Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17354A581 + (13:20:44, 7 January 2025)
- 05000250/LER-1997-005-01, :on 970618,RCP Oil Collection Sys Was Found Outside Design Basis.Caused Because Design Did Not Consider Component Parts to Be Potential Leakage Sources.Entire RCP Oil Collection Sys Was Reviewed + (13:20:45, 7 January 2025)
- ML17354A576 + (13:20:47, 7 January 2025)
- ML17354A578 + (13:20:47, 7 January 2025)
- L-97-155, Forwards Turkey Point Plant Unit 3 1997 Refueling Outage ISI Rept, IAW Provisions of ASME Code,Section XI + (13:20:48, 7 January 2025)
- L-97-176, Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2 + (13:20:50, 7 January 2025)
- L-97-173, Requests NRC Review & Concurrence W/Proposed Mod in Fitness for Duty Program,Eliminating Mandatory Fifteen Minute Observation Period for Breath Alcohol Concentration (Bac) Test for All Donors as Listed + (13:20:51, 7 January 2025)
- L-97-170, Forwards Revs to EPIPs 0-EPIP-20132, Technical Support Ctr (TSC) Activation & Operation & 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training. Description of Revs,Attached + (13:20:53, 7 January 2025)
- L-97-163, Provides Update to Written Notice of Claim Involving Alleged Bodily Injury Arising Out Of,Or in Connection With,Use of Radioactive Matl at Plant.Case Was Dismissed by Us District Court on 970606 + (13:20:55, 7 January 2025)
- L-97-143, Informs of Util Intention to Conduct Graded Review of Turkey Point Fsar.Reviews Are Expected to Be Completed by 980118 + (13:20:57, 7 January 2025)
- ML17354A565 + (13:21:03, 7 January 2025)
- ML17354A563 + (13:21:04, 7 January 2025)
- ML17354A561 + (13:21:05, 7 January 2025)
- ML17354A560 + (13:21:07, 7 January 2025)
- ML17354A558 + (13:21:08, 7 January 2025)
- NUREG-0725, Responds to Forwarding Question from Constituent J Ryan,On Possible Shipments of Nuclear Fuel Rods from Miami to Utah.Nrc Not Aware of Potential Shipments of Irradiated Reactor fuel.NUREG-0725,rev 11 Encl.W/O Encl + (13:21:09, 7 January 2025)
- ML17354A554 + (13:21:12, 7 January 2025)
- ML17354A553 + (13:21:13, 7 January 2025)
- L-97-154, Comment Opposing Proposed NRC Bulletin 96-001,suppl 1, CR Insertion Problems + (13:21:14, 7 January 2025)
- ML17354A550 + (13:21:18, 7 January 2025)
- ML17354A549 + (13:21:19, 7 January 2025)
- ML17354A547 + (13:21:20, 7 January 2025)
- ML17354A548 + (13:21:20, 7 January 2025)
- ML17354A546 + (13:21:21, 7 January 2025)
- ML17354A544 + (13:21:22, 7 January 2025)
- ML17354A545 + (13:21:22, 7 January 2025)
- ML17354A542 + (13:21:23, 7 January 2025)
- ML17354A543 + (13:21:23, 7 January 2025)
- ML17354A541 + (13:21:24, 7 January 2025)
- ML17354A540 + (13:21:25, 7 January 2025)
- ML17354A539 + (13:21:25, 7 January 2025)
- ML17354A538 + (13:21:26, 7 January 2025)
- ML17354A537 + (13:21:27, 7 January 2025)
- ML17354A536 + (13:21:28, 7 January 2025)
- ML17354A535 + (13:21:29, 7 January 2025)
- L-97-148, Forwards Annual Update of FPL Topical QA Rept (Tqar).Summary of Changes Made to Tqar,Also Encl + (13:21:30, 7 January 2025)
- ML17354A534 + (13:21:30, 7 January 2025)
- ML17354A531 + (13:21:35, 7 January 2025)
- ML17354A530 + (13:21:36, 7 January 2025)
- ML17354A528 + (13:21:40, 7 January 2025)
- ML17354A527 + (13:21:41, 7 January 2025)
- L-97-152, Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4 + (13:21:42, 7 January 2025)
- L-97-132, Requests NRC Review of & Concurrence W/Proposed Mod in Utils FFD Program + (13:21:46, 7 January 2025)
- ML17354A523 + (13:21:50, 7 January 2025)
- IR 05000250/1997004 + (13:22:09, 7 January 2025)
- ML17354A520 + (13:22:11, 7 January 2025)
- ML17354A518 + (13:22:12, 7 January 2025)
- ML17354A517 + (13:22:14, 7 January 2025)
- ML17354A516 + (13:22:15, 7 January 2025)
- L-97-133, Provides Util Rept for Units 3 & 4 Since Last Rept Re Nature of Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Affect Peak Clad Temp Calculation + (13:22:19, 7 January 2025)
- 05000251/LER-1997-002-02, :on 970423,automatic Reactor Tripped.Caused by Actuation of Turbine Overspeed Protection Circuit. Administrative Procedures Governing Inadequate Work Controls Will Be Revised to Capture Lessons Learned + (13:22:22, 7 January 2025)
- ML17354A511 + (13:22:24, 7 January 2025)