Confirms Arrangements Made in Telcon on 970515 Between G Hopper & G Blinde for Administration of Licensing Exam at Plant.Written Exam Scheduled for 970905 & Operating Tests Scheduled for Wk of 970908
ML17354A516
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/23/1997
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Plunkett T
FLORIDA POWER & LIGHT CO.
References
50-250-97-300, 50-251-97-300, NUDOCS 9706040272
Download: ML17354A516 (8)


Text

CATEGORY 2W REGULAT~ INFORMATION DISTRIBUTIO~YSTEM (RIDS)

ACCESSION NBR:9706040272 DOC.DATE: 97/05/23 NOTARIZED: NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION PEEBLES,T.A.

Region 2 (Post 820201)

RECIP.NAME RECIPIENT AFFILIATION PLUNKETT,T.F.

Florida Power

& Light Co.

DOCKET 05000250 05000251

SUBJECT:

Confirms arrangements made in telcon on 970515 between G Hopper

& G Blinde for administration of licensing exam at plant. Written exam is scheduled for 970905 S operating tests are scheduled for wk of 970908.

DISTRIBUTION CODE:

IE42D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Operator Licensing Examination Reports NOTES:

RECIPIENT-ID CODE/NAME PD2-3 PD INTERNAL FILE CEN NRRRR'DRCH/HOLB EXTERNAL: NOAC COPIES LTTR ENCL RECIPIENT ID CODE/NAME CROTEAU,R NRR/DRCH/HHFB RGN2 FILE 01 NRC PDR COPIES LTTR ENCL D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 8

ENCL

Hay 23, 1997 O

lA0'90lA 01OL IAO OO h lA O'O NC

+O CllU OA

<C OlX

+pl 0'0 >

0<00 Florida Power and Light Company ATTN:

Hr. T. F. Plunkett President

- Nuclear Division P. 0.

Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

SENIOR REACTOR OPERATOR INITIALEXAHINATIONS TURKEY POINT NUCLEAR PLANT - EXAHINATION REPORT NOS. 50-250/97-300 AND 50-251/97-300

Dear Hr. Plunkett:

In a telephone conversation on Hay 15,

1997, between Hr. George
Hopper, License Examiner, and Hr. Glen Blinde, arrangements were made for the administration of licensing examinations at the Turkey Point Nuclear Plant.

The written examination is scheduled for September 5, 1997.

The operating tests are scheduled for the week of September 8,

1997.

This examination will be developed and administered as part of the NRC pilot initial examination process based on your staff's request to participate in the pilot process.

The NRC pilot initial examination process will permit your staff to draft the written examinations and operating tests for operator and senior operator license applicants.

The NRC will review and approve the'roposed examinations and tests and independently administer the operat'ing tests to license applicants.

Your staff will not administer any portion of the operating tests;

however, they will administer the written examinations.

The NRC will review the graded written examinations, grade each applicant's operating test performance, make the final pass or fail decisions, and issue

licenses, as appropriate.

Your staff will develop the licensing examinations in accordance with the guidelines in Revision 7, Supplement 1, of NUREG-1021, "Operator Licensing Examiner Standards,".

Additional information on the development of the licensing examinations will be issued separately.

To prepare and administer the examinations on the above schedule, Hr. Hopper, License Examiner, identified to Hr. Blinde the subset of reference materials identified in Attachment 2 of ES-201 that would be necessary under the pilot process.

This material should be submitted by August 4, 1997.

Your staff will prepare and, after NRC review and approval, administer the written examinations in accordance with ES-401 and ES-402 of NUREG-1021.

The NRC's guidelines for administering the written examinations are described in ES-402, Attachment l.

Your staff will prepare and the NRC will administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021.

In order to conduct the requested operating tests, it will be necessary for your staff'o make the simulation facility available on the dates noted above.

Your staff should retain the original simulatis performance data (e.g.,

system pressures, temperatures, and levels) gener ated during the dynamic operating tests until ghg examination results are final.

FPSL ES-402,,

and ES-302, Attachment 1, contain a number of NRC policies and guidelines that will be in effect while the written examination and operating tests are being administered.

Your staff should submit preliminary reactor and senior reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waiver s. If the applications are not received at least 30 days before the examination date, a

postponement may be necessary.

Finally, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (OMB) Clear ance Number 3150-0101, which expires April 30, 2000

~

The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, includes gathering,

xeroxing, and mailing the required materials Send comments about this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Hail Stop T-6, F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C. 20503.

We appreciate your cooper ation.

Hr. Blinde has been advised of'he NRC guidelines and policies addressed in this letter. If you have any guestio'ns on the examination process, please contact me at (404) 562-4638 or E-mail address TAPQNRC.GOY.

Sincerely, Docket Nos. 50-250, 50-251 (ORIGINAL SIGNED BY H.

CHRISTENSEN FOR)

Thomas A. Peebles, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety cc:

H.

N. Paduano, Manager Licensing and Special Programs Florida Power and Light Company P. 0. Box 14000 Juno Beach, FL 33408-0420 Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035 cc cont'd:

See page 3

FP&L cc cont'd:

R. J.

Hovey Site Yice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035 G. E. Hollinger Licensing Hanager Turkey. Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035 N. S. Ross, Attorney Florida Power

& Light P. 0. Box 14000 Juno Beach, FL 33408-0420 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center Miami, FL 33131-2398 Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services "1317 Winewood Boulevard Tallahassee, FL 32399-0700 Armando Vidal County Hanager of Hetropolitan Dade County 111 NW 1st Street, 29th Floor
Niami, FL 33128 Joe Hyers, Director Division of Em rgency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Hr. William Lindsey Training Hanager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035 D1stribution:

R. Croteau, NRR K. Landis, RII B. R. Crowley, RII G. Hopper, RII PUBLIC Thomas P. Johnson Senior Resident Inspector U.S. Nuclear Regulatory Commission P. 0. Box 1448 Homestead, FL 33090 SIGHATlRE COPYY Per.~~0 OS t / 97 ES Ho OL POC 05/Li /97 YES 0

OSIS>/97 E

NO 0

/97 YE NO 05 I I 97 05 I I 97 YES NO YES NO