Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-250/89-22 & 50-251/89-22
ML17347B248
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/03/1989
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8908150268
Download: ML17347B248 (4)


Text

gc Cp~ RATH)

DISTRIBUTION DKMON STRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

SSION NBR:8908150268 DOC.DATE: 89/08/03 NOTARIZED:

NO

.'IL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION JULIAN,C.A.

Region-2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION WOODY,C.O.

Florida Power

& Light Co:

SUBJECT:

Ack receipt of 890707 ltr informing NRC of steps taken to correct violations noted in Insp Repts 50-250,50-251/89-22.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED: LTR 2 ENCL 0 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

DOCKET 05000250 05000251 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD AEOD/TPAD NRR SHANKMAN,S NRR/DLPQ/PEB NRR/DREP/EPB

NRR/PMAS/ILRB12 OE LIEBERMAN,J

¹~N2~'I LE

AL: LPDR NSIC COPIES LTTR ENCL

1

1

1

11.

3.

RECIPIENT ID CODE/NAME EDISON,G AEOD/DEIIB DEDRO NRR/DEST DIR NRR/DOEA DIR 11 NRR/DREP/RPB

NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAUED NRC PDR COPIES LTTR ENCL R

NAZE IO ALL "RIDS" RECIPIENIS'IZASE HELP US TO REDUCE HASTE)

COHZACT THE DXXMER1 CXNIBOL DESK ROCK Pl-37 (KCI'. 20079)

IO ELIKBQZR KX3R MKE PKH DI8HGBUZICN LISTS HK DOC%KRIS KRJ DCkiiT NEZDi AL NUMBER OF COPIES REQUIRED:

LTTR

ENCL

August 3, 1989

~

(i'lorida Power and Light Company ATTN:

Nr.

C. 0. Moody, Acting Senior Vice President

- Nuclear P.

0.

Box 14000 Juno Beach, FL 33408-0420 Gentlemen:

SUBJECT'EPORT NOS..50-250/89-22 AND 50-251/89-22 Thank you for your response of July 7, 1989, to our Notice of Violation, issued on June 7,

1989, concerning activities conducted at your Turkey Point facility.

We have evaluated your response and found that it meets the requirements of

CFR 2.201.

We will examine the implementation of your corrective actions during future inspections.

Me appreciate your cooperation in this matter.

Sincerely, original signed by Caudle A. Julian Caudle A. Julian, Chief Engineering Branch Division of Reactor Safety cc:

K.

N. Harris, Vice President Turkey Point Nuclear Plant J.

E. Cross, Plant Manager Turkey Point Nuclear Plant L.

M. Bladow, Plant gA Superintendent E. Lyons, Acting Regulatory and Compliance Supervisor State of Florida bcc:

G.

E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects, NRR NRC Resident Inspector Document Control Desk G. Belisle R. Crlenjak J.

Lenahan RII:

S, JLen han:tm 08/i /89 RI I: DRS GBelisle 08/ g /89 RI

DRP RC lenjak 08/~89

~'<<i:='~- v"'6;-:

~. ~0~<.>-.

F'D Arlot::K C).-;Ol'~ra=,(-,

r Di"-,

'iio zzor

l