ML17347B231
| ML17347B231 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 07/31/1989 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17347B234 | List: |
| References | |
| NUDOCS 8908100285 | |
| Download: ML17347B231 (6) | |
See also: IR 05000250/1989031
Text
- AC CELE RATED
DlMRIBUTION
DE M04 STRIATION
SYFI'EM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8908100285
DOC.DATE: 89/07/31
NOTARIZED: NO
FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light
50-251 Turkey Point Plant, Unit 4, Florida Power and Light
AUTH.NAME
AUTHOR AFFILIATION
STOHR,J.P.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
WOODY,C.O.
Florida Power
& Light Co.
SUBJECT:
Forwards Insp Repts 50-250/89-31
& 50-251/89-31
on
890710-14.No violations or deviations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Via%ation Response
NOTES'OCKET
C
05000250
C
05000251
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL: AEOD
AEOD/TPAD
NRR SHANKMAN,S
NRR/DLPQ/PEB
NRR/DREP/EPB
10
NRR/PMAS/ILRB12
OE L
NiJ
L
02
FILE
01
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
EDISON,G
AEOD/DEIIB
DEDRO
NRR/DEST DIR
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NUDOCS-ABSTRACT
OGC/HDS2
RES MORISSEAU,D
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
R
j
S
NCTE 'IO ALL RZDS" RECIPIBGS:
PIZASE HELP US IO REMCE WASTE!
COHTACI'IHE IXCGMENI'WHRLDESK,
LISTS H3R DOCUMEHIS YOU DCSERT NEED)
TOTAL NUMBER OF COPIES REQUIRED-'TTR
23
ENCL
23
D
S
0
Docket Nos.
50-250,
50-251
License
Nos.
Florida Power and Light Company
ATTN:
Nr.
C. 0.
Woody, Acting
Senior Yice President
- Nuclear
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC INSPECTION
REPORT
NOS. 50-250/89-31
AND 50-251/89-31
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
J. L. Kreh on July 10-14,
1989.
The inspection
included
a review of activities
authorized
for your
Turkey
Point facility.
At the
conclusion
of the
inspection,
the findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
~
~
~
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Within the
scope
of the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter, please
contact us.
Sincerely,
- ~~iAL SIGNED BY
"'.-'P.'l AS M O'Of I t~5
/DC
J. Philip Stohr, Director
Division of Radiation Safety
and Safeguards
Enclosure:
NRC Inspection
Report
cc w/encl:
(See
page
2)
8908 i00285 89073 l
ADOCK 0 000250
Q
Power
and Light Company
cc w/encl:
K. N. Harris, Vice President
Turkey Point Nuclear Plant
J.
E. Cross,
Plant Hanager
Turkey Point Nuclear Plant
L.
W. Bladow, Plant
gA Superintendent
E. Lyons, Acting Regulatory
and
Compliance Supervisor
State of Florida
bcc w/encl:
G.
E. Edison, Project Nanager,
Project
Directorate II-2, Division of Reactor
Projects,
NRC Resident
Inspector
Document Control
Desk
W.
D. Travers,
NRR/EPB
J.
C. Heard, Jr.,
FEMA RIV
RI 'S
eh
7 gg/89
RII:DRSS
&WRan in
7/+89
RI 'RS
DCollins
7/z.g'89
R;
R
enjak
7+/89