD22 Reading

SVarga, 14/E/4
GLainas, 14/H/3 HBer kow DNilier CNoon, 11/F/23 GEdison SHoffman OGC (info. only)
EJordan, 3302 NNBB BGrimes 9/A/2 ACRS(10 MSinku1e, RII

[TAC NOS 63038/63039j L:

-2 Pll:PDII-2 ~

D SHoffman:bid 0 /))~/89 08/II /89 PH: PDI I-2 GEdison 08/)) /89 DPD 2

Her w

08/ i/89

Mr,.-C. 0.

Woody Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Pub lic Counse 1

Room 4, Holland Building Tallahassee, Flori da 32304 John T. Butler, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Flori da 33131-2398 Mr. K.

N. Harris, Vice President Turkey Point Nuclear Plant Florida Power and Lig ht Company P.O.

Box 029100 Miami, Florida 33102 County Manager of Metropolitan Dade County 111 NW 1st Street, 29th Floor Miami, Florida 33128 Senior Resident Inspector Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission Post Office Box 57-1185 Miami, Flori da 33257-1185 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Intergovernmental Coordination and Review Office of Planning

& Budget Executive Office of the Governor The Capitol Bui lding Tallahassee, Florida 32301 Administrator Department of Environmental Regulati on Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Flori da 32301 Regional Administrator, Region II U.S.

Nuclear Regulatory Commission 101 Marietta Street, N.W. Suite 2900 Atlanta, Georgia 30323 Attorney General Department of Legal Affairs The Capitol Tallahassee, Flori da 32304 P lant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102

~,

~

t M