ML17347B276
| ML17347B276 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/10/1989 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8908250137 | |
| Download: ML17347B276 (2) | |
Text
ACCELZRATED DISAP UTION DE MONSTRUT' SYNE)rf REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8908250137 DOC.DATE: 89/08/10 NOTARIZED:
NO FACIL:50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION EBNETER,S.D.
Region 2, Ofc of the Director
.RECIP.NAME RECIPIENT AFFILIATION WOODY,C.O.
Florida Power
& Light Co.
SUBJECT:
Ack receipt of 890716 ltr requesting relief from entering action statement required by Tech Spec 3.0.1.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR ENCL
/
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES!
DOCKET 05000251 R
I D
RECIPIENT
'ID CODE/NAME PD2-2 PD INTERNAL: AEOD AEOD/TPAD LOIS, ERASMIA NRR/DEST DIR NRR/DOEA DIR 1 1 NRR/DREP/RPB 10 NUDOCS-ABSTRACT OGC/HDS2 RES MORISSEAU g D EXTERNAL: LPDR NSIC COPIES LTTR ENCL RECIPIENT ID CODE/NAME EDISON,G AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DLPQ/PEB NRR/DREP/EPB 10'RR/PMAS/
ILRB1 2 OE LIEBERMAN,J Qo 02 GN2 ILE 01 NRC PDR COPIES LTTR ENCL 0
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 4hL
AUG 1 0 1989 i~'(
Florida Power and Light Company ATTN:
Mr. C. 0. Woody, Acting Senior Vice President Nuclear P. 0.
Box 14000 Juno Beach, FL 33408-0420 Gentlemen:
SUBJECT'NFORCEMENT DISCRETION FOR TURKEY POI'NT'UNIT 4 DOCKET NO. 50-251 This letter acknowledges your letter of July 16, ~1989, requesting relief fi oui entering the action statement required by Techn'ical Specification,'3.0.
1<
In your telephone conversation
.with the Region II staff on July 18,
- 1989, you were informed that discretionary enforcement action would be granted to extend the referenced action statement one hour to allow cleaning of'he 4A IrItake Cooling Water basket strainer.
Should you have any questions regardiing this letter, please con'tact us.
Sincerely,,
cc:
K. N. Harris, Vice President Turkey Point Nuclear Plant J'.
E. Cross, Plant Manager Turkey Point Nuclear Plant L.
W. Bladow, Plant gA Superintendent E. Lyons, Acting Regulatory and Compliance Supervisor
'State of Flor ida bcc:
L. Reyes, RII M. Sinkule, RII R. Crlenjak, RII P.
Madden, RII G.
E. Edison, Project Manager, Project Directorate II-2, Division of Reactor Projects,,
NRR NRC Resident Inspector Document Control Desk Original signed by
- Stewart, D,. Ebneter Regional Adminiistrator RI:
P.
d n
07/si/89
- 39082 0 1 37~
PDR ADOCK O
RI 'D P
RC lenjak 07/',I, I/89 S90810 00025i PDC R II: DRIP MSinkule 07/g( /89 Ril:ORfI Oilyyse RII:DRP MErnst 07/
/89
- 7,